Luis Rodriguez
- Listed as
- architect, engineer
- Firm
- Innovative Design
- On San Francisco permits
- Jul 2017 to Jun 2026
24 permits since 2000 (engineer on 21 permits, architect on 3 permits): 14 completed, 2 in progress, 3 never finaled, 5 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 17, 2026 | In progress issued Jun 2026 | 1716 Baker St | Xp Construction Llc. | replace door system at rear, kitchen wall with cabana doors upgrade shear.Details
replace door system at rear, kitchen wall with cabana doors upgrade shear. | $32,000 |
| Aug 22, 2025 | Completed final sign-off Oct 2025 | 73 Fountain St | revision to pa2020-0113-1721 installed hardy boards instead of hardy shingles on front elevation; installed horizontal railing instead of vertical; changed the arch on top of front porch. want the plans to reflect the changes in the railings and shinglesDetails
revision to pa2020-0113-1721 installed hardy boards instead of hardy shingles on front elevation; installed horizontal railing instead of vertical; changed the arch on top of front porch. want the plans to reflect the changes in the railings and shingles | $1,000 | |
| Feb 29, 2024 | Completed final sign-off Oct 2025 | 73 Fountain St | Sdmi Construction | rev to #202401103751, which was a revision to 202001031721. new office superseding partial deck on ground floor, add 2 lights, 4 outlets in office and 1 register can.Details
rev to #202401103751, which was a revision to 202001031721. new office superseding partial deck on ground floor, add 2 lights, 4 outlets in office and 1 register can. | $1,500 |
| Nov 3, 2023 | In progress issued May 2025 | 339 Faxon Av | Ibr Construction Inc, Bilan Construction Inc | convert 1st story basement to finished space. full 2nd story remodel.structural strengthening.addition of 250sqft to back of hosue w/deck above for master bedroomDetails
convert 1st story basement to finished space. full 2nd story remodel.structural strengthening.addition of 250sqft to back of hosue w/deck above for master bedroom | $40,000 |
| Apr 4, 2023 | Completed final sign-off Aug 2025 | 76 Dorado Tr | Ibr Construction Inc | kitchen remodel- remove kitchen walls, new kitchen island, new sink, new appliancesDetails
kitchen remodel- remove kitchen walls, new kitchen island, new sink, new appliances | $50,000 |
| Oct 24, 2022 | Completed final sign-off Aug 2025 | 2591 25th Av | Sky Home Builders Inc, Yao Star Construction | rev to pa# 2017-0710-1367. increase scope of foundation replacement. update simpson strongwall along grid d.Details
rev to pa# 2017-0710-1367. increase scope of foundation replacement. update simpson strongwall along grid d. | $40,000 |
| Jun 17, 2022 | Never finaled filed Jun 2022, never issued | 1012 Shrader St | Remodeling Heroes Inc. | remove (e) chimney. (n) code compliant stairs at 3rd flr to 4th flr at rear. (n) dormers at 4th flr. convert (e) attic to habitable conditioned space. (n) vert addition. (n) deck at roof.Details
remove (e) chimney. (n) code compliant stairs at 3rd flr to 4th flr at rear. (n) dormers at 4th flr. convert (e) attic to habitable conditioned space. (n) vert addition. (n) deck at roof. | $70,000 |
| Apr 25, 2022 | Completed final sign-off Nov 2022 | 672 Carolina St | Golden Heights Remodeling Inc | kitchen remodeling per plans, remove non-bearing wall, replace new appliances, new island, update mep up to code, new dryer/washer at kitchen, new hood.Details
kitchen remodeling per plans, remove non-bearing wall, replace new appliances, new island, update mep up to code, new dryer/washer at kitchen, new hood. | $25,000 |
| Apr 28, 2021 | Completed final sign-off Jan 2022 | 264 Dalewood Wy | Remodeling Heroes Inc. | bearing wall removal and kitchen remodel. existing chimney removal and new 2 sided chimney installation. new gas fireplace.Details
bearing wall removal and kitchen remodel. existing chimney removal and new 2 sided chimney installation. new gas fireplace. | $45,000 |
| Apr 28, 2021 | Expired or cancelled cancelled Feb 2024 | 2329 Laguna St | create new roof deck. create new deck at 2nd floor.Details
create new roof deck. create new deck at 2nd floor. | $35,000 | |
| Apr 2, 2021 | Completed final sign-off Jul 2021 | 10 Cerritos Av | Remodeling Heroes Inc. | install new roof hatchDetails
install new roof hatch | $8,000 |
| Mar 18, 2021 | Expired or cancelled cancelled Jan 2026 | 888 Darien Wy | Prosper Construction Dev Inc. | revision to pa# 201910174865. includes (n) side walkway for 1st fl & 1-hr fire rated guardrail. kitchen skylight call out removed (kitchen skylight will remain). add door on 2nd fl closet by (e) bathroom. updated 1st fl layout as per as-built conditions.Details
revision to pa# 201910174865. includes (n) side walkway for 1st fl & 1-hr fire rated guardrail. kitchen skylight call out removed (kitchen skylight will remain). add door on 2nd fl closet by (e) bathroom. updated 1st fl layout as per as-built conditions. | $15,000 |
| Nov 4, 2020 | Never finaled issued Jan 2021, no final | 2718 Bryant St | Remodeling Heroes Inc. | convert (e) office to full bathroom incl shower. no structural work.Details
convert (e) office to full bathroom incl shower. no structural work. | $18,000 |
| Jul 21, 2020 | Expired or cancelled withdrawn Jul 2022 | 2300 Leavenworth St | to comply with complaint 202014261. construct (n) deck, 430 sfDetails
to comply with complaint 202014261. construct (n) deck, 430 sf | $5,000 | |
| Feb 11, 2020 | Never finaled issued Feb 2020, no final | 40 Niantic Av | new slab at front of house (bedroom #3 & kitchen). change existing front windows to soundproofing windows, same design and material, new bathroom & repair bldg raise floor, laundry room.Details
new slab at front of house (bedroom #3 & kitchen). change existing front windows to soundproofing windows, same design and material, new bathroom & repair bldg raise floor, laundry room. | $35,000 | |
| Dec 31, 2019 | Completed final sign-off Apr 2021 | 127 Valdez Av | Winder Construction Inc. | add a deck in the back yard, 8'6"high, 175 sqsf, 4 ft from side property.Details
add a deck in the back yard, 8'6"high, 175 sqsf, 4 ft from side property. | $3,000 |
| Nov 7, 2019 | Expired or cancelled expired Mar 2025 | 849 Mason St | Mazzola Construction | unit #3: replace existing deck with new floating deck at patio area in kindDetails
unit #3: replace existing deck with new floating deck at patio area in kind | $30,000 |
| Oct 10, 2019 | Completed final sign-off Jan 2020 | 572 Dewey Bl | Bay Build Design Inc | voluntary seismic retrofit at garage level shearwalls and holddowns.Details
voluntary seismic retrofit at garage level shearwalls and holddowns. | $30,000 |
| Sep 6, 2019 | Expired or cancelled cancelled Jan 2026 | 767 Cayuga Av | revision to app#201812178493. new skylight. new location for wet bar. new water line 1". tankless water heater. new location for electrical meter.Details
revision to app#201812178493. new skylight. new location for wet bar. new water line 1". tankless water heater. new location for electrical meter. | $5,000 | |
| Jul 2, 2019 | Completed final sign-off Jan 2020 | 608 Haight St | G B U Construction Development | kitchen remodel, like for like, rebrasting the fridge, sink and washer dryer. decrease kitchen window sizeDetails
kitchen remodel, like for like, rebrasting the fridge, sink and washer dryer. decrease kitchen window size | $15,000 |
| May 1, 2019 | Completed final sign-off Dec 2019 | 2130 Harrison St | S & I Construction, Inc | remodel 1st fl bathroom. remodel and increase size of mezzanine bathroom.Details
remodel 1st fl bathroom. remodel and increase size of mezzanine bathroom. | $35,000 |
| Mar 21, 2019 | Completed final sign-off Jan 2021 | 516 Dwight St | Green Sequoia Construction Group Inc | sagging support beam replacement in kitchen. ref to #201902132855 for interior work.Details
sagging support beam replacement in kitchen. ref to #201902132855 for interior work. | $10,000 |
| Feb 13, 2019 | Completed final sign-off Jan 2021 | 516 Dwight St | Green Sequoia Construction Group Inc | 2 bathrooms remodel: one kitchen remodel and adding a bathroom. adding gas meter.Details
2 bathrooms remodel: one kitchen remodel and adding a bathroom. adding gas meter. | $100,000 |
| Jul 10, 2017 | Completed final sign-off Aug 2025 | 2591 25th Av | Sky Home Builders Inc, Yao Star Construction | vertical 3rd story additio with two bathrooms.Details
vertical 3rd story additio with two bathrooms. | $120,000 |