Block 1168, lot 053
2480 Fulton St #1
- City’s use
- Single Family Residential
- Built
- 1925
- Stories
- 1
- Rooms
- 1 bedroom, 1 bathroom
- Building
- 729 sq ft
- Lot
- 3,438 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 27, 2026 | In progress issued Apr 2026 | 2480 Fulton St | Edri Construction Inc *See Notes* | unit#1: laundry room remodel - like for like, upgrade mep to code.Details
unit#1: laundry room remodel - like for like, upgrade mep to code. | $20,000 |
| Oct 23, 2025 | Completed final sign-off Feb 2026 | 2480 Fulton St | Jemico Llc Dba Renewal By Andersen Of Sf | apt 1: replacing (1) window non-street visible, (e) vinyl casement (n) wood composite double hung, u-factor <.30, no size change, window will be in the same opening, same locationDetails
apt 1: replacing (1) window non-street visible, (e) vinyl casement (n) wood composite double hung, u-factor <.30, no size change, window will be in the same opening, same location | $1,115 |
| Jul 26, 2024 | Completed final sign-off Oct 2024 | 2480 Fulton St | Edri Construction Inc *See Notes* | unit#1: kitchen remodel like for likeDetails
unit#1: kitchen remodel like for like | $20,000 |
| Apr 3, 2017 | Completed final sign-off Apr 2017 | 2480 Fulton St | Bayside Roofing Company | re-roofingDetails
re-roofing | $14,000 |
| Feb 3, 2017 | Completed final sign-off Mar 2017 | 2480 Fulton St | Michael Mc Nulty Construction***Ask Id | common area: revision to 201701177211: replace e deteriorated rear stairs in kind.Details
common area: revision to 201701177211: replace e deteriorated rear stairs in kind. | $5,000 |
| Jan 17, 2017 | Completed final sign-off Mar 2017 | 2480 Fulton St | Michael Mc Nulty Construction***Ask Id | dry rot repair of rear wooden stairs, 35% replacementDetails
dry rot repair of rear wooden stairs, 35% replacement | $7,500 |
| Jun 27, 2016 | Completed final sign-off Jul 2016 | 2480 Fulton St | Michael Mc Nulty Construction***Ask Id | remove and replace 25% of dry rotrear middle stair stringer, treads abd r1sersDetails
remove and replace 25% of dry rotrear middle stair stringer, treads abd r1sers | $9,500 |
| Dec 5, 2008 | Never finaled issued Dec 2008, no final | 2480 Fulton St | A Atlantiac Plastering Inc | repair crack to stucco on street side of building. approx 800 sq. ft. and re-seal.Details
repair crack to stucco on street side of building. approx 800 sq. ft. and re-seal. | $8,000 |
| Nov 21, 2008 | Never finaled issued Nov 2008, no final | 2480 Fulton St | American Home Renewal Inc | work @ unit# 1 only. replace 4 windows into existing openings. visable from the street. no structural changes. u factor 0.67 max. from aluminum to wood clad windows.Details
work @ unit# 1 only. replace 4 windows into existing openings. visable from the street. no structural changes. u factor 0.67 max. from aluminum to wood clad windows. | $4,700 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Michael Mc Nulty Construction***Ask Id (3), Edri Construction Inc *See Notes* (2), A Atlantiac Plastering Inc, American Home Renewal Inc, Bayside Roofing Company, Jemico Llc Dba Renewal By Andersen Of Sf
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.