Block 7527, lot 008
428 Gold Mine Dr
- City’s use
- Single Family Residential
- Built
- 1968
- Stories
- 2
- Units
- 1
- Rooms
- 3 bedrooms, 3 bathrooms
- Building
- 2,275 sq ft
- Lot
- 2,665 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
12 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 9, 2020 | Completed final sign-off Jul 2020 | 428 Gold Mine Dr | Houseworks Enterprises Inc. | dry rot repair at garage, replacing dry rotted framing members with new. same size and type as existing.replacing dry rotted framing members with new. same size and type as existing.Details
dry rot repair at garage, replacing dry rotted framing members with new. same size and type as existing.replacing dry rotted framing members with new. same size and type as existing. | $2,000 |
| Oct 26, 2018 | Never finaled issued Oct 2018, no final | 428 Gold Mine Dr | street spaceDetails
street space | ||
| Oct 25, 2018 | Completed final sign-off Jun 2019 | 428 Gold Mine Dr | Schmitt Heating Co Inc | install all new ductwork in ceiling of crawl space, ceilings + soffits in conjunction with install of new furnace (pmw20181023459)Details
install all new ductwork in ceiling of crawl space, ceilings + soffits in conjunction with install of new furnace (pmw20181023459) | $5,225 |
| Jul 18, 2018 | Completed final sign-off Jun 2020 | 428 Gold Mine Dr | Houseworks Enterprises Inc. | modify pa 2018-0425-7398 to include: dry rot repair and structural reinforcement to rear 1st story and spa deck. add bathtub to ground level bathroom, convert family room to bedroom. relocate fireplace at 1st fl. voluntary seismic improvements & replacement of non street facing windowDetails
modify pa 2018-0425-7398 to include: dry rot repair and structural reinforcement to rear 1st story and spa deck. add bathtub to ground level bathroom, convert family room to bedroom. relocate fireplace at 1st fl. voluntary seismic improvements & replacement of non street facing window | $15,000 |
| Apr 25, 2018 | Completed final sign-off Jun 2020 | 428 Gold Mine Dr | Houseworks Enterprises Inc. | bathroom & kitchen remodel. replace all finishes & fixtures in-kind. new floors & wall finishes. no structural work or walls removed.Details
bathroom & kitchen remodel. replace all finishes & fixtures in-kind. new floors & wall finishes. no structural work or walls removed. | $38,837 |
| Dec 16, 2013 | Completed final sign-off Sep 2014 | 428 Gold Mine Dr | add new 100 sf deck & hot tub. new sliding door to replace (e) window on east wall.Details
add new 100 sf deck & hot tub. new sliding door to replace (e) window on east wall. | $15,000 | |
| Dec 26, 2012 | Completed final sign-off Mar 2013 | 428 Gold Mine Dr | J. Razo Construction | kitchen remodel (remodel of stove)Details
kitchen remodel (remodel of stove) | $5,000 |
| Jul 16, 2012 | Completed final sign-off Mar 2013 | 428 Gold Mine Dr | build partition wall in laundry area, 1st floor (basement)Details
build partition wall in laundry area, 1st floor (basement) | $1,000 | |
| Jan 26, 2012 | Completed final sign-off May 2012 | 428 Gold Mine Dr | American Home Renewal Inc | replace 8 windows & 5 patio doors in kind. visable from street, no structural changes, max u factor 0.40. aluminum to aluminum frames.Details
replace 8 windows & 5 patio doors in kind. visable from street, no structural changes, max u factor 0.40. aluminum to aluminum frames. | $12,000 |
| Jan 20, 2012 | Completed final sign-off Mar 2012 | 428 Gold Mine Dr | Gray Industries Inc | remove portion of wall in kitchen to open view. replace deck railing, change electrical service panel, change entire tiles, install skylights in master bedroom.Details
remove portion of wall in kitchen to open view. replace deck railing, change electrical service panel, change entire tiles, install skylights in master bedroom. | $25,000 |
| Sep 12, 2011 | Completed final sign-off Nov 2011 | 428 Gold Mine Dr | Barvilla Construction | kitchen remodel: change cabinet, new appliance, tile floor, granite counter tops, 5 gfci outlets, dishwasher outlet & disposer outlet. master bath: shower wall tiles, floor tiles, new vanity, new toilet. second bath: shower wall tiles, floor tiles, new vanity, new toilet. basement bath: showerDetails
kitchen remodel: change cabinet, new appliance, tile floor, granite counter tops, 5 gfci outlets, dishwasher outlet & disposer outlet. master bath: shower wall tiles, floor tiles, new vanity, new toilet. second bath: shower wall tiles, floor tiles, new vanity, new toilet. basement bath: shower | $18,500 |
| Dec 3, 2004 | Never finaled issued Dec 2004, no final | 428 Gold Mine Dr | Armstrong Installation Service | reroofingDetails
reroofing | $15,843 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.