Yosi Asraf
- Listed as
- authorized agent-others, contractor, designer
- Firm
- G B U Construction Development
- Based in
- San Francisco
- On San Francisco permits
- Dec 2014 to Jul 2026
101 permits since 2000 (contractor on 101 permits, authorized agent-others on 3 permits, designer on 1 permit): 70 completed, 7 in progress, 16 never finaled, 8 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 101.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 27, 2026 | In progress issued Jul 2026 | 457 12th Av | G B U Construction Development | kitchen & bathroom remodel, like for like.Details
kitchen & bathroom remodel, like for like. | $40,000 |
| Jul 7, 2026 | In progress issued Jul 2026 | 1830 Lyon St | G B U Construction Development | voluntary structural strenthening in the rear garage.Details
voluntary structural strenthening in the rear garage. | $20,000 |
| Jun 25, 2026 | Completed final sign-off Jul 2026 | 1235 08th Av | G B U Construction Development | recommencement and completion of work approved under pa#20241105442.Details
recommencement and completion of work approved under pa#20241105442. | $5,000 |
| Apr 15, 2026 | Completed final sign-off Aug 2026 | 2366 28th Av | G B U Construction Development | rewire house, replace vanity, drywall only at garage.Details
rewire house, replace vanity, drywall only at garage. | $10,000 |
| Feb 17, 2026 | In progress issued Feb 2026 | 61 Pleasant St | G B U Construction Development | recommencement and completion of work approved under pa# 201801269697Details
recommencement and completion of work approved under pa# 201801269697 | $27,000 |
| Feb 17, 2026 | In progress issued Apr 2026 | 1260 Sacramento St | G B U Construction Development | revision to pa #201801269701: revision of rear exterior stair on 1260 sacramento street from 3rd floor to roof deck. approved spiral stair to be removed. approved staight run stair to be includes in scope.Details
revision to pa #201801269701: revision of rear exterior stair on 1260 sacramento street from 3rd floor to roof deck. approved spiral stair to be removed. approved staight run stair to be includes in scope. | |
| Jan 22, 2026 | Completed final sign-off Mar 2026 | 30 Lapidge St | G B U Construction Development | bathroom remodel like for like. no wall alterations.Details
bathroom remodel like for like. no wall alterations. | $10,000 |
| Jul 11, 2025 | Completed final sign-off Apr 2026 | 1318 31st Av | G B U Construction Development | comply with nov 201888261. provide new concrete underpinning pits along property line.Details
comply with nov 201888261. provide new concrete underpinning pits along property line. | $40,000 |
| Jul 9, 2025 | Completed final sign-off Dec 2025 | 1758 32nd Av | G B U Construction Development | kitchen remodel with load bearing wall removal. bathroom remodelDetails
kitchen remodel with load bearing wall removal. bathroom remodel | $70,000 |
| Jul 9, 2025 | In progress issued Jul 2025 | 2450 20th Av | G B U Construction Development, H & Bo Construction Inc. | revision 201803153794, change foundation design. change interior layout of unit to be legalized to comply with nov 201755441Details
revision 201803153794, change foundation design. change interior layout of unit to be legalized to comply with nov 201755441 | $150,000 |
| Jul 9, 2025 | Expired or cancelled withdrawn Apr 2026 | 1260 Sacramento St | G B U Construction Development | revision to pa# 201801269701: change back balcony spiral stairs to typical wood stairs.Details
revision to pa# 201801269701: change back balcony spiral stairs to typical wood stairs. | $5,000 |
| Jul 8, 2025 | Completed final sign-off Sep 2025 | 346 01st St | G B U Construction Development | unit#101: bathroom remodel in kind.Details
unit#101: bathroom remodel in kind. | $10,000 |
| Jun 9, 2025 | Completed final sign-off Jun 2026 | 635 Baker St | G B U Construction Development | revision to permit #202204111986 to reflect existing conditions and changes at gridline c dimensions between gridline added to foundation plan.Details
revision to permit #202204111986 to reflect existing conditions and changes at gridline c dimensions between gridline added to foundation plan. | $5,000 |
| Nov 26, 2024 | Expired or cancelled expired Jul 2026 | 1235 08th Av | G B U Construction Development | per ab1114:(e) 1st fl space is proposed to be deemed an adu via governmental code section 65852-2(a)-(d)ord 95-17.(n)rear(e)deck & stair.(n)interior remodeling of(e)space,upgrading(e)bath,(n)kitchen cabinets & appliances.(n)hvac& lighting.(n)wall to separate laundry space from garage.Details
per ab1114:(e) 1st fl space is proposed to be deemed an adu via governmental code section 65852-2(a)-(d)ord 95-17.(n)rear(e)deck & stair.(n)interior remodeling of(e)space,upgrading(e)bath,(n)kitchen cabinets & appliances.(n)hvac& lighting.(n)wall to separate laundry space from garage. | $50,000 |
| Nov 7, 2024 | Completed final sign-off Jun 2025 | 1262 19th Av | G B U Construction Development | front of building: repair dry rot on balcony, like to like, less than 50%Details
front of building: repair dry rot on balcony, like to like, less than 50% | $5,000 |
| Jul 25, 2024 | Completed final sign-off Nov 2024 | 90 Mountain Spring Av | G B U Construction Development | one kitchen remodel and 2 bathroom remodel. non-structural, sub and main panel upgradeDetails
one kitchen remodel and 2 bathroom remodel. non-structural, sub and main panel upgrade | $40,000 |
| Jul 9, 2024 | Completed final sign-off Dec 2024 | 1741 16th Av | G B U Construction Development | replace (5) windows (same opening, in-kind). exterior painting.Details
replace (5) windows (same opening, in-kind). exterior painting. | $10,000 |
| Jun 3, 2024 | Completed final sign-off Oct 2024 | 556 Congo St | G B U Construction Development | remodel laundry room- water heater and gas line. drywall and finish laindry room, update electrical and plumbing, no layout changes.Details
remodel laundry room- water heater and gas line. drywall and finish laindry room, update electrical and plumbing, no layout changes. | $15,000 |
| Apr 18, 2024 | Completed final sign-off Jul 2024 | 30 Otsego Av | G B U Construction Development | opening kitchen wall (b/t kitchen and living room) keeping existing beamDetails
opening kitchen wall (b/t kitchen and living room) keeping existing beam | $10,000 |
| Dec 11, 2023 | Expired or cancelled withdrawn Mar 2024 | 346 Hearst Av | G B U Construction Development | revision to pa# 202306069329, changing top railing to wood.Details
revision to pa# 202306069329, changing top railing to wood. | $1,000 |
| Nov 21, 2023 | In progress issued Aug 2024 | 6 San Pablo Av | G B U Construction Development | altered site permit. revision to bpa#2022-0805-0034 related to variance case 2022-007994var. proposed stairs, landing and roof deck at rear, plus additional interior alterations and additional exterior facade changes.Details
altered site permit. revision to bpa#2022-0805-0034 related to variance case 2022-007994var. proposed stairs, landing and roof deck at rear, plus additional interior alterations and additional exterior facade changes. | $5,000 |
| Nov 7, 2023 | In progress issued Nov 2023 | 16 Miraloma Dr | G B U Construction Development, Barcci Builders Inc | demolish and repour new concrete slab in garage. approx 800sf. 6" thick with 3500 psi conc. #4 at 24" o.c. no change in ceiling heightDetails
demolish and repour new concrete slab in garage. approx 800sf. 6" thick with 3500 psi conc. #4 at 24" o.c. no change in ceiling height | $20,000 |
| Oct 3, 2023 | Completed final sign-off Oct 2024 | 556 Congo St | G B U Construction Development | revision to permit 202107164565. add a (2) new dormers to north-east roof above the new bedroom at attic floor. minor revision to structural details.Details
revision to permit 202107164565. add a (2) new dormers to north-east roof above the new bedroom at attic floor. minor revision to structural details. | $5,000 |
| Oct 2, 2023 | Completed final sign-off Oct 2025 | 2005 17th St | G B U Construction Development | repair dryrot damage in 1 bedroom. bring the room wires & plumbing up to code (discovered after removal of drywall). new tpo on the bedroom roof. no work visible from street. no changes to architectural and structural.Details
repair dryrot damage in 1 bedroom. bring the room wires & plumbing up to code (discovered after removal of drywall). new tpo on the bedroom roof. no work visible from street. no changes to architectural and structural. | $12,000 |
| Sep 21, 2023 | Completed final sign-off Jul 2024 | 127 Scott St | G B U Construction Development | revision to bpa# 202112154510: addition of new direct vent gas fireplace.Details
revision to bpa# 202112154510: addition of new direct vent gas fireplace. | $1,200 |
| Sep 20, 2023 | Completed final sign-off Nov 2023 | 414 43rd Av | G B U Construction Development | revision to pa# 202308214887, change from cmu wall to concreteDetails
revision to pa# 202308214887, change from cmu wall to concrete | |
| Sep 20, 2023 | Completed final sign-off Oct 2025 | 2005 17th St | G B U Construction Development | 8 windows replacement new construction, in-kind. 4 winidows to be visible from street. 4 window not visible. uf<0.3. dcp approval rqd. replace with wood aluminum cloud.Details
8 windows replacement new construction, in-kind. 4 winidows to be visible from street. 4 window not visible. uf<0.3. dcp approval rqd. replace with wood aluminum cloud. | $41,000 |
| Aug 28, 2023 | Completed final sign-off Dec 2023 | 30 Otsego Av | G B U Construction Development | demo (e) siding on exterior lightwell wall and back house wall and install lath and stucco. all work is not visible from the stree.Details
demo (e) siding on exterior lightwell wall and back house wall and install lath and stucco. all work is not visible from the stree. | $60,000 |
| Aug 21, 2023 | Completed final sign-off Nov 2023 | 414 43rd Av | G B U Construction Development | retaining wall @ rear yard north side to comply w/ violation 202305296Details
retaining wall @ rear yard north side to comply w/ violation 202305296 | $15,000 |
| Aug 14, 2023 | Completed final sign-off Feb 2024 | 2510 Bush St | G B U Construction Development, Nolan Construction Inc | repair e site retaining wall (rear) with new drilled pier retaining wall. comply withy nov 202301867Details
repair e site retaining wall (rear) with new drilled pier retaining wall. comply withy nov 202301867 | $25,000 |
| Jun 8, 2023 | Completed final sign-off Jul 2024 | 127 Scott St | G B U Construction Development | indicate (e) exterior stairs constructed without the benefit of building permit, comply with nov 202308932, indicate (e) site concrete walls to be repaired or replaced, indicate site concrete steps on grade. revision to 202112154510Details
indicate (e) exterior stairs constructed without the benefit of building permit, comply with nov 202308932, indicate (e) site concrete walls to be repaired or replaced, indicate site concrete steps on grade. revision to 202112154510 | $1,000 |
| Jun 6, 2023 | Completed final sign-off Mar 2024 | 346 Hearst Av | G B U Construction Development | revision to bpa#202304045033, add framing details/structural calcs for framing workDetails
revision to bpa#202304045033, add framing details/structural calcs for framing work | |
| Jun 5, 2023 | Completed final sign-off Jul 2023 | 121 Scott St | G B U Construction Development | to comply with nov# 202308955. underpinning of foundation under north property line wall near north west corner of building (total length of under pinning 7'-6")Details
to comply with nov# 202308955. underpinning of foundation under north property line wall near north west corner of building (total length of under pinning 7'-6") | $1,500 |
| Jun 5, 2023 | Expired or cancelled cancelled Jan 2026 | 2814 Clay St | G B U Construction Development | shoring plans soliter piles. unit legalization under pa# 202106182818Details
shoring plans soliter piles. unit legalization under pa# 202106182818 | $30,000 |
| May 15, 2023 | Completed final sign-off Aug 2023 | 3665 Wawona St | G B U Construction Development | 1 bedroom & 1 bathroom remodel in-kind.Details
1 bedroom & 1 bathroom remodel in-kind. | $30,000 |
| Apr 4, 2023 | Never finaled issued Apr 2023, no final | 2814 Clay St | G B U Construction Development, Jj Construction & Design Inc. | revision to pa# 202106182818, revise plams to move exterior garage wall on west side of building at basement lvl.Details
revision to pa# 202106182818, revise plams to move exterior garage wall on west side of building at basement lvl. | $5,000 |
| Apr 4, 2023 | Completed final sign-off Mar 2024 | 346 Hearst Av | G B U Construction Development | remove terrazzo finishe from stair and replace it w/ wood finishes. replace handrail. add lights at stairs risers. smooth white stucco @ stair stoopsDetails
remove terrazzo finishe from stair and replace it w/ wood finishes. replace handrail. add lights at stairs risers. smooth white stucco @ stair stoops | $35,000 |
| Mar 17, 2023 | Completed final sign-off Jun 2023 | 3665 Wawona St | G B U Construction Development | close off 2 windows in rear facade of building. replace 8 windows "like for like". replace 2 windows fofr smaller size. new stucco and paint - rear facade.Details
close off 2 windows in rear facade of building. replace 8 windows "like for like". replace 2 windows fofr smaller size. new stucco and paint - rear facade. | $20,000 |
| Mar 7, 2023 | Completed final sign-off Jan 2024 | 2200 Sacramento St | G B U Construction Development | one kitchen remodel like for like. one bathroom remodel like for like, no shower pan. one bathroom remodel like for like, shower pan. one laundry room like for like. no walls or layout change.Details
one kitchen remodel like for like. one bathroom remodel like for like, no shower pan. one bathroom remodel like for like, shower pan. one laundry room like for like. no walls or layout change. | $50,000 |
| Jan 5, 2023 | Completed final sign-off May 2024 | 1741 16th Av | G B U Construction Development | remodel kitchen, new cabinets & appliances; remodel bathroom, relocate fixtures; add washer/dryer hookups @ hall closet. no structural work.Details
remodel kitchen, new cabinets & appliances; remodel bathroom, relocate fixtures; add washer/dryer hookups @ hall closet. no structural work. | $25,000 |
| Nov 23, 2022 | Never finaled issued Feb 2023, no final | 2814 Clay St | G B U Construction Development, Jj Construction & Design Inc. | revision to 202106182818. plan revision included structural and add elevator in legalized uduDetails
revision to 202106182818. plan revision included structural and add elevator in legalized udu | |
| Oct 19, 2022 | Completed final sign-off Apr 2023 | 1211 Egbert Av | G B U Construction Development | in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 2 shower pan(s).Details
in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 2 shower pan(s). | $53,000 |
| Sep 1, 2022 | Completed final sign-off Sep 2022 | 2225 23rd St | G B U Construction Development | 1 bathroom remodel- convert tub to shower, shower pan.Details
1 bathroom remodel- convert tub to shower, shower pan. | $15,000 |
| Aug 18, 2022 | Completed final sign-off Sep 2022 | 732 Francisco St | G B U Construction Development | back deck repair less than 50%Details
back deck repair less than 50% | $15,000 |
| Aug 5, 2022 | Never finaled issued Jun 2023, no final | 6 San Pablo Av | G B U Construction Development | proposed remodel & horizontal addition with structural,plumbing & electrical work. replacement & new windows on front,sides and rear.Details
proposed remodel & horizontal addition with structural,plumbing & electrical work. replacement & new windows on front,sides and rear. | $815,000 |
| May 27, 2022 | Completed final sign-off Sep 2022 | 2225 23rd St | G B U Construction Development | unit #304: 1 complete bathroom remodel. no walls or layout change. shower pan.Details
unit #304: 1 complete bathroom remodel. no walls or layout change. shower pan. | $20,000 |
| May 18, 2022 | Expired or cancelled cancelled Jul 2022 | 2225 23rd St | G B U Construction Development, Remodeling Heroes Inc. | unit# 315. 1 bathroom remodel. convert tub to walk in shower.Details
unit# 315. 1 bathroom remodel. convert tub to walk in shower. | $15,000 |
| May 13, 2022 | Never finaled issued Jul 2022, no final | 1927 Ulloa St | G B U Construction Development | relocate kitchen, closes two windows (interior) in the bathrooms. flip stairs in the same location and enclose this area. add a laundry room upstairs. add a skylight in kitchen and stairs.Details
relocate kitchen, closes two windows (interior) in the bathrooms. flip stairs in the same location and enclose this area. add a laundry room upstairs. add a skylight in kitchen and stairs. | $80,000 |
| Apr 11, 2022 | Completed final sign-off Jun 2026 | 635 Baker St | G B U Construction Development | 637b baker st: legalization of one udu at attic (per ord 43-14). remove enclosure at rear rm & restore as exterior terrace. legalize unpermitted exterior work: 2 dormers & skylights at roofDetails
637b baker st: legalization of one udu at attic (per ord 43-14). remove enclosure at rear rm & restore as exterior terrace. legalize unpermitted exterior work: 2 dormers & skylights at roof | $15,000 |
| Mar 24, 2022 | Completed final sign-off Sep 2022 | 734 Francisco St | G B U Construction Development | repair deck like for like 49%Details
repair deck like for like 49% | $15,000 |
| Mar 17, 2022 | Completed final sign-off May 2022 | 1020 Francisco St | G B U Construction Development | replace existing roof top decking like for like. less than 500sf. if over 500sf, wood cannot be used per sfbc section 1510.10.Details
replace existing roof top decking like for like. less than 500sf. if over 500sf, wood cannot be used per sfbc section 1510.10. | $20,000 |
| Mar 2, 2022 | Never finaled issued Mar 2022, no final | 75 Folsom St | G B U Construction Development | unit # 1702: convert dining room to bedroom. no combining units.all work is done on one unit. no exterior workDetails
unit # 1702: convert dining room to bedroom. no combining units.all work is done on one unit. no exterior work | $50,000 |
| Feb 25, 2022 | Completed final sign-off Jun 2022 | 31 Loyola Tr | G B U Construction Development | replace front steps & bricks only. no structural or framing work to be done. cosmetic only. less than 50%.Details
replace front steps & bricks only. no structural or framing work to be done. cosmetic only. less than 50%. | $5,000 |
| Feb 18, 2022 | Completed final sign-off Jun 2022 | 1338 28th Av | G B U Construction Development | interior remodel. add a full bath 1st flDetails
interior remodel. add a full bath 1st fl | $15,000 |
| Feb 4, 2022 | Completed final sign-off Dec 2024 | 1626 31st Av | G B U Construction Development | 1st floor: remodel extg bathroom. create addition habitable area behind garage. create deck at rear yard non (311). 2nd floor: add sink to extg powder room. remove portion of wall between eating and kitchen.Details
1st floor: remodel extg bathroom. create addition habitable area behind garage. create deck at rear yard non (311). 2nd floor: add sink to extg powder room. remove portion of wall between eating and kitchen. | $22,000 |
| Jan 14, 2022 | Completed final sign-off Jul 2022 | 2576 24th Av | G B U Construction Development | siding and waterproof back wall - 3 windows retrofit, siding in the back of the house. all like for like work. no structural.Details
siding and waterproof back wall - 3 windows retrofit, siding in the back of the house. all like for like work. no structural. | $30,000 |
| Dec 28, 2021 | Completed final sign-off Oct 2022 | 1670 31st Av | G B U Construction Development | remodel (e) bathroom/closet into 2 bathrooms, (e) kitchen, provide egress hall and storage at (e) ground level. remove interior stair.Details
remodel (e) bathroom/closet into 2 bathrooms, (e) kitchen, provide egress hall and storage at (e) ground level. remove interior stair. | $50,000 |
| Dec 15, 2021 | Completed final sign-off Jul 2024 | 127 Scott St | G B U Construction Development | remodel of (e) units, expansion of lower residential unit to unused portion of 1/f, replacement of (e0 alum windows at street front with double pane wood windows. replacement of other single pane window with double pane vinyl windows, remodel of 2 (e) full bath, replacement of 2.25 bathrooms with 2Details
remodel of (e) units, expansion of lower residential unit to unused portion of 1/f, replacement of (e0 alum windows at street front with double pane wood windows. replacement of other single pane window with double pane vinyl windows, remodel of 2 (e) full bath, replacement of 2.25 bathrooms with 2 | $142,500 |
| Dec 13, 2021 | Completed final sign-off Sep 2022 | 1900 Monterey Bl | G B U Construction Development | complete family bathroom remodel & half bathroom remodel; like for like, no walls or layout change.Details
complete family bathroom remodel & half bathroom remodel; like for like, no walls or layout change. | $35,000 |
| Oct 14, 2021 | Completed final sign-off Oct 2024 | 47 Chenery St | G B U Construction Development | remodel kitchen & 1 bathroom.all appliances & plumbing fixtures locations will not change.Details
remodel kitchen & 1 bathroom.all appliances & plumbing fixtures locations will not change. | $12,800 |
| Sep 3, 2021 | Completed final sign-off Sep 2022 | 68 Richardson Av | G B U Construction Development | revision to bpa#201803052884. remodel kitchen & (1) bathroom, add (1) window @ 2/f, (1) window @ 3/f, revise skylight hatch @ roof, & front security gate.Details
revision to bpa#201803052884. remodel kitchen & (1) bathroom, add (1) window @ 2/f, (1) window @ 3/f, revise skylight hatch @ roof, & front security gate. | $5,000 |
| Sep 1, 2021 | Completed final sign-off Nov 2021 | 7 Roscoe St | G B U Construction Development | bathroom tub like for like. h.e. lighting and vacancy sensor. non structuarl.Details
bathroom tub like for like. h.e. lighting and vacancy sensor. non structuarl. | $10,000 |
| Aug 20, 2021 | Completed final sign-off Oct 2021 | 836 Brussels St | G B U Construction Development | 1 bathroom remodel: tub like for like. no walls or layout change. lights per cenc 150.0(k)Details
1 bathroom remodel: tub like for like. no walls or layout change. lights per cenc 150.0(k) | $15,000 |
| Jul 27, 2021 | Expired or cancelled withdrawn May 2024 | 1237 08th Av | G B U Construction Development | legalization ordinance 43-14, legalizing an unauthorized dwelling unit. install smoke detector and carbon monoxide hard wire.Details
legalization ordinance 43-14, legalizing an unauthorized dwelling unit. install smoke detector and carbon monoxide hard wire. | $500 |
| Jul 16, 2021 | Completed final sign-off Oct 2024 | 556 Congo St | G B U Construction Development | convert (e) attic space into living space including one bedroom,one bath & a den. total area is 437 sq ft.install one(n) dormer to the south side of (e) roof.install 4 new skylights to the north side of (e) roof.Details
convert (e) attic space into living space including one bedroom,one bath & a den. total area is 437 sq ft.install one(n) dormer to the south side of (e) roof.install 4 new skylights to the north side of (e) roof. | $50,000 |
| Jul 1, 2021 | Completed final sign-off Feb 2023 | 489 Harrison St | E S Construction, G B U Construction Development | unit 507: one kitchen remodel like for like, subpanel. bathroom remodel like for like. half bathroom remodel like for like. bathroom remodel like for like (only change is converting tub to shower)Details
unit 507: one kitchen remodel like for like, subpanel. bathroom remodel like for like. half bathroom remodel like for like. bathroom remodel like for like (only change is converting tub to shower) | $45,000 |
| Jun 25, 2021 | Never finaled issued Jun 2021, no final | 75 Folsom St | G B U Construction Development | 1 complete kitchen remodel like for like. 1 complete bathroom remodel like for like. no layout or wall changes.Details
1 complete kitchen remodel like for like. 1 complete bathroom remodel like for like. no layout or wall changes. | $25,000 |
| Jun 25, 2021 | Completed final sign-off Jan 2022 | 355 Buena Vista East Av | G B U Construction Development | unit 308w: 1 kitchen remodel like for like. no layout change. 1 bathroom remodel like for like rewire and sub panel (same location)Details
unit 308w: 1 kitchen remodel like for like. no layout change. 1 bathroom remodel like for like rewire and sub panel (same location) | $35,000 |
| Jun 18, 2021 | Never finaled issued Aug 2022, no final | 2814 Clay St | G B U Construction Development, Jj Construction & Design Inc. | unit legalization. interior remodel to convert (e) 966 sf, 1 bedroom 1 bath "unauthorized dwelling unit" into (n) residential unit (legal nonconforming third unit). lower the (e) concrete slab and add site steps in hallway to accommodate code compliant head height. ordinance 43-14Details
unit legalization. interior remodel to convert (e) 966 sf, 1 bedroom 1 bath "unauthorized dwelling unit" into (n) residential unit (legal nonconforming third unit). lower the (e) concrete slab and add site steps in hallway to accommodate code compliant head height. ordinance 43-14 | $50,000 |
| Apr 20, 2021 | Completed final sign-off Jan 2023 | 230 Faxon Av | G B U Construction Development | 2nd fl work only: remodel extg kitchen and extg bathroom. construct new half bath. remove wall between dining room and kitchen. new lighting and elect. no structural work.Details
2nd fl work only: remodel extg kitchen and extg bathroom. construct new half bath. remove wall between dining room and kitchen. new lighting and elect. no structural work. | $80,000 |
| Feb 4, 2021 | Never finaled issued Oct 2022, no final | 1558 Shafter Av | S And L Remodeling And Design Inc, G B U Construction Development | new deck, add adu to the rear of the ground floor per government code section 65852.2. new kitchen remodel & drywall.Details
new deck, add adu to the rear of the ground floor per government code section 65852.2. new kitchen remodel & drywall. | $200,000 |
| Feb 2, 2021 | Never finaled issued May 2021, no final | 943 York St | G B U Construction Development | revision to pa# 2015-0807-3719: change windows unseen from street to vinyl,change doors and windows on south side, remove room and change bath and closet on 1st fl. 2nd fl: add interior door, window at bath, washer and dryer, 3rd fl. change and move doors, 4th fl. change ceiling heights, bath sizeDetails
revision to pa# 2015-0807-3719: change windows unseen from street to vinyl,change doors and windows on south side, remove room and change bath and closet on 1st fl. 2nd fl: add interior door, window at bath, washer and dryer, 3rd fl. change and move doors, 4th fl. change ceiling heights, bath size | $4,200 |
| Dec 16, 2020 | Completed final sign-off Aug 2021 | 855 Folsom St | G B U Construction Development | bathroom remodel remove tub add roll in shower.Details
bathroom remodel remove tub add roll in shower. | $20,000 |
| Nov 17, 2020 | Completed final sign-off Sep 2022 | 501 Thornton Av | G B U Construction Development | convert lower level to adu. remodel kitchen in main unit. remove walls in main unit. all new windows in main unit. new rear deck.Details
convert lower level to adu. remodel kitchen in main unit. remove walls in main unit. all new windows in main unit. new rear deck. | $180,000 |
| Nov 17, 2020 | Expired or cancelled cancelled May 2021 | 554 Banks St | W And W Builders Group Inc, G B U Construction Development | demolition of existing partitions. installation of structural post and beam to replace demolished partitionDetails
demolition of existing partitions. installation of structural post and beam to replace demolished partition | $30,000 |
| Oct 19, 2020 | Completed final sign-off May 2022 | 92 28th St | G B U Construction Development | bathroom remodel like for like. lower floor unit, no layout change or wall change. 40sqftDetails
bathroom remodel like for like. lower floor unit, no layout change or wall change. 40sqft | $15,000 |
| Oct 13, 2020 | Completed final sign-off Apr 2021 | 188 Landers St | G B U Construction Development | 2 complete bath remodel, like for like. tub to tub. kitchen remodel complete, subpanel. no walls/layout changeDetails
2 complete bath remodel, like for like. tub to tub. kitchen remodel complete, subpanel. no walls/layout change | $45,000 |
| Oct 9, 2020 | Completed final sign-off Jan 2021 | 1025 Rhode Island St | G B U Construction Development | repair stucco in front of buildingDetails
repair stucco in front of building | $15,000 |
| Oct 9, 2020 | Completed final sign-off Jan 2021 | 123 Connecticut St | G B U Construction Development | repairing siding in the front of the house. like for like sidingDetails
repairing siding in the front of the house. like for like siding | $10,000 |
| Sep 19, 2020 | Never finaled issued Aug 2021, no final | 1237 08th Av | G B U Construction Development | interior remodel: removal of non-structural walls, construction of new walls, kitchen remode -new cabinets, appliances, plumbing fixtures and finishes. new electrical. new footing & walls. enclose lightwell.Details
interior remodel: removal of non-structural walls, construction of new walls, kitchen remode -new cabinets, appliances, plumbing fixtures and finishes. new electrical. new footing & walls. enclose lightwell. | $15,000 |
| Sep 14, 2020 | Completed final sign-off Feb 2021 | 849 Mason St | G B U Construction Development | to comply w/ nov 202050591. repair from car ran into building repair framing in front of bldg. no changes.Details
to comply w/ nov 202050591. repair from car ran into building repair framing in front of bldg. no changes. | $5,000 |
| Jul 10, 2020 | Never finaled issued Jul 2020, no final | 1366 40th Av | G B U Construction Development | demo & exploratory in order to show the structural engineer the existing framing so he can draft structurl plans. after demo, work will stop and wait until plans are ready & submit those plans for the rest of the work. 500sf of demoval only. ref nov #202033782Details
demo & exploratory in order to show the structural engineer the existing framing so he can draft structurl plans. after demo, work will stop and wait until plans are ready & submit those plans for the rest of the work. 500sf of demoval only. ref nov #202033782 | $3,000 |
| May 12, 2020 | Completed final sign-off Aug 2020 | 1632 Dolores St | G B U Construction Development | waterproof for 2 balconies. waterproof paper installation for backwall, and install new wood siding. all work in back of building. not visible to street. all work in kind.Details
waterproof for 2 balconies. waterproof paper installation for backwall, and install new wood siding. all work in back of building. not visible to street. all work in kind. | $6,000 |
| Feb 3, 2020 | Never finaled issued Jul 2022, no final | 2814 Clay St | G B U Construction Development, Jj Construction & Design Inc. | rear yard expansion, remove unit 2 stairs and relocate. add remodel kitchen and add master bath and 3rd flr roof deck.Details
rear yard expansion, remove unit 2 stairs and relocate. add remodel kitchen and add master bath and 3rd flr roof deck. | $500,000 |
| Nov 5, 2019 | Completed final sign-off Dec 2020 | 46 Pond St | G B U Construction Development | garage conversion 2 bedroom 2 bathroom & laundry roomDetails
garage conversion 2 bedroom 2 bathroom & laundry room | $150,000 |
| Oct 23, 2019 | Completed final sign-off Jan 2020 | 4 Museum Wy | G B U Construction Development | 8 ibg square flat roof from gravel to tpo, re-water proof patioDetails
8 ibg square flat roof from gravel to tpo, re-water proof patio | $5,000 |
| Oct 3, 2019 | Completed final sign-off Mar 2020 | 585 Crestlake Dr | G B U Construction Development | kitchen rmeodel, like for like. 156 sq ft. main and subpanel replaceDetails
kitchen rmeodel, like for like. 156 sq ft. main and subpanel replace | $7,000 |
| Oct 2, 2019 | Completed final sign-off Aug 2020 | 849 Mason St | G B U Construction Development | unit 2. master bathroom/closet remodel - remove closet wall to make closet bigger. relocating toilet, vanity, shower tubDetails
unit 2. master bathroom/closet remodel - remove closet wall to make closet bigger. relocating toilet, vanity, shower tub | $5,000 |
| Sep 25, 2019 | Completed final sign-off Aug 2020 | 849 Mason St | G B U Construction Development | unit 2. kitchen, kid's bathroom 8x7, guest bathroom remodel 5x7, like for like.Details
unit 2. kitchen, kid's bathroom 8x7, guest bathroom remodel 5x7, like for like. | $12,000 |
| Sep 23, 2019 | Completed final sign-off Oct 2020 | 22 Gaviota Wy | G B U Construction Development | kitchen complete rmeodel, removing a wall, rewire the entire houseupgrade 100 to 200amp panel box main and sub. replacing sliding door in backyard like for like. deck repair like for like, less than 50%. remodel laundry room.Details
kitchen complete rmeodel, removing a wall, rewire the entire houseupgrade 100 to 200amp panel box main and sub. replacing sliding door in backyard like for like. deck repair like for like, less than 50%. remodel laundry room. | $20,000 |
| Aug 21, 2019 | Completed final sign-off Oct 2020 | 22 Gaviota Wy | G B U Construction Development | remodel 2 bathrooms, like for like. relocate the toilet at hallway bath. no alteration of walls. bath # 1 50 sq ft, bath # 2 46 sq ftDetails
remodel 2 bathrooms, like for like. relocate the toilet at hallway bath. no alteration of walls. bath # 1 50 sq ft, bath # 2 46 sq ft | $20,000 |
| Aug 2, 2019 | Expired or cancelled cancelled Jan 2021 | 763 Andover St | G B U Construction Development, Planart Construction Corp | replace wood retainin wall with concrete retaining wall at front yard.Details
replace wood retainin wall with concrete retaining wall at front yard. | $10,000 |
| Jul 22, 2019 | Completed final sign-off Feb 2021 | 763 Andover St | G B U Construction Development, Planart Construction Corp | apply acrylic coat to exterior front stuco to smooth the walls. install siding on front. replace 2 front windows in (e) opening, size and location remain unchanged. max u-factor 0.32. isntall new garage door.Details
apply acrylic coat to exterior front stuco to smooth the walls. install siding on front. replace 2 front windows in (e) opening, size and location remain unchanged. max u-factor 0.32. isntall new garage door. | $20,000 |
| Jul 2, 2019 | Completed final sign-off Jan 2020 | 608 Haight St | G B U Construction Development | kitchen remodel, like for like, rebrasting the fridge, sink and washer dryer. decrease kitchen window sizeDetails
kitchen remodel, like for like, rebrasting the fridge, sink and washer dryer. decrease kitchen window size | $15,000 |
| Jun 21, 2019 | Completed final sign-off Aug 2024 | 9 Roscoe St | G B U Construction Development | horizontal at 3/f. interior remodelDetails
horizontal at 3/f. interior remodel | $150,000 |
| Mar 15, 2019 | Never finaled filed Mar 2019, never issued | 836 Lyon St | G B U Construction Development | struct. remodel of entire bldg, convert a portion of ground floor garage/storage area into a dwelling unit, change of occup. from 2-unit r3 to 3-unit r2, rear yard horiz. & vert. expansion of all three floors, construct new rear yard decks and common roof deck, install nfpa 13 fire sprinkler system.Details
struct. remodel of entire bldg, convert a portion of ground floor garage/storage area into a dwelling unit, change of occup. from 2-unit r3 to 3-unit r2, rear yard horiz. & vert. expansion of all three floors, construct new rear yard decks and common roof deck, install nfpa 13 fire sprinkler system. | $45,000 |
| Mar 15, 2018 | Never finaled issued Aug 2023, no final | 2450 20th Av | G B U Construction Development, Ot Bay Builders Inc., H & Bo Construction Inc. | comply w/ nov# 201755441 to remove north bedrm & bath @ 1st fl; remove temp partition wall & closet on 2nd fl; legalize partition wall in 2nd fl bathrm ; change doors orientation on 2nd fl; excavate foundation for legalizing 1st fl 468sf unit w/ 1 bedrm, 1 kitchen & 1 bath per ord# 43-14.Details
comply w/ nov# 201755441 to remove north bedrm & bath @ 1st fl; remove temp partition wall & closet on 2nd fl; legalize partition wall in 2nd fl bathrm ; change doors orientation on 2nd fl; excavate foundation for legalizing 1st fl 468sf unit w/ 1 bedrm, 1 kitchen & 1 bath per ord# 43-14. | $93,850 |
| Jan 26, 2018 | Never finaled issued Sep 2021, no final | 61 Pleasant St | G B U Construction Development | vertical addition of 1-story over (e) garage into a (1) bedroom, (1) bathroom unit. remodel of (e) garage. new design-build fire sprinkler system per nfpa-13r under separate permit.Details
vertical addition of 1-story over (e) garage into a (1) bedroom, (1) bathroom unit. remodel of (e) garage. new design-build fire sprinkler system per nfpa-13r under separate permit. | $89,195 |
| Jan 26, 2018 | Never finaled issued Sep 2021, no final | 1260 Sacramento St | G B U Construction Development | renovate (e) 2-story single family residence. interior remodel of (e). vertical addition of 3rd flr & roof deck. (n) design-build fire sprinkler system per nfpa-13r under separate permit.Details
renovate (e) 2-story single family residence. interior remodel of (e). vertical addition of 3rd flr & roof deck. (n) design-build fire sprinkler system per nfpa-13r under separate permit. | $732,955 |
| Aug 7, 2015 | Completed final sign-off Aug 2021 | 943 York St | G B U Construction Development | 2 story addition (2nd unit)2800 sf. 3rd level=1380 sf, 4th level 1420 sf. 6 bedrooms. deck & stairs. (200 sf). roof deck 420 sf with 13r sprinkler system throughout entire bldg. new entry and interior stairs.Details
2 story addition (2nd unit)2800 sf. 3rd level=1380 sf, 4th level 1420 sf. 6 bedrooms. deck & stairs. (200 sf). roof deck 420 sf with 13r sprinkler system throughout entire bldg. new entry and interior stairs. | $200,000 |