Block 0220, lot 021
1366 Sacramento St
- City’s use
- Multi-Family Residential
- Lot
- 1,398 sq ft
- Zoning
- RM3
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
16 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 3, 2022 | Expired or cancelled cancelled Jan 2026 | 1366 Sacramento St | replace (4) (e) windows and (e) rear door, existing openings, not street visible. repair (e) deck landing at rear door. repair (e) front staircase dryrot.Details
replace (4) (e) windows and (e) rear door, existing openings, not street visible. repair (e) deck landing at rear door. repair (e) front staircase dryrot. | $7,000 | |
| Apr 7, 2021 | Completed final sign-off Apr 2022 | 1364 Sacramento St | Brian Birney | split (e) room into walk-thru closet and full bath. adjust door position for bedroom closet. change fixture locations in (e) bath.Details
split (e) room into walk-thru closet and full bath. adjust door position for bedroom closet. change fixture locations in (e) bath. | $15,000 |
| Jan 14, 2021 | Completed final sign-off Apr 2022 | 1364 Sacramento St | Brian Birney | replace 6 e aluminum single pane windows. not street facing. wi new dble paine at existing openings. replace kinob and tube with new. remodel e bath and kitchen. repair dryrot in e deck w staircase. replace e gas wall furnace. ufactor .30 max approx 15%Details
replace 6 e aluminum single pane windows. not street facing. wi new dble paine at existing openings. replace kinob and tube with new. remodel e bath and kitchen. repair dryrot in e deck w staircase. replace e gas wall furnace. ufactor .30 max approx 15% | $45,000 |
| Oct 2, 2020 | Completed final sign-off Nov 2020 | 1362 Sacramento St | stucco repair at building entrance, approx 10 sfDetails
stucco repair at building entrance, approx 10 sf | $2,999 | |
| Mar 28, 2019 | Completed final sign-off Apr 2019 | 1362 Sacramento St | Schmitt Heating Co Inc | replace existing ductwork in attic with new flexible ductwork (less than 40 feet).Details
replace existing ductwork in attic with new flexible ductwork (less than 40 feet). | $13,500 |
| Mar 22, 2019 | Never finaled issued Mar 2019, no final | 1362 Sacramento St | Albion Power Company Inc | street spaceDetails
street space | |
| Mar 8, 2019 | Never finaled issued Mar 2019, no final | 1362 Sacramento St | street spaceDetails
street space | ||
| Dec 28, 2018 | Completed final sign-off Oct 2019 | 1362 Sacramento St | remodel (e) bath, add new full bath, replace 4 windows w/ new which are not street visible at (e) openings. replace 1 window w/ 3 new, replace rafters.Details
remodel (e) bath, add new full bath, replace 4 windows w/ new which are not street visible at (e) openings. replace 1 window w/ 3 new, replace rafters. | $40,000 | |
| Nov 21, 2018 | Never finaled issued Nov 2018, no final | 1362 Sacramento St | street spaceDetails
street space | ||
| Oct 9, 2018 | Completed final sign-off Oct 2018 | 1362 Sacramento St | reroofing. tear off (e) roof surface. install number 28 fiberglass base and modified bitumen membrane on flat roof surface. maherDetails
reroofing. tear off (e) roof surface. install number 28 fiberglass base and modified bitumen membrane on flat roof surface. maher | $9,500 | |
| Aug 10, 2018 | Completed final sign-off Oct 2019 | 1362 Sacramento St | Brian Birney | kitchen & bath remodel,l replace knob & tube w/newDetails
kitchen & bath remodel,l replace knob & tube w/new | $50,000 |
| Jul 30, 2018 | Completed final sign-off Mar 2019 | 1366 Sacramento St | replacement of ten street facing alum windows w/alum clad double hung wood windows. same sizes, same locations. max u.factor 0.32. n/a for maher.Details
replacement of ten street facing alum windows w/alum clad double hung wood windows. same sizes, same locations. max u.factor 0.32. n/a for maher. | $12,000 | |
| Aug 4, 2017 | Completed final sign-off Feb 2018 | 1362 Sacramento St | voluntary structural work, structural strengthening at g/f, add simpson strong frame, add steel beams & remove existing dryrotted wood beams. n/a ordinance #155-13Details
voluntary structural work, structural strengthening at g/f, add simpson strong frame, add steel beams & remove existing dryrotted wood beams. n/a ordinance #155-13 | $50,000 | |
| Mar 28, 2016 | Completed final sign-off Apr 2016 | 1362 Sacramento St | Hammerhouse Construction | repair wood stairs to comply with complaint #201607021, item #2, locally less than 50%.Details
repair wood stairs to comply with complaint #201607021, item #2, locally less than 50%. | $500 |
| Oct 12, 2001 | Completed final sign-off Nov 2001 | 1362 Sacramento St | C & Y Construction Co | replace dryrot boards to ext landing,Details
replace dryrot boards to ext landing, | $950 |
| Sep 27, 2001 | Completed final sign-off Nov 2001 | 1362 Sacramento St | C & Y Construction Co | replace dry rot to garage header trim boards. as per violation report#260115325.Details
replace dry rot to garage header trim boards. as per violation report#260115325. | $1,250 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Brian Birney (3), C & Y Construction Co (2), Albion Power Company Inc, Hammerhouse Construction, Schmitt Heating Co Inc
- Engineers
- Michael Chan, Val Rabichev
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.