Avi Edri
- Listed as
- authorized agent-others, contractor, designer, pmt consultant/expediter, subcontractor
- Firm
- Edri Construction Inc *See Notes*
- Based in
- San Francisco
- On San Francisco permits
- Sep 2020 to Sep 2026
213 permits since 2000 (contractor on 212 permits, authorized agent-others on 10 permits, designer on 1 permit, pmt consultant/expediter on 1 permit, subcontractor on 1 permit): 165 completed, 31 in progress, 8 never finaled, 9 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 213.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 24, 2026 | In progress issued Sep 2026 | 149 Anderson St | Edri Construction Inc *See Notes* | add a bathroom to the basement.Details
add a bathroom to the basement. | $150,000 |
| Aug 20, 2026 | In progress filed Aug 2026, not yet issued | 18 Tiffany Av | Edri Construction Inc *See Notes* | alt of 2 units comprising of 4 bedrooms and 2 baths, kitchen and new stairs will be repaced. add foundation and retmain wall in back yard. reconfig 1/f unit, remodel 2/f.Details
alt of 2 units comprising of 4 bedrooms and 2 baths, kitchen and new stairs will be repaced. add foundation and retmain wall in back yard. reconfig 1/f unit, remodel 2/f. | $720,000 |
| Aug 12, 2026 | In progress issued Aug 2026 | 158 15th Av | Edri Construction Inc *See Notes* | revision to 202208251288: specify location of 3' x 3' catch basin in garage & sink in rear family room on level 1Details
revision to 202208251288: specify location of 3' x 3' catch basin in garage & sink in rear family room on level 1 | |
| Aug 4, 2026 | In progress filed Aug 2026, not yet issued | 20 Santa Marina St | Edri Construction Inc *See Notes* | revision to permit no : 202501087939. lightwell infill, glass block on 1st floor and rated wall on 2nd floor, concrete foundation rev. add 2 new skylightsDetails
revision to permit no : 202501087939. lightwell infill, glass block on 1st floor and rated wall on 2nd floor, concrete foundation rev. add 2 new skylights | $2,000 |
| Jun 23, 2026 | In progress issued Jul 2026 | 143 Peralta Av | Edri Construction Inc *See Notes* | remodel (e) kitchen. remove bearing wall between kitchen and dining room. add double french door in the kitchen.Details
remodel (e) kitchen. remove bearing wall between kitchen and dining room. add double french door in the kitchen. | $55,000 |
| Jun 16, 2026 | In progress issued Jul 2026 | 158 15th Av | Edri Construction Inc *See Notes* | revision to 202208251288: increase the size of patio & accomodating retaining walls at ground flDetails
revision to 202208251288: increase the size of patio & accomodating retaining walls at ground fl | $10,000 |
| Jun 15, 2026 | In progress issued Jun 2026 | 255 Anderson St | Edri Construction Inc *See Notes* | revision to pa #202602266565 to include foundation for the exterior staircase. current plan states to use existing but upon work beggining. no existing foundation existing.Details
revision to pa #202602266565 to include foundation for the exterior staircase. current plan states to use existing but upon work beggining. no existing foundation existing. | $10,000 |
| Jun 8, 2026 | In progress filed Jun 2026, not yet issued | 371 Banks St | Edri Construction Inc *See Notes* | 1/f: remodel - seismic retofit and addition of bonus room on 1/f. new windows and doors at street and back. new stairs up to entryDetails
1/f: remodel - seismic retofit and addition of bonus room on 1/f. new windows and doors at street and back. new stairs up to entry | $250,000 |
| Jun 5, 2026 | In progress issued Sep 2026 | 420 Folsom St | Edri Construction Inc *See Notes* | ab17 soft demo: removal of (e) floor finishes and raised floor areas noted in plan. removal of (e) lockers and mill work. removal of (e) new structural interior partitons, interior glazing walls, doors, removal of (e) sink, water fountain and mop sink. removal of interior finishes around colums.Details
ab17 soft demo: removal of (e) floor finishes and raised floor areas noted in plan. removal of (e) lockers and mill work. removal of (e) new structural interior partitons, interior glazing walls, doors, removal of (e) sink, water fountain and mop sink. removal of interior finishes around colums. | $30,000 |
| May 20, 2026 | In progress issued May 2026 | 19 Elsie St | Edri Construction Inc *See Notes* | kitchen remodel. like for like.(100sf)Details
kitchen remodel. like for like.(100sf) | $50,000 |
| Apr 29, 2026 | In progress issued May 2026 | 158 15th Av | Edri Construction Inc *See Notes* | modification to garage opening; revision to main permit pa#202208251288 and revision permits pa#202508052323 and pa#202602095519Details
modification to garage opening; revision to main permit pa#202208251288 and revision permits pa#202508052323 and pa#202602095519 | $50,000 |
| Apr 29, 2026 | Completed final sign-off Aug 2026 | 211 Moscow St | Edri Construction Inc *See Notes* | bathroom remodel like for likeDetails
bathroom remodel like for like | $40,000 |
| Mar 27, 2026 | In progress issued Apr 2026 | 2480 Fulton St | Edri Construction Inc *See Notes* | unit#1: laundry room remodel - like for like, upgrade mep to code.Details
unit#1: laundry room remodel - like for like, upgrade mep to code. | $20,000 |
| Mar 11, 2026 | In progress filed Mar 2026, not yet issued | 214 States St | Edri Construction Inc *See Notes* | remodel and expand (e) 3-story residence.include vert,int mods to create 4-store bldg w/ penthouse and 1 adu unit. scope includes new retianing walls at rear yard to facilitate site access from museum wy.Details
remodel and expand (e) 3-story residence.include vert,int mods to create 4-store bldg w/ penthouse and 1 adu unit. scope includes new retianing walls at rear yard to facilitate site access from museum wy. | $874,500 |
| Feb 27, 2026 | Completed final sign-off Aug 2026 | 32 Forest Knolls Dr | Edri Construction Inc *See Notes* | interior renovation - replacing (e) interior staircase. modifying upper level bathroom to accommodate stair. partial interior lower level renovation to living spaces. replace (e) lower level pedestrian door with window and wall infill.Details
interior renovation - replacing (e) interior staircase. modifying upper level bathroom to accommodate stair. partial interior lower level renovation to living spaces. replace (e) lower level pedestrian door with window and wall infill. | $250,000 |
| Feb 9, 2026 | In progress issued Feb 2026 | 158 15th Av | Edri Construction Inc *See Notes* | revision to pa 202208251288 foundation supportDetails
revision to pa 202208251288 foundation support | $50,000 |
| Dec 24, 2025 | Completed final sign-off Jul 2026 | 601 Van Ness Av | Edri Construction Inc *See Notes* | apt 23: master bathroom remodel like for like, replace shower, toilet, sink, vanity, mep to code 50 sq ft. kitchen remodel, like for like 80 sq ft. add six lights.keep (e) accssesbility.Details
apt 23: master bathroom remodel like for like, replace shower, toilet, sink, vanity, mep to code 50 sq ft. kitchen remodel, like for like 80 sq ft. add six lights.keep (e) accssesbility. | $80,000 |
| Dec 10, 2025 | In progress issued Dec 2025 | 212 Elsie St | Edri Construction Inc *See Notes* | 2000 sq ft siding from wood planks on front side wall. side and back side wall wood planks to hardy baker planksDetails
2000 sq ft siding from wood planks on front side wall. side and back side wall wood planks to hardy baker planks | $20,000 |
| Dec 4, 2025 | In progress issued Dec 2025 | 2715 Bush St | Edri Construction Inc *See Notes* | 2715 and 2717: kitchen and bathroom remodel like for like for both top and bottom units. 2717 will be half bathroom remodel.Details
2715 and 2717: kitchen and bathroom remodel like for like for both top and bottom units. 2717 will be half bathroom remodel. | $75,000 |
| Nov 26, 2025 | In progress issued Jun 2026 | 1025 Ashbury St | Igreen Builders Inc. | garage/basement lvl: excavate vertical & horizontal (e)garage area to create ceiling height & flr area; excavate adjacent crawl space area for (n) habitable areas (office, bathrm, inter stairs,laundry rm); 1/f inter remodel & in-fill (e) light well on south facade; 2/f inter remodel & in-fill (e) lDetails
garage/basement lvl: excavate vertical & horizontal (e)garage area to create ceiling height & flr area; excavate adjacent crawl space area for (n) habitable areas (office, bathrm, inter stairs,laundry rm); 1/f inter remodel & in-fill (e) light well on south facade; 2/f inter remodel & in-fill (e) l | $650,000 |
| Nov 14, 2025 | Completed final sign-off Dec 2025 | 489 30th St | Edri Construction Inc *See Notes* | demo partial stucco around the windows in front of houise. install (n) windows and flashing (6) . patch stucco at front of house. max u-factor 0.30.Details
demo partial stucco around the windows in front of houise. install (n) windows and flashing (6) . patch stucco at front of house. max u-factor 0.30. | $30,000 |
| Nov 13, 2025 | Expired or cancelled cancelled Jul 2026 | 162 15th Av | Edri Construction Inc *See Notes* | partial foundation replacement in response to pa # 202508193412Details
partial foundation replacement in response to pa # 202508193412 | $6,000 |
| Nov 13, 2025 | In progress issued Nov 2025 | 154 15th Av | Edri Construction Inc *See Notes* | grouting in response to pa # 202508193412Details
grouting in response to pa # 202508193412 | $6,000 |
| Nov 13, 2025 | Completed final sign-off May 2026 | 1021 Cortland Av | Edri Construction Inc *See Notes* | kitchen remodel, like for like.Details
kitchen remodel, like for like. | $66,000 |
| Nov 12, 2025 | In progress filed Nov 2025, not yet issued | 20 Santa Marina St | Edri Construction Inc *See Notes* | structural revision to permit 202501087939. foundation repair to add another section of foundation to replace old brick foundation.Details
structural revision to permit 202501087939. foundation repair to add another section of foundation to replace old brick foundation. | |
| Nov 10, 2025 | Completed final sign-off Jan 2026 | 86 Manzanita Av | Edri Construction Inc *See Notes* | whole bldg: reframe dryrot in facade of bldg, front of bldg, street facing. replace in kindDetails
whole bldg: reframe dryrot in facade of bldg, front of bldg, street facing. replace in kind | $15,000 |
| Oct 20, 2025 | Completed final sign-off Jan 2026 | 86 Manzanita Av | Edri Construction Inc *See Notes* | replace all stucco & paper at front of house; reference permit #202507150837.Details
replace all stucco & paper at front of house; reference permit #202507150837. | $5,000 |
| Sep 17, 2025 | In progress issued Sep 2025 | 1403 Willard St | Edri Construction Inc *See Notes* | roof deck repair above garage, like for like less than 50% repair.Details
roof deck repair above garage, like for like less than 50% repair. | $73,000 |
| Sep 15, 2025 | Completed final sign-off Nov 2025 | 66 Cleary Ct | Edri Construction Inc *See Notes* | unit 603: revision to pa 202509084783, changing tub to walk in shower, bathroom remodel.Details
unit 603: revision to pa 202509084783, changing tub to walk in shower, bathroom remodel. | $5,000 |
| Sep 8, 2025 | Completed final sign-off Nov 2025 | 66 Cleary Ct | Edri Construction Inc *See Notes* | remodel one kitchen in kind in unit 603. no moving walls. appprox. 104 sq ft.Details
remodel one kitchen in kind in unit 603. no moving walls. appprox. 104 sq ft. | $5,000 |
| Aug 15, 2025 | Completed final sign-off Sep 2025 | 1679 09th Av | Edri Construction Inc *See Notes* | remove existing stucco install new stucco finish. paint the front of the house 75 sq ft. to comply with nov 202540762 # 2. remove plaster finish that us falling apart and replace with stucco.Details
remove existing stucco install new stucco finish. paint the front of the house 75 sq ft. to comply with nov 202540762 # 2. remove plaster finish that us falling apart and replace with stucco. | $15,000 |
| Aug 12, 2025 | Expired or cancelled withdrawn Feb 2026 | 158 15th Av | Edri Construction Inc *See Notes* | revision to pa # 202208251288 & 202508052323: restore old foundation section a. continue foundation repair in way of underpinning rather than section replacement.Details
revision to pa # 202208251288 & 202508052323: restore old foundation section a. continue foundation repair in way of underpinning rather than section replacement. | |
| Aug 8, 2025 | Completed final sign-off Jun 2026 | 1527 Sanchez St | Edri Construction Inc *See Notes* | replacement in kind of (e) wood framed egress staircase with new conc footings & the addition of a 1-hour firewall at side property line location.Details
replacement in kind of (e) wood framed egress staircase with new conc footings & the addition of a 1-hour firewall at side property line location. | $60,000 |
| Aug 7, 2025 | Completed final sign-off Sep 2026 | 254 Laussat St | Edri Construction Inc *See Notes*, Estate Builders Inc. | bathroom remodel. like for like. 40 sq. ft.Details
bathroom remodel. like for like. 40 sq. ft. | $28,192 |
| Aug 5, 2025 | In progress issued Aug 2025 | 158 15th Av | Edri Construction Inc *See Notes* | revision to pa# 202208251288: foundation replacement.Details
revision to pa# 202208251288: foundation replacement. | $119,000 |
| Jul 25, 2025 | Completed final sign-off Jul 2026 | 160 Vicksburg St | Edri Construction Inc *See Notes* | 1 bathroom remodel like for like.Details
1 bathroom remodel like for like. | $71,580 |
| Jul 25, 2025 | Completed final sign-off Jun 2026 | 1612 Anza St | Edri Construction Inc *See Notes* | bathroom and kitchen remodel. like for like. no structural workDetails
bathroom and kitchen remodel. like for like. no structural work | $101,000 |
| Jul 22, 2025 | Completed final sign-off Dec 2025 | 155 Hartford St | Edri Construction Inc *See Notes* | renovation of kitchen , 2nd floor bathroom, flooring and interior stair railing. localized bearing wall remodel, related framing strengthening. window infill at lightwell.Details
renovation of kitchen , 2nd floor bathroom, flooring and interior stair railing. localized bearing wall remodel, related framing strengthening. window infill at lightwell. | $65,000 |
| Jul 15, 2025 | Completed final sign-off Jan 2026 | 86 Manzanita Av | Edri Construction Inc *See Notes* | install 6 new fiberglass windows in kind and install scaffoldingDetails
install 6 new fiberglass windows in kind and install scaffolding | $5,000 |
| Jul 1, 2025 | Completed final sign-off Oct 2025 | 3882 Noriega St | Edri Construction Inc *See Notes* | install 6 new vinyl windows, 1 vinyl siding patio door, remove existing windows to add new water proofing and re-install, install scaffolding towards the back of the house, all work will be doneon back of house, no work visible from street, in kind.Details
install 6 new vinyl windows, 1 vinyl siding patio door, remove existing windows to add new water proofing and re-install, install scaffolding towards the back of the house, all work will be doneon back of house, no work visible from street, in kind. | $8,000 |
| Jun 25, 2025 | Completed final sign-off Jan 2026 | 370 Maynard St | Edri Construction Inc *See Notes* | demolition of a section of the existing foundation, build of the appropriate section of a new foundation. build new framing to replace old framing according to the plan. install new electrical outlets.Details
demolition of a section of the existing foundation, build of the appropriate section of a new foundation. build new framing to replace old framing according to the plan. install new electrical outlets. | $131,000 |
| Jun 20, 2025 | Completed final sign-off Nov 2025 | 1093 Dolores St | Edri Construction Inc *See Notes* | unit 4: bathroom(40 sq ft) and kitchen( 60 sq ft) remodel, no structural changes, like for like. rewire whole house & subpanel 100ampDetails
unit 4: bathroom(40 sq ft) and kitchen( 60 sq ft) remodel, no structural changes, like for like. rewire whole house & subpanel 100amp | $40,000 |
| Jun 10, 2025 | Completed final sign-off Dec 2025 | 1130 Moraga St | Edri Construction Inc *See Notes* | kitchen and bathroom remodel like for like rewire entire house. subpanel upgrade 100 amps bathroom. 40 sq ft shower.Details
kitchen and bathroom remodel like for like rewire entire house. subpanel upgrade 100 amps bathroom. 40 sq ft shower. | $40,000 |
| Jun 10, 2025 | Completed final sign-off Dec 2025 | 155 Hartford St | Edri Construction Inc *See Notes* | kitchen and bathroom remodel like for like. bathroom 50 sq ft. (tub)Details
kitchen and bathroom remodel like for like. bathroom 50 sq ft. (tub) | $25,000 |
| May 30, 2025 | Completed final sign-off Dec 2025 | 139 19th Av | Edri Construction Inc *See Notes* | 2 bathroom remodels like for like. no structural changes.Details
2 bathroom remodels like for like. no structural changes. | $50,000 |
| May 30, 2025 | Completed final sign-off Jun 2026 | 146 Peralta Av | Edri Construction Inc *See Notes* | kitchen remodel like for like. no structural changes. install tankless water heater.Details
kitchen remodel like for like. no structural changes. install tankless water heater. | $50,000 |
| May 21, 2025 | Completed final sign-off Dec 2025 | 1544 Cole St | Edri Construction Inc *See Notes* | revision to permit# 202504104158: 1. correct existing condition of storage room on first floor and demo closet. 2. remove laundry room from proposed plans.Details
revision to permit# 202504104158: 1. correct existing condition of storage room on first floor and demo closet. 2. remove laundry room from proposed plans. | |
| May 21, 2025 | Completed final sign-off May 2026 | 4156 23rd St | Edri Construction Inc *See Notes* | powder room remodel like for like, no structural changes. no change to floor layout. no change to wall layout. no structural work.Details
powder room remodel like for like, no structural changes. no change to floor layout. no change to wall layout. no structural work. | $20,000 |
| Apr 22, 2025 | In progress issued May 2025 | 212 Elsie St | Edri Construction Inc *See Notes* | remodel (e) kitchen and bathroom on the 2nd floor. convert ground floor into living space and add new master bedroom and bathroom. replace (e) furnace and water heater.Details
remodel (e) kitchen and bathroom on the 2nd floor. convert ground floor into living space and add new master bedroom and bathroom. replace (e) furnace and water heater. | $180,000 |
| Apr 18, 2025 | Completed final sign-off Jun 2025 | 3298 Washington St | Edri Construction Inc *See Notes* | bathroom remodel no structural changes like for like replace toilet, vanity, sink, fan, shower upgrade mep to code.Details
bathroom remodel no structural changes like for like replace toilet, vanity, sink, fan, shower upgrade mep to code. | $25,000 |
| Apr 14, 2025 | Completed final sign-off Dec 2025 | 219 Corbett Av | Edri Construction Inc *See Notes*, International Cadd Services Inc | to relocate plumbing fixtures at bathroom hall. create a new bathroom at back of bedroom. plumbing and electrical work involvedDetails
to relocate plumbing fixtures at bathroom hall. create a new bathroom at back of bedroom. plumbing and electrical work involved | $60,000 |
| Apr 10, 2025 | Completed final sign-off Apr 2026 | 1544 Cole St | Edri Construction Inc *See Notes* | kitchen remodel with plans - removing a wallDetails
kitchen remodel with plans - removing a wall | $70,000 |
| Mar 28, 2025 | Completed final sign-off Jul 2025 | 300 Montecito Av | Edri Construction Inc *See Notes* | 1) violation correction or the following complaint: #202427190,202426487 and 202307472. 2) remove car port roof structure 3) remove shower in garage bathroom. 4) legalize half bathroom arage (basement)Details
1) violation correction or the following complaint: #202427190,202426487 and 202307472. 2) remove car port roof structure 3) remove shower in garage bathroom. 4) legalize half bathroom arage (basement) | $15,000 |
| Mar 27, 2025 | Completed final sign-off Aug 2026 | 631 Ofarrell St | Edri Construction Inc *See Notes* | unit 2101: remodel full kitchen & 2 master batthroom & 1/2 bathroom. all work like for like. no alteration of wall, windows or doorDetails
unit 2101: remodel full kitchen & 2 master batthroom & 1/2 bathroom. all work like for like. no alteration of wall, windows or door | $250,000 |
| Mar 13, 2025 | Completed final sign-off Jun 2025 | 146 Peralta Av | Edri Construction Inc *See Notes* | middle building - unit b: one bathroom and one kitchen remodel like for like. no wall demolition or construction, no change in plumbing fixture count.Details
middle building - unit b: one bathroom and one kitchen remodel like for like. no wall demolition or construction, no change in plumbing fixture count. | $50,000 |
| Feb 13, 2025 | In progress issued Sep 2025 | 20 Santa Marina St | Edri Construction Inc *See Notes* | demolishing the 2 story rear yard deck, combining the existing 20 santa marina w/ 22 santa marina & creating 1 story studio addition to rear yard to replace (e) 20 santa marina. top flr will be incorporated as part of 22 santa marina & get addition of another bedroom upstaris.Details
demolishing the 2 story rear yard deck, combining the existing 20 santa marina w/ 22 santa marina & creating 1 story studio addition to rear yard to replace (e) 20 santa marina. top flr will be incorporated as part of 22 santa marina & get addition of another bedroom upstaris. | $250,000 |
| Feb 12, 2025 | Completed final sign-off Nov 2025 | 4156 23rd St | Edri Construction Inc *See Notes* | remodel existing kitchen. remove bearing wall between kitchen and dining room, add new post and beams.Details
remodel existing kitchen. remove bearing wall between kitchen and dining room, add new post and beams. | $60,000 |
| Feb 4, 2025 | Completed final sign-off Sep 2025 | 71 Knollview Wy | Edri Construction Inc *See Notes* | kitchen and bath room remodel like for like no structural changes, no layout changes, no plumbing and electric relocationDetails
kitchen and bath room remodel like for like no structural changes, no layout changes, no plumbing and electric relocation | $45,000 |
| Jan 31, 2025 | In progress filed Jan 2025, not yet issued | 522 Ortega St | Edri Construction Inc *See Notes* | conversion of primary entrance from 2nd to 1st floor.relocate of entrance,conversion of 631sf of (e) grage and unconditioned area to living room.removal of (e) stairs.infill to add 34sf at 1/f, relocate kitchen to 1/f and installation of the new bathroom.reconfig of (e) exterior and rear back stairsDetails
conversion of primary entrance from 2nd to 1st floor.relocate of entrance,conversion of 631sf of (e) grage and unconditioned area to living room.removal of (e) stairs.infill to add 34sf at 1/f, relocate kitchen to 1/f and installation of the new bathroom.reconfig of (e) exterior and rear back stairs | $318,700 |
| Jan 29, 2025 | Completed final sign-off Apr 2025 | 1619 Vallejo St | Edri Construction Inc *See Notes* | remodel e) bathroom & add a new bathroom, remodel e) kitchen, replace appliances only on 3rd fl, no exterior work moving non bearing wallsDetails
remodel e) bathroom & add a new bathroom, remodel e) kitchen, replace appliances only on 3rd fl, no exterior work moving non bearing walls | $60,000 |
| Jan 28, 2025 | Completed final sign-off Oct 2025 | 2298 03rd St | Edri Construction Inc *See Notes* | first time t.i. of 1048 sq ft ground floor space including plumbing fixtures for an accessible bathroom, remove and replace front door, new and paint. no structural work. mep deferred.Details
first time t.i. of 1048 sq ft ground floor space including plumbing fixtures for an accessible bathroom, remove and replace front door, new and paint. no structural work. mep deferred. | $30,000 |
| Jan 23, 2025 | Completed final sign-off May 2025 | 434 Page St | Edri Construction Inc *See Notes* | bathroom remodel like for like no wall removal or layout changeDetails
bathroom remodel like for like no wall removal or layout change | $20,000 |
| Dec 20, 2024 | In progress issued Jan 2025 | 212 Elsie St | Edri Construction Inc *See Notes* | replace brick foundation with reinforce concrete foundation and lower concrete slab 18" on the ground floor. foundation replacement only.Details
replace brick foundation with reinforce concrete foundation and lower concrete slab 18" on the ground floor. foundation replacement only. | $95,000 |
| Dec 13, 2024 | Completed final sign-off Oct 2025 | 212 Day St | Edri Construction Inc *See Notes* | full bathroom remodel like for like.Details
full bathroom remodel like for like. | $30,000 |
| Dec 13, 2024 | Completed final sign-off Mar 2025 | 735 Ellsworth St | Edri Construction Inc *See Notes* | siding replacement - back side only replace siding like for like hardie cement boardsiding 900 sqftDetails
siding replacement - back side only replace siding like for like hardie cement boardsiding 900 sqft | $30,000 |
| Dec 10, 2024 | Completed final sign-off Dec 2025 | 2534 Chestnut St | Edri Construction Inc *See Notes* | revision to (e) permit#: 202102205052. revise structural sheet to remove stairs to roof from scope and revise roof deck size. remodel (e) kitchen and bathrooms on 2nd floor. add master bedroom closet and bathroom on 4th floor.Details
revision to (e) permit#: 202102205052. revise structural sheet to remove stairs to roof from scope and revise roof deck size. remodel (e) kitchen and bathrooms on 2nd floor. add master bedroom closet and bathroom on 4th floor. | $50,000 |
| Nov 15, 2024 | Completed final sign-off Feb 2025 | 1686 Great Hy | Edri Construction Inc *See Notes* | revision to pa #2024-0809-8369 replace dry rotted framing (beams, studs, sill plates) in kindDetails
revision to pa #2024-0809-8369 replace dry rotted framing (beams, studs, sill plates) in kind | $10,000 |
| Nov 15, 2024 | In progress issued Feb 2025 | 820 Lawton St | Edri Construction Inc *See Notes* | revision to pa #202404160099: remove existing shelf to make room for installation move 2" lights to 18", add shower + 3 balcony lights, re-install laundry chute + radiant + heat system in utility room floors 1-3. remove 3 2" lights from dinging area to western wall, + 2 " lights next to fireplace,Details
revision to pa #202404160099: remove existing shelf to make room for installation move 2" lights to 18", add shower + 3 balcony lights, re-install laundry chute + radiant + heat system in utility room floors 1-3. remove 3 2" lights from dinging area to western wall, + 2 " lights next to fireplace, | $10,000 |
| Nov 7, 2024 | Completed final sign-off Mar 2025 | 121 Ortega St | Edri Construction Inc *See Notes* | replace siding at rear of house. ref 202312192734Details
replace siding at rear of house. ref 202312192734 | $10,000 |
| Sep 20, 2024 | Completed final sign-off Aug 2025 | 572 Anderson St | Edri Construction Inc *See Notes* | remodel (e) hallway bathroom. reconfigure (e) laundry & add 1/2 bath. replace part of exterior siding and window trims like for like. remove all gas lines from dwellingDetails
remodel (e) hallway bathroom. reconfigure (e) laundry & add 1/2 bath. replace part of exterior siding and window trims like for like. remove all gas lines from dwelling | $70,000 |
| Sep 20, 2024 | Completed final sign-off Feb 2025 | 1412 Cortland Av | Edri Construction Inc *See Notes* | remove (e) deck and provide (construct) new deck.Details
remove (e) deck and provide (construct) new deck. | $10,000 |
| Aug 27, 2024 | Completed final sign-off Nov 2024 | 2655 15th Av | Edri Construction Inc *See Notes* | change tiles of street facing front stairs. repair in kind, less than 50%.Details
change tiles of street facing front stairs. repair in kind, less than 50%. | $10,000 |
| Aug 20, 2024 | Completed final sign-off Dec 2024 | 675 Pacheco St | Edri Construction Inc *See Notes* | kitchen remodel like for likeDetails
kitchen remodel like for like | $15,000 |
| Aug 9, 2024 | Completed final sign-off Feb 2025 | 1686 Great Hy | Edri Construction Inc *See Notes* | replace 3600 sq ft wood siding with cement/hardie board, like for like, on the back and right side only - street visible from right side.Details
replace 3600 sq ft wood siding with cement/hardie board, like for like, on the back and right side only - street visible from right side. | $15,000 |
| Jul 29, 2024 | Completed final sign-off Aug 2024 | 580 Ramsell St | Edri Construction Inc *See Notes* | revision to permit #: 2024-0626-5289. new construction window 20"x32" in same opening. tempered glazing required per cbc 2406.4.5. window is rear facing and more than 20' from propoerty line.Details
revision to permit #: 2024-0626-5289. new construction window 20"x32" in same opening. tempered glazing required per cbc 2406.4.5. window is rear facing and more than 20' from propoerty line. | $10,000 |
| Jul 26, 2024 | Completed final sign-off Oct 2024 | 2480 Fulton St | Edri Construction Inc *See Notes* | unit#1: kitchen remodel like for likeDetails
unit#1: kitchen remodel like for like | $20,000 |
| Jul 26, 2024 | Completed final sign-off May 2025 | 75 Meadowbrook Dr | Edri Construction Inc *See Notes* | remodel (e) kitchen, replace cabinets, sink, & counter. remove partial partition wall between kitchen & dining room. all work at 2/f.Details
remodel (e) kitchen, replace cabinets, sink, & counter. remove partial partition wall between kitchen & dining room. all work at 2/f. | $28,000 |
| Jul 17, 2024 | Completed final sign-off May 2025 | 2774 Union St | Edri Construction Inc *See Notes* | kitchen remodel like for like. bathroom remodel like for like. (2) window replacement like for like - not street visible.Details
kitchen remodel like for like. bathroom remodel like for like. (2) window replacement like for like - not street visible. | $90,000 |
| Jul 11, 2024 | Completed final sign-off Apr 2026 | 144 Beaumont Av | Edri Construction Inc *See Notes* | 1 kitchen remodel & 1 bathroom remodel,like for like, adding subpanel.Details
1 kitchen remodel & 1 bathroom remodel,like for like, adding subpanel. | $120,000 |
| Jun 27, 2024 | In progress issued Jun 2024 | 78 Mercedes Wy | Edri Construction Inc *See Notes* | bathroom remodel like for like. no removal of wallsDetails
bathroom remodel like for like. no removal of walls | $20,000 |
| Jun 27, 2024 | In progress issued Jun 2024 | 407 Vicente St | Edri Construction Inc *See Notes* | kitchen remodel like for like and install new sub panel 100amp. no removal of wallsDetails
kitchen remodel like for like and install new sub panel 100amp. no removal of walls | $30,000 |
| Jun 26, 2024 | Completed final sign-off Aug 2024 | 580 Ramsell St | Edri Construction Inc *See Notes* | bathroom remodel. toilet will switch places with standing shower. no other changes.Details
bathroom remodel. toilet will switch places with standing shower. no other changes. | $30,000 |
| Jun 26, 2024 | Completed final sign-off Dec 2024 | 3086 Market St | Edri Construction Inc *See Notes* | kitchen remodel like for like. adding subpanel.Details
kitchen remodel like for like. adding subpanel. | $60,000 |
| Jun 7, 2024 | Completed final sign-off Sep 2024 | 1736 Hayes St | Edri Construction Inc *See Notes* | remodel existing hall half bathroom into full bathroom. remodel existing 1/4 bathroom into new 1/2 bathroom.Details
remodel existing hall half bathroom into full bathroom. remodel existing 1/4 bathroom into new 1/2 bathroom. | $61,350 |
| Jun 7, 2024 | Completed final sign-off Aug 2024 | 2725 23rd St | Edri Construction Inc *See Notes* | remove and replace (in-kind) front stairs and landing in kind at (e) front entry due to dry rot. handrails and side walls below to remain tile floorDetails
remove and replace (in-kind) front stairs and landing in kind at (e) front entry due to dry rot. handrails and side walls below to remain tile floor | $15,000 |
| Jun 6, 2024 | Completed final sign-off Dec 2024 | 128 Ripley St | Edri Construction Inc *See Notes* | unit #1: one kitchen remodel like for like. installation of (9) recessed lights totalDetails
unit #1: one kitchen remodel like for like. installation of (9) recessed lights total | $50,000 |
| May 10, 2024 | Completed final sign-off Jun 2024 | 222 Winfield St | Edri Construction Inc *See Notes* | revisin to permit 202311281473. remove pouring of new foundation. existing foundations sufficient for the scope of work of the project. revised special inspection sheet to reflect this change.Details
revisin to permit 202311281473. remove pouring of new foundation. existing foundations sufficient for the scope of work of the project. revised special inspection sheet to reflect this change. | $2,000 |
| Apr 16, 2024 | In progress issued May 2024 | 820 Lawton St | Edri Construction Inc *See Notes* | siding replacement, roof replacement with 3 skylights. replace all doors like for like, windows like for like. rewire new sub panel on each level of home. install smoke alarms and carbon. new havac system.new mini split, kitchen remodel, new bath 1st fl. replace balconnies like for like. all bathDetails
siding replacement, roof replacement with 3 skylights. replace all doors like for like, windows like for like. rewire new sub panel on each level of home. install smoke alarms and carbon. new havac system.new mini split, kitchen remodel, new bath 1st fl. replace balconnies like for like. all bath | $200,000 |
| Apr 9, 2024 | Completed final sign-off Nov 2024 | 2534 Chestnut St | Edri Construction Inc *See Notes* | exploratory demo on 1st, 2nd & 3rd fl. demolition of kitchen, bathroom, powder room, laundry room and sheetrock. soft demolition only. no structural demolition under this permit. demolition of finishes in listed areas only.Details
exploratory demo on 1st, 2nd & 3rd fl. demolition of kitchen, bathroom, powder room, laundry room and sheetrock. soft demolition only. no structural demolition under this permit. demolition of finishes in listed areas only. | $100,000 |
| Apr 2, 2024 | Completed final sign-off Jun 2024 | 116 Park St | Edri Construction Inc *See Notes* | bathroom remodel like for like (1)Details
bathroom remodel like for like (1) | $30,000 |
| Mar 14, 2024 | Completed final sign-off May 2025 | 1417 Church St | Edri Construction Inc *See Notes* | 1300 sqft siding replacement like for like in the back of the house, replace a windows in the back like for like replace 3 doors in the back like for like. u-factor 0.30 maxDetails
1300 sqft siding replacement like for like in the back of the house, replace a windows in the back like for like replace 3 doors in the back like for like. u-factor 0.30 max | $20,000 |
| Mar 14, 2024 | Completed final sign-off Aug 2024 | 655 Corbett Av | Edri Construction Inc *See Notes* | convert closet to laundry roomDetails
convert closet to laundry room | $8,000 |
| Mar 5, 2024 | Completed final sign-off Nov 2024 | 2655 15th Av | Edri Construction Inc *See Notes* | revision to 202306291138. rebuild driveway at front yard. no work beyong the property lineDetails
revision to 202306291138. rebuild driveway at front yard. no work beyong the property line | $10,000 |
| Mar 5, 2024 | Completed final sign-off Aug 2024 | 419 Mangels Av | Edri Construction Inc *See Notes* | revision to 202402095650. existing 4x6 post above found at line 4 on the 2nd fl framing plan. e 6x14 beam at 2nd fl framing plan found to sh on a wall with existing beam below. no need for new concrete pad at line 4, existing pad is there.Details
revision to 202402095650. existing 4x6 post above found at line 4 on the 2nd fl framing plan. e 6x14 beam at 2nd fl framing plan found to sh on a wall with existing beam below. no need for new concrete pad at line 4, existing pad is there. | $1,000 |
| Feb 27, 2024 | Completed final sign-off Aug 2024 | 2725 23rd St | Edri Construction Inc *See Notes* | create new full bathroom and closet in (e) family room. create new storage room in garage.Details
create new full bathroom and closet in (e) family room. create new storage room in garage. | $50,000 |
| Feb 12, 2024 | Completed final sign-off Aug 2024 | 655 Corbett Av | Edri Construction Inc *See Notes* | kitchen remodel like for like. 450 sqft floors replacement. new sub panel 100 ampDetails
kitchen remodel like for like. 450 sqft floors replacement. new sub panel 100 amp | $30,000 |
| Feb 9, 2024 | Completed final sign-off Aug 2024 | 419 Mangels Av | Edri Construction Inc *See Notes* | extg bathroom remodel like for like on 1st floor. extg kitchen remodel on 2nd floor with structural changes with plans.Details
extg bathroom remodel like for like on 1st floor. extg kitchen remodel on 2nd floor with structural changes with plans. | $50,000 |
| Feb 7, 2024 | Completed final sign-off Sep 2025 | 707 Cortland Av | Edri Construction Inc *See Notes* | to provide plans for all work described in nov# 202312732. to renovate an (e) commercial space. to upgrade the (e) front entry to accessible standard. change of use to trade office.Details
to provide plans for all work described in nov# 202312732. to renovate an (e) commercial space. to upgrade the (e) front entry to accessible standard. change of use to trade office. | $25,000 |
| Jan 23, 2024 | Completed final sign-off Jul 2024 | 15 Hollywood Ct | Edri Construction Inc *See Notes* | g/f: add a full bathroom. replace the gas furnace with an electric heat pump and indoor air handler.Details
g/f: add a full bathroom. replace the gas furnace with an electric heat pump and indoor air handler. | $15,000 |
| Jan 16, 2024 | Completed final sign-off May 2024 | 801 27th St | Edri Construction Inc *See Notes* | remodel 1 bathroom - like for like.Details
remodel 1 bathroom - like for like. | $30,000 |