Block 3568, lot 049
33 Camp St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
12 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 4, 2019 | Completed final sign-off Mar 2020 | 31 Camp St | to comply w/ physical inspection report cc-8354Details
to comply w/ physical inspection report cc-8354 | ||
| Jul 9, 2019 | Completed final sign-off Aug 2019 | 31 Camp St | Schmitt Heating Co Inc | replace flexible ductwork in garage with new steel ductwork per physical inspection report #cc-8354Details
replace flexible ductwork in garage with new steel ductwork per physical inspection report #cc-8354 | $2,530 |
| Mar 10, 2016 | Completed final sign-off Jun 2016 | 31 Camp St | Keaveney Construction | kitchen remodel in kind. change cabinets & counter tops.Details
kitchen remodel in kind. change cabinets & counter tops. | $20,000 |
| Feb 1, 2016 | Completed final sign-off Oct 2017 | 31 Camp St | Connor Daly Corporation | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. n/a ordinance #155-13Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. n/a ordinance #155-13 | $30,000 |
| Oct 20, 2014 | Completed final sign-off Dec 2014 | 37 Camp St | revision to 201408295138; no bathroom addition, add plugs to bedrooms; maher n/aDetails
revision to 201408295138; no bathroom addition, add plugs to bedrooms; maher n/a | ||
| Aug 29, 2014 | Never finaled issued Sep 2014, no final | 37 Camp St | kitchen and bathroom remodel, update light fixtures; maher n/aDetails
kitchen and bathroom remodel, update light fixtures; maher n/a | $45,000 | |
| Dec 1, 2005 | Completed final sign-off Jun 2006 | 31 Camp St | Logan Design & Construction | remodel kitchen & bathroom to 6 apartments.new kitchen cabinets in all 6 units.new laundry room/closet in all 6 units.6 electricl washer/dryer in all 6 units.demo/build partitions & add doors to create access to front bedroom (n) & closet.Details
remodel kitchen & bathroom to 6 apartments.new kitchen cabinets in all 6 units.new laundry room/closet in all 6 units.6 electricl washer/dryer in all 6 units.demo/build partitions & add doors to create access to front bedroom (n) & closet. | $78,000 |
| Oct 31, 2005 | Completed final sign-off May 2006 | 31 Camp St | Logan Design & Construction | structural upgrade to ground floor. remove (e) wood posts & beams & replace with steel structural.Details
structural upgrade to ground floor. remove (e) wood posts & beams & replace with steel structural. | $30,000 |
| Sep 13, 2005 | Expired or cancelled cancelled Oct 2019 | 31 Camp St | exploratry demolition: kitchen & bath 3 units to determine electrical / plumbing & framing.Details
exploratry demolition: kitchen & bath 3 units to determine electrical / plumbing & framing. | $12,000 | |
| Feb 7, 2003 | Completed final sign-off Dec 2003 | 31 Camp St | R B Roofing Co Inc | reroofingDetails
reroofing | $9,850 |
| Oct 1, 2002 | Expired or cancelled expired Jul 2003 | 31 Camp St | R B Roofing Co Inc | reroofingDetails
reroofing | $9,850 |
| Jun 25, 2001 | Completed final sign-off Jul 2001 | 31 Camp St | Davila Construction Co | repair rear stairs. replace bad boards on landings. repair work less than 50% replacement of stair sDetails
repair rear stairs. replace bad boards on landings. repair work less than 50% replacement of stair s | $1,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Logan Design & Construction (2), R B Roofing Co Inc (2), Connor Daly Corporation, Davila Construction Co, Keaveney Construction, Schmitt Heating Co Inc
- Engineers
- Daniel Barringer (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.