336 permits since 2000 (contractor on 336 permits, authorized agent-others on 2 permits): 256 completed, 5 in progress, 64 never finaled, 11 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 336.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 24, 2026 | In progress issued Sep 2026 | 259 Post St | Schmitt Heating Co Inc | installation of heat pump, refrigerant piping, fan coil unit, and ducting serving 2nd fl break room.Details
installation of heat pump, refrigerant piping, fan coil unit, and ducting serving 2nd fl break room. | $30,000 |
| Jul 9, 2026 | Completed final sign-off Aug 2026 | 350 Brannan St | Schmitt Heating Co Inc | 2nd flr. replace existing heat pump with new. install 1-5 ton ducted heat pump and 1 -3 on 1 ductless split heat pump system. install new ducting. condensate drain to in let.Details
2nd flr. replace existing heat pump with new. install 1-5 ton ducted heat pump and 1 -3 on 1 ductless split heat pump system. install new ducting. condensate drain to in let. | $60,000 |
| May 7, 2026 | In progress issued May 2026 | 2180 Folsom St | State Sheet Metal Works Inc., Schmitt Heating Co Inc | to comply with nov 202315320 to include mechanical equipment replacement due to fire damageDetails
to comply with nov 202315320 to include mechanical equipment replacement due to fire damage | $40,000 |
| Dec 31, 2025 | Completed final sign-off Mar 2026 | 1839 Divisadero St | Schmitt Heating Co Inc | install 1 new filtered fresh air-makeup air fan & ducting to main retail spaceDetails
install 1 new filtered fresh air-makeup air fan & ducting to main retail space | $3,480 |
| Mar 4, 2025 | Completed final sign-off Apr 2025 | 50 Quint St | Schmitt Heating Co Inc | base building improvements to (e) warehouse. provide new split system heat pump for heating and cooling serving offices and restroom spaces only. provide new restroom exhaust.Details
base building improvements to (e) warehouse. provide new split system heat pump for heating and cooling serving offices and restroom spaces only. provide new restroom exhaust. | |
| Dec 5, 2024 | Completed final sign-off Jan 2025 | 1280 Lombard St | Schmitt Heating Co Inc | to comply with compliant #202428183 provide and install dryer booster fan. provide and install secondary lint trap & vent dryer to the back of the building.Details
to comply with compliant #202428183 provide and install dryer booster fan. provide and install secondary lint trap & vent dryer to the back of the building. | $4,100 |
| Jul 24, 2024 | Completed final sign-off Aug 2024 | 66 Yerba Buena Av | Schmitt Heating Co Inc | replace ductwork (less than 25 ft) for hvac systems (attic and crawlspace).Details
replace ductwork (less than 25 ft) for hvac systems (attic and crawlspace). | $18,000 |
| Jun 13, 2024 | In progress issued Jun 2024 | 4265 24th St | Schmitt Heating Co Inc | replace existing ductwork in garage with new steel ductwork. and ductwork in attic with new flexible ducts.Details
replace existing ductwork in garage with new steel ductwork. and ductwork in attic with new flexible ducts. | $29,000 |
| Jun 13, 2024 | In progress issued Jun 2024 | 493 Diamond St | Schmitt Heating Co Inc | replace existing ductwork in attic with new less than 20 ft and install 2 new registers on 1st floorDetails
replace existing ductwork in attic with new less than 20 ft and install 2 new registers on 1st floor | $26,000 |
| May 21, 2024 | Completed final sign-off Feb 2025 | 550 03rd St | Schmitt Heating Co Inc | replace extg roof mount package units and ducting wit 4 new roof mount heat pumps, ducting and 1-4 zone ductless heat pump. ref pa 2023-0206-1449Details
replace extg roof mount package units and ducting wit 4 new roof mount heat pumps, ducting and 1-4 zone ductless heat pump. ref pa 2023-0206-1449 | $100,000 |
| May 20, 2024 | In progress filed May 2024, not yet issued | 1264 Folsom St | Schmitt Heating Co Inc | replace (e) heating/cooling units with 2 new roof mount package units and new ducting, condensate drains and thermostatDetails
replace (e) heating/cooling units with 2 new roof mount package units and new ducting, condensate drains and thermostat | $60,000 |
| Mar 18, 2024 | Completed final sign-off Jun 2024 | 1278 Minnesota St | Schmitt Heating Co Inc | replace existing heating sytem with new gas forced furnace and new ductwork, flue and combustion air. condensate and power by plumber and electrician. ref ti permit 202309297767Details
replace existing heating sytem with new gas forced furnace and new ductwork, flue and combustion air. condensate and power by plumber and electrician. ref ti permit 202309297767 | $44,000 |
| Nov 30, 2023 | Completed final sign-off Dec 2023 | 453 Colon Av | Schmitt Heating Co Inc | replace ductwork in attic to accomodate new remodel (less than 25 ft)Details
replace ductwork in attic to accomodate new remodel (less than 25 ft) | $17,000 |
| Nov 15, 2023 | Completed final sign-off Nov 2023 | 811 36th Av | Schmitt Heating Co Inc | replace existing central ducted furance with ame location new. connect to existing ductwork and supply outlets. less than 25' of (n) ductwork.Details
replace existing central ducted furance with ame location new. connect to existing ductwork and supply outlets. less than 25' of (n) ductwork. | $12,840 |
| Aug 4, 2023 | Never finaled filed Aug 2023, never issued | 2985 24th Av | Schmitt Heating Co Inc | replace (e) forced air systems with 2 mini split heat pump systems. replace 20 feet of ductwork per system install 2 condensate drainsDetails
replace (e) forced air systems with 2 mini split heat pump systems. replace 20 feet of ductwork per system install 2 condensate drains | $24,000 |
| Jul 13, 2023 | Never finaled issued Jul 2023, no final | 2526 27th Av | Schmitt Heating Co Inc | install ductwork in soffit and garage and connect to existing furnace. 26 gauge duct in garage. less than 25' of new ductworkDetails
install ductwork in soffit and garage and connect to existing furnace. 26 gauge duct in garage. less than 25' of new ductwork | $7,500 |
| Jul 13, 2023 | Completed final sign-off Aug 2023 | 1330 04th Av | Schmitt Heating Co Inc | repalcement of (e) fau with a (n) mxz svz ducted air handler(connect to (e) ducts) for 1st and 2nd floor and a mini split cassett air handler on 3rd floor. install 26-gauge ductwork in garage, less than 25'. condenser on roof, min. 10' from roof edgeDetails
repalcement of (e) fau with a (n) mxz svz ducted air handler(connect to (e) ducts) for 1st and 2nd floor and a mini split cassett air handler on 3rd floor. install 26-gauge ductwork in garage, less than 25'. condenser on roof, min. 10' from roof edge | $14,000 |
| Jul 13, 2023 | Completed final sign-off Sep 2023 | 471 Noe St | Schmitt Heating Co Inc | 473 noe attic: install 20 feet of flexible ductwork in attic and replace existing fau unitDetails
473 noe attic: install 20 feet of flexible ductwork in attic and replace existing fau unit | $9,000 |
| May 25, 2023 | Completed final sign-off Oct 2024 | 28 Ashbury St | Schmitt Heating Co Inc | replace existing ductwork in attic with all new flexible ducts (ul181 listed), less than 25 ft of new ductwork.Details
replace existing ductwork in attic with all new flexible ducts (ul181 listed), less than 25 ft of new ductwork. | $11,720 |
| May 1, 2023 | Completed final sign-off May 2023 | 2990 Clay St | Schmitt Heating Co Inc | unit# 2: replace 10 feet of steel ductwork with 10 feet of new ductwork in common mechanical room in garage (furnace replacement under separate permit)Details
unit# 2: replace 10 feet of steel ductwork with 10 feet of new ductwork in common mechanical room in garage (furnace replacement under separate permit) | $6,820 |
| May 1, 2023 | Completed final sign-off May 2023 | 2990 Clay St | Schmitt Heating Co Inc | unit#4: replace 10 feet of steel ductwork with 10 feet of new ductwork in common mechanical room in garage (furnace replacement under separate permit)Details
unit#4: replace 10 feet of steel ductwork with 10 feet of new ductwork in common mechanical room in garage (furnace replacement under separate permit) | $6,820 |
| May 1, 2023 | Completed final sign-off May 2023 | 2990 Clay St | Schmitt Heating Co Inc | unit# 3:replace 10 feet of steel ductwork with 10 feet of new ductwork in common mechanical room in garage (furnace replacement under separate permit).Details
unit# 3:replace 10 feet of steel ductwork with 10 feet of new ductwork in common mechanical room in garage (furnace replacement under separate permit). | $7,710 |
| Nov 9, 2022 | Completed final sign-off Dec 2022 | 221 04th St | Schmitt Heating Co Inc | install new supply and return air ducting per plans. relocate existing themostats, existing vav's to remain in use. reference building bpa# 2022-0815-0511.Details
install new supply and return air ducting per plans. relocate existing themostats, existing vav's to remain in use. reference building bpa# 2022-0815-0511. | $10,000 |
| Aug 30, 2022 | Completed final sign-off Sep 2022 | 1406 Sanchez St | Schmitt Heating Co Inc | replace existing smoke damaged ductwork with new in crawlspace. <40' of new ductworkDetails
replace existing smoke damaged ductwork with new in crawlspace. <40' of new ductwork | $1,500 |
| Oct 22, 2021 | Completed final sign-off Dec 2021 | 224 Townsend St | Schmitt Heating Co Inc | administrative to change construction value per inspector for pa# 202108096068. for hvac unit. certificate of occupancy.Details
administrative to change construction value per inspector for pa# 202108096068. for hvac unit. certificate of occupancy. | $160,000 |
| Aug 9, 2021 | Completed final sign-off Dec 2021 | 224 Townsend St | Schmitt Heating Co Inc | as built permit for hvac unit for final certificate of occupancy reference permit 2018-1227-9219Details
as built permit for hvac unit for final certificate of occupancy reference permit 2018-1227-9219 | |
| Jun 21, 2021 | Completed final sign-off May 2022 | 45 Almaden Ct | Schmitt Heating Co Inc | replace (e) supplier ductwork in garage with all new 26-gauge steel ductwork.Details
replace (e) supplier ductwork in garage with all new 26-gauge steel ductwork. | $5,200 |
| Apr 23, 2021 | Completed final sign-off Sep 2021 | 1018 Valencia St | Schmitt Heating Co Inc | new mechanical system in vacant ground floor commercial tenant space for future tenant.Details
new mechanical system in vacant ground floor commercial tenant space for future tenant. | $30,000 |
| Mar 9, 2021 | Completed final sign-off Aug 2021 | 461 Urbano Dr | Schmitt Heating Co Inc | to obtain final inspection for work approved under permit application# 201507242341. all work is completed.Details
to obtain final inspection for work approved under permit application# 201507242341. all work is completed. | |
| Mar 4, 2021 | Completed final sign-off Aug 2021 | 1256 Market St | Schmitt Heating Co Inc | to obtain final inspectionfor work under approved under permit application #. all work is complete.Details
to obtain final inspectionfor work under approved under permit application #. all work is complete. | $24,000 |
| Jan 7, 2021 | Never finaled issued Feb 2021, no final | 251 Post St | Schmitt Heating Co Inc | relocate (1) (e) fan coil & reconnect to (e) ductwork & refrigerant lines. replace grills & ducting connections at 11 outlets.Details
relocate (1) (e) fan coil & reconnect to (e) ductwork & refrigerant lines. replace grills & ducting connections at 11 outlets. | $29,600 |
| Sep 29, 2020 | Completed final sign-off Feb 2021 | 454 Utah St | Schmitt Heating Co Inc | replace existing ducwork in attick from new heat pump systemDetails
replace existing ducwork in attick from new heat pump system | $20,000 |
| Sep 29, 2020 | Completed final sign-off Nov 2020 | 347 Grant Av | Schmitt Heating Co Inc | add 3 supply registers in conjuction with pa202001313307 per bid kg.Details
add 3 supply registers in conjuction with pa202001313307 per bid kg. | $1,500 |
| Jun 16, 2020 | Completed final sign-off Feb 2021 | 36 Kronquist Ct | Schmitt Heating Co Inc | replace existing ductwork and soffits with new steel ductwork and flexible soffits in garage.Details
replace existing ductwork and soffits with new steel ductwork and flexible soffits in garage. | $9,000 |
| Jun 11, 2020 | Completed final sign-off Jan 2021 | 969 Folsom St | Schmitt Heating Co Inc | deferred mechanical for pa# 201912169645. install new vrf condensing unit on roof & 7 fancoils with related ductwork. install restrooms & storage &workshop ventilation & install outside air fan with ductwork.Details
deferred mechanical for pa# 201912169645. install new vrf condensing unit on roof & 7 fancoils with related ductwork. install restrooms & storage &workshop ventilation & install outside air fan with ductwork. | $125,000 |
| Jan 23, 2020 | Completed final sign-off Feb 2020 | 80 San Fernando Wy | Schmitt Heating Co Inc | install new flexible ductwork in attic and crawl space. to replace existing ductingDetails
install new flexible ductwork in attic and crawl space. to replace existing ducting | $27,000 |
| Jan 6, 2020 | Completed final sign-off Jan 2020 | 1387 Waller St | Schmitt Heating Co Inc | replace e ductwork in garage w/ new 26 gauge ductwork in conjuction w/ replacement of e furnace in same locationDetails
replace e ductwork in garage w/ new 26 gauge ductwork in conjuction w/ replacement of e furnace in same location | $8,955 |
| Dec 4, 2019 | Never finaled issued Feb 2020, no final | 28 02nd St | Schmitt Heating Co Inc | this permit is for mechanical only. demo (e) vav ac system serving 2nd through 7th floor. provide (n) vrf ac system for 2nd through 7th fl. ref pa 2018-0907-9479Details
this permit is for mechanical only. demo (e) vav ac system serving 2nd through 7th floor. provide (n) vrf ac system for 2nd through 7th fl. ref pa 2018-0907-9479 | $150,000 |
| Nov 13, 2019 | Completed final sign-off Nov 2019 | 19 Congo St | Schmitt Heating Co Inc | replace existing flexible ductwork woth new 26-guage steel ductwork in garage in conjunction with replacement of furnace in same locationDetails
replace existing flexible ductwork woth new 26-guage steel ductwork in garage in conjunction with replacement of furnace in same location | $8,520 |
| Oct 31, 2019 | Completed final sign-off Nov 2019 | 2581 Post St | Schmitt Heating Co Inc | unit #4; replace existing ductwork with new 26 gauge steel ductwork in attic. no relocation of equipment. all work in kind.Details
unit #4; replace existing ductwork with new 26 gauge steel ductwork in attic. no relocation of equipment. all work in kind. | $5,830 |
| Oct 23, 2019 | Completed final sign-off Oct 2021 | 229 Ellis St | Schmitt Heating Co Inc | mechanical only: replace (e) ventilation install all new bath exhausts, kitchen exhausts, corridor ventilation, laundry ventilation, new heating & cooling systems for top floor residential units. ref pa# 2018-0427-7608Details
mechanical only: replace (e) ventilation install all new bath exhausts, kitchen exhausts, corridor ventilation, laundry ventilation, new heating & cooling systems for top floor residential units. ref pa# 2018-0427-7608 | $160,000 |
| Oct 22, 2019 | Never finaled issued Oct 2019, no final | 625 Market St | Schmitt Heating Co Inc | extend supply air duct work into new private offices. install new transfer grills into private officeDetails
extend supply air duct work into new private offices. install new transfer grills into private office | $16,000 |
| Oct 22, 2019 | Expired or cancelled withdrawn Jan 2022 | 33 Bartlett St | Schmitt Heating Co Inc | replace e heathing and cooling with 5 n ew heating cooling systems. install new ductwork ref 201809200966Details
replace e heathing and cooling with 5 n ew heating cooling systems. install new ductwork ref 201809200966 | $60,000 |
| Oct 11, 2019 | Completed final sign-off Oct 2019 | 125 Pinehurst Wy | Schmitt Heating Co Inc | replace existing exposed, supply and return air ductwork with all new 26 - gauge steel duct, fully insulated.Details
replace existing exposed, supply and return air ductwork with all new 26 - gauge steel duct, fully insulated. | $2,500 |
| Jul 18, 2019 | Never finaled issued Jul 2019, no final | 863 Elizabeth St | Schmitt Heating Co Inc | replace existing ductwork in garage with new steel ductwork. 26 gauge ductwork less than40' of (n) duct.Details
replace existing ductwork in garage with new steel ductwork. 26 gauge ductwork less than40' of (n) duct. | $6,500 |
| Jul 10, 2019 | Never finaled issued Jul 2019, no final | 1365 04th St | Schmitt Heating Co Inc | install new 4 ton capacity heat pump system. install new ducting, connect to (e) outside air duct & refrigerant lines. maher naDetails
install new 4 ton capacity heat pump system. install new ducting, connect to (e) outside air duct & refrigerant lines. maher na | $20,000 |
| Jul 9, 2019 | Completed final sign-off Jul 2019 | 2006 Lyon St | Schmitt Heating Co Inc | replace (e) ductwork in garage with new 26-gauge steel ductworkDetails
replace (e) ductwork in garage with new 26-gauge steel ductwork | $6,345 |
| Jul 9, 2019 | Completed final sign-off Aug 2019 | 31 Camp St | Schmitt Heating Co Inc | replace flexible ductwork in garage with new steel ductwork per physical inspection report #cc-8354Details
replace flexible ductwork in garage with new steel ductwork per physical inspection report #cc-8354 | $2,530 |
| Jul 3, 2019 | Completed final sign-off Oct 2019 | 47 Gaviota Wy | Schmitt Heating Co Inc | install all new steel ductwork in garage and flexible ductwork in drop ceilingsDetails
install all new steel ductwork in garage and flexible ductwork in drop ceilings | $6,805 |
| Jun 6, 2019 | Completed final sign-off Nov 2019 | 12 Prospect Av | Schmitt Heating Co Inc | replace (e) ductwork in attic and soffits with new in same locations inconjuction with pa201904188356.Details
replace (e) ductwork in attic and soffits with new in same locations inconjuction with pa201904188356. | $5,000 |
| May 22, 2019 | Completed final sign-off May 2019 | 472 Euclid Av | Schmitt Heating Co Inc | replace existing flexible duct work in garage with steel ducts to comply with physical inspection #cc-8344. item #1 26 gauge metal duct work.Details
replace existing flexible duct work in garage with steel ducts to comply with physical inspection #cc-8344. item #1 26 gauge metal duct work. | $3,175 |
| May 22, 2019 | Completed final sign-off Jul 2019 | 721 Brannan St | Schmitt Heating Co Inc | replace e hvac units all new. install 4 mitsubishi heat pump systems, 1 roof mount package unit, 2 split system air conditioners, makeup air, duct per plansDetails
replace e hvac units all new. install 4 mitsubishi heat pump systems, 1 roof mount package unit, 2 split system air conditioners, makeup air, duct per plans | $110,000 |
| May 8, 2019 | Expired or cancelled withdrawn Jun 2021 | 224 Townsend St | Schmitt Heating Co Inc | replace extg hvac with all new. install 1-vrv reconfigurant heat pump serving multiple fan coils, 4 roof mount packing units make up air, exhaust air and ducting. ref 201805310575(r1). n/a for maherDetails
replace extg hvac with all new. install 1-vrv reconfigurant heat pump serving multiple fan coils, 4 roof mount packing units make up air, exhaust air and ducting. ref 201805310575(r1). n/a for maher | $160,000 |
| May 7, 2019 | Completed final sign-off Jul 2019 | 523 Greenwich St | Schmitt Heating Co Inc | replace ductwork in attic w/new steel ductwork, less than 40 feet.Details
replace ductwork in attic w/new steel ductwork, less than 40 feet. | $6,200 |
| May 7, 2019 | Completed final sign-off Jul 2019 | 517 Greenwich St | Schmitt Heating Co Inc | replace ductwork in attic w/new steel ductwork, less than 40 feet.Details
replace ductwork in attic w/new steel ductwork, less than 40 feet. | $6,200 |
| May 7, 2019 | Completed final sign-off Jul 2019 | 521 Greenwich St | Schmitt Heating Co Inc | replace ductwork in attic w/new steel ductwork, less than 40 feet.Details
replace ductwork in attic w/new steel ductwork, less than 40 feet. | $6,200 |
| Mar 28, 2019 | Completed final sign-off Apr 2019 | 1362 Sacramento St | Schmitt Heating Co Inc | replace existing ductwork in attic with new flexible ductwork (less than 40 feet).Details
replace existing ductwork in attic with new flexible ductwork (less than 40 feet). | $13,500 |
| Mar 26, 2019 | Completed final sign-off Apr 2019 | 2258 29th Av | Schmitt Heating Co Inc | replace existing ductwork in garage with new steel ductwork (less than 40 feet).Details
replace existing ductwork in garage with new steel ductwork (less than 40 feet). | $7,500 |
| Mar 15, 2019 | Completed final sign-off Apr 2019 | 44 Crestline Dr | Schmitt Heating Co Inc | replace/install all new 26-gauge steel ductwork in two separate garages that serves unit 9,10,11& 12.Details
replace/install all new 26-gauge steel ductwork in two separate garages that serves unit 9,10,11& 12. | $15,000 |
| Feb 14, 2019 | Never finaled issued Feb 2019, no final | 174 Staples Av | Schmitt Heating Co Inc | replace (e) flexible ductwork in soffits.Details
replace (e) flexible ductwork in soffits. | $5,890 |
| Jan 14, 2019 | Completed final sign-off Sep 2019 | 64 Surrey St | Schmitt Heating Co Inc | replace existing ductwork with new flexible ductwork in crawl space and soffitsDetails
replace existing ductwork with new flexible ductwork in crawl space and soffits | $11,710 |
| Jan 14, 2019 | Completed final sign-off May 2019 | 1235 Florida St | Schmitt Heating Co Inc | replace existing ductwork in attic with new flexible ductworkDetails
replace existing ductwork in attic with new flexible ductwork | $10,371 |
| Jan 10, 2019 | Never finaled issued Jan 2019, no final | 604 Mission St | Schmitt Heating Co Inc | replace extg heating/cooling system with new 4-zone split system. install new condensate drains to extg drain.Details
replace extg heating/cooling system with new 4-zone split system. install new condensate drains to extg drain. | $25,000 |
| Jan 9, 2019 | Never finaled issued Jan 2019, no final | 811 30th Av | Schmitt Heating Co Inc | replace (e) ductwork with new steel ductwork in garage.Details
replace (e) ductwork with new steel ductwork in garage. | $15,943 |
| Nov 6, 2018 | Never finaled issued Nov 2018, no final | 2161 Irving St | Schmitt Heating Co Inc | replace & reconfigure (e) duct work with new exposed 26 gauge steel ductwork in offices and front lobby.Details
replace & reconfigure (e) duct work with new exposed 26 gauge steel ductwork in offices and front lobby. | $18,000 |
| Nov 6, 2018 | Completed final sign-off Nov 2018 | 1274 Filbert St | Schmitt Heating Co Inc | replace (e) ductwork with all new flexible ductwork in attic.Details
replace (e) ductwork with all new flexible ductwork in attic. | $10,000 |
| Oct 25, 2018 | Never finaled issued Oct 2018, no final | 1550 Ulloa St | Schmitt Heating Co Inc | replace existing ductwork in garage with new steel ductwork (26 gauge) in conjunction with replacement of forced air furnace.Details
replace existing ductwork in garage with new steel ductwork (26 gauge) in conjunction with replacement of forced air furnace. | $7,550 |
| Oct 25, 2018 | Completed final sign-off Sep 2019 | 2424 Buchanan St | Schmitt Heating Co Inc | replace existing ductwork with new flexible ductwork in attic, soffits and dropped ceilings and new 26 gauge steel ducts in garage.Details
replace existing ductwork with new flexible ductwork in attic, soffits and dropped ceilings and new 26 gauge steel ducts in garage. | $12,520 |
| Oct 25, 2018 | Completed final sign-off Jun 2019 | 428 Gold Mine Dr | Schmitt Heating Co Inc | install all new ductwork in ceiling of crawl space, ceilings + soffits in conjunction with install of new furnace (pmw20181023459)Details
install all new ductwork in ceiling of crawl space, ceilings + soffits in conjunction with install of new furnace (pmw20181023459) | $5,225 |
| Oct 25, 2018 | Completed final sign-off Jan 2019 | 446 Page St | Schmitt Heating Co Inc | install new flexible ductwork in soffits in conjunction with furnace installation in mechanical closet.Details
install new flexible ductwork in soffits in conjunction with furnace installation in mechanical closet. | $8,645 |
| Oct 18, 2018 | Completed final sign-off Sep 2019 | 1127 Wisconsin St | Schmitt Heating Co Inc | replace existing furnace ductwork with new flexible ductwork in soffits + crawl space in conjunction with replacement of 2 existing furnaces with new.Details
replace existing furnace ductwork with new flexible ductwork in soffits + crawl space in conjunction with replacement of 2 existing furnaces with new. | $18,000 |
| Oct 18, 2018 | Completed final sign-off Dec 2018 | 148 Pixley St | Schmitt Heating Co Inc | replace existing ductwork in attic with new flexible ductwork.Details
replace existing ductwork in attic with new flexible ductwork. | $12,475 |
| Oct 2, 2018 | Completed final sign-off Oct 2018 | 46 Marcela Av | Schmitt Heating Co Inc | replace existing asbestos-covered ductwork in garage with new 26-gauge stell ductwork. (asbestos abatement by others).Details
replace existing asbestos-covered ductwork in garage with new 26-gauge stell ductwork. (asbestos abatement by others). | $6,580 |
| Sep 21, 2018 | Completed final sign-off Jul 2020 | 3061 Laguna St | Schmitt Heating Co Inc | re: pa# 201808066478. change address from 3063 laguna st to 3061 laguna st.Details
re: pa# 201808066478. change address from 3063 laguna st to 3061 laguna st. | |
| Sep 11, 2018 | Completed final sign-off Apr 2019 | 1721 Newcomb Av | Schmitt Heating Co Inc | replace ductwork with new steel duct in garage and flexible duct in attic.Details
replace ductwork with new steel duct in garage and flexible duct in attic. | $9,480 |
| Aug 31, 2018 | Completed final sign-off Oct 2018 | 246 Jersey St | Schmitt Heating Co Inc | replace (e) ductwork w/ new 26 gauge steel ductwork in garage.Details
replace (e) ductwork w/ new 26 gauge steel ductwork in garage. | $8,510 |
| Aug 31, 2018 | Completed final sign-off Sep 2018 | 55 Arago St | Schmitt Heating Co Inc | replace (e) ducts w/ new 26 gauge steel ductwork in garage.Details
replace (e) ducts w/ new 26 gauge steel ductwork in garage. | $6,810 |
| Aug 31, 2018 | Completed final sign-off Nov 2018 | 25 Taylor St | Schmitt Heating Co Inc | to obtain final inspection for work approved under pa#2013-1230-5225. all work is complete.Details
to obtain final inspection for work approved under pa#2013-1230-5225. all work is complete. | |
| Aug 10, 2018 | Completed final sign-off Sep 2018 | 900 Kearny St | Schmitt Heating Co Inc | replace existing ductwork and condensate drain lines on 4-existing heat pumps. same location, same typeDetails
replace existing ductwork and condensate drain lines on 4-existing heat pumps. same location, same type | $15,000 |
| Aug 6, 2018 | Expired or cancelled expired Sep 2022 | 3063 Laguna St | Schmitt Heating Co Inc | replace existing ductwork with new flexible ductwork in atticDetails
replace existing ductwork with new flexible ductwork in attic | $11,250 |
| Jul 6, 2018 | Completed final sign-off Oct 2019 | 250 King St | Schmitt Heating Co Inc | unit 952: install 4 wall mount varible flow "nfr" cooling systems in (e) condo #952. patch interior finishes. no exterior workDetails
unit 952: install 4 wall mount varible flow "nfr" cooling systems in (e) condo #952. patch interior finishes. no exterior work | $25,000 |
| Jun 20, 2018 | Completed final sign-off Aug 2021 | 1256 Market St | Schmitt Heating Co Inc | install new ductwork distribution from (e) roof mounted heating & air conditioning systems. rev #201806202365Details
install new ductwork distribution from (e) roof mounted heating & air conditioning systems. rev #201806202365 | $24,000 |
| May 14, 2018 | Completed final sign-off Apr 2019 | 421 Bryant St | Schmitt Heating Co Inc | replace 2 existing split system heat/cooling units. connect to existing drains & ppowerDetails
replace 2 existing split system heat/cooling units. connect to existing drains & ppower | $15,000 |
| May 14, 2018 | Completed final sign-off Sep 2018 | 431 Bryant St | Schmitt Heating Co Inc | replace 1 existing roof mount package unit 1 - split system heat pump. connect to existing gas, power & drainDetails
replace 1 existing roof mount package unit 1 - split system heat pump. connect to existing gas, power & drain | $16,000 |
| Apr 23, 2018 | Completed final sign-off Sep 2018 | 75 14th St | Schmitt Heating Co Inc | replace (e) rooftop package units, install bath fans in new bathroomsDetails
replace (e) rooftop package units, install bath fans in new bathrooms | $60,000 |
| Feb 26, 2018 | Completed final sign-off Mar 2018 | 950 Lake St | Schmitt Heating Co Inc | replace existing ductwork with new flexible ductwork in crawl spaceDetails
replace existing ductwork with new flexible ductwork in crawl space | $8,210 |
| Feb 26, 2018 | Completed final sign-off Mar 2018 | 265 Castenada Av | Schmitt Heating Co Inc | replace existing flexible ductwork in attic with new and install (2) new return air ducts. maher n/aDetails
replace existing flexible ductwork in attic with new and install (2) new return air ducts. maher n/a | $14,000 |
| Dec 14, 2017 | Completed final sign-off Aug 2018 | 1075 Front St | Schmitt Heating Co Inc | replace 5 (e) water service heat pumps connected to (e) building chill water due to fire smoke damage. repalce (e) ductwork due to fire, smoke & water damage in connection w/pa# 201710262303 maher naDetails
replace 5 (e) water service heat pumps connected to (e) building chill water due to fire smoke damage. repalce (e) ductwork due to fire, smoke & water damage in connection w/pa# 201710262303 maher na | $42,000 |
| Nov 16, 2017 | Completed final sign-off Mar 2018 | 130 Northwood Dr | Schmitt Heating Co Inc | replace (e) ductwork in crawl space and garge with new steel ductwork.Details
replace (e) ductwork in crawl space and garge with new steel ductwork. | $9,930 |
| Nov 16, 2017 | Completed final sign-off Mar 2018 | 1 Coso Av | Schmitt Heating Co Inc | replace existing ductwork in attic with new r-6 flexible ductwork.Details
replace existing ductwork in attic with new r-6 flexible ductwork. | $7,400 |
| Nov 10, 2017 | Completed final sign-off Nov 2017 | 351 Santa Ana Av | Schmitt Heating Co Inc | replace existing duct work in garage at crawl space with new 26 gauge steel ducts in same location, to be connected to (e) furnace, less than 40 feet. n/a ordinance #155-13Details
replace existing duct work in garage at crawl space with new 26 gauge steel ducts in same location, to be connected to (e) furnace, less than 40 feet. n/a ordinance #155-13 | $5,800 |
| Oct 31, 2017 | Never finaled issued Oct 2017, no final | 16 Entrada Ct | Schmitt Heating Co Inc | replace (e) ductwork with all new 26 ga. steel ductwork in garage.Details
replace (e) ductwork with all new 26 ga. steel ductwork in garage. | $10,050 |
| Oct 31, 2017 | Completed final sign-off Jan 2018 | 132 Mallorca Wy | Schmitt Heating Co Inc | replace (e) ductwork with all new 26 ga. steel ductwork.Details
replace (e) ductwork with all new 26 ga. steel ductwork. | $10,020 |
| Oct 27, 2017 | Completed final sign-off Mar 2018 | 2456 Filbert St | Schmitt Heating Co Inc | install 1 new daikin 3 ton capacity 20n1 split ducted system. n/a for maher.Details
install 1 new daikin 3 ton capacity 20n1 split ducted system. n/a for maher. | $21,860 |
| Oct 27, 2017 | Never finaled issued Oct 2017, no final | 1031 Balboa St | Schmitt Heating Co Inc | install all new ductwork in attic and new 26 gauge steel ductwork in garage to replace (e) ducting.Details
install all new ductwork in attic and new 26 gauge steel ductwork in garage to replace (e) ducting. | $15,000 |
| Sep 22, 2017 | Completed final sign-off Sep 2017 | 733 Joost Av | Schmitt Heating Co Inc | replace existing ductwork in garage with all new 26 gauge steel ductworkDetails
replace existing ductwork in garage with all new 26 gauge steel ductwork | $6,500 |
| Sep 13, 2017 | Never finaled issued Sep 2017, no final | 80 Carolina St | Schmitt Heating Co Inc | demo (e) ductwork in 1/f conference room, demo (e) ductwork on 2/f back to rtu plenmus, install 3 new heat pump units on roof & 4 new fan coil units in remodeled spaces, new exhaust ventilation in restroom & breakroom, supply ductwork from (e) rtu's. n/a ordinance #155-13Details
demo (e) ductwork in 1/f conference room, demo (e) ductwork on 2/f back to rtu plenmus, install 3 new heat pump units on roof & 4 new fan coil units in remodeled spaces, new exhaust ventilation in restroom & breakroom, supply ductwork from (e) rtu's. n/a ordinance #155-13 | $48,800 |
| Aug 21, 2017 | Never finaled issued Aug 2017, no final | 300 Connecticut St | Schmitt Heating Co Inc | replace existing type 2 exhaust hoods and 1 exhaust fan, 1 makeup system with new. fire (if required-fire alarm, sprinklers, ul300) under separate permit(s)Details
replace existing type 2 exhaust hoods and 1 exhaust fan, 1 makeup system with new. fire (if required-fire alarm, sprinklers, ul300) under separate permit(s) | $20,000 |
| Aug 4, 2017 | Completed final sign-off Jun 2018 | 669 44th Av | Schmitt Heating Co Inc | replace existing ductwork in attic cavity above ceiling with new flexible ductwork. replace ductwork in garage with new 26 gauge steel ductwork.Details
replace existing ductwork in attic cavity above ceiling with new flexible ductwork. replace ductwork in garage with new 26 gauge steel ductwork. | $10,110 |
| Jul 18, 2017 | Completed final sign-off Dec 2017 | 1801 Scott St | Schmitt Heating Co Inc | install all new ductwork in ceiling and soffits from new fancoil to registers.Details
install all new ductwork in ceiling and soffits from new fancoil to registers. | $4,000 |