Curtis Hollenbeck
- Listed as
- architect, authorized agent-others, designer, engineer, pmt consultant/expediter
- Firm
- Curtis Hollenbeck Architect
- Based in
- San Francisco
- On San Francisco permits
- Jun 2004 to Oct 2026
322 permits since 2000 (architect on 307 permits, authorized agent-others on 16 permits, engineer on 4 permits, designer on 1 permit, pmt consultant/expediter on 1 permit): 230 completed, 22 in progress, 37 never finaled, 33 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 322.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 6, 2026 | In progress filed Oct 2026, not yet issued | 1413 Golden Gate Av | 3/fl- unit 1413- convert (e) closet to bathroom. (no exterior changes or structrual)Details
3/fl- unit 1413- convert (e) closet to bathroom. (no exterior changes or structrual) | $16,000 | |
| Sep 10, 2026 | In progress filed Sep 2026, not yet issued | 2238 Webster St | approved prj2026-001729 prj.fl1:create habitable area behind garage/rec room,bath & interior connecting stair to floor 2. addition @ side yard & infill.widen garage door & foundation & replacement.fl2: alter powder room & open area under stair. subject to ab-112.Details
approved prj2026-001729 prj.fl1:create habitable area behind garage/rec room,bath & interior connecting stair to floor 2. addition @ side yard & infill.widen garage door & foundation & replacement.fl2: alter powder room & open area under stair. subject to ab-112. | $250,000 | |
| Sep 2, 2026 | In progress filed Sep 2026, not yet issued | 3948 26th St | Ashbury Gen Constructing & Eng | floor 1: relocate unit 1 from floor 2 to currently non-habitable floor 1. unit1: 3 bedroom, 3 bath, powder, kitchen, living, dining & study. floor 2: expand floor 2 into previous occupied unit 1. renovate kitchen, living, dining, 4-bathrooms.Details
floor 1: relocate unit 1 from floor 2 to currently non-habitable floor 1. unit1: 3 bedroom, 3 bath, powder, kitchen, living, dining & study. floor 2: expand floor 2 into previous occupied unit 1. renovate kitchen, living, dining, 4-bathrooms. | $250,000 |
| Aug 13, 2026 | In progress issued Aug 2026 | 3009 Mission St | to comply with nov#202660685: repair damaged sheetrock with 5/8in type x gyp board. fire damage repair. work in lobby area and opposite side of wall.Details
to comply with nov#202660685: repair damaged sheetrock with 5/8in type x gyp board. fire damage repair. work in lobby area and opposite side of wall. | $8,000 | |
| Aug 5, 2026 | In progress issued Sep 2026 | 3751 21st St | Perez Construction Llc. | revision to pa 202212168564 alter exterior finish materials is facades (no volume or structural changes)Details
revision to pa 202212168564 alter exterior finish materials is facades (no volume or structural changes) | |
| Jun 2, 2026 | In progress filed Jun 2026, not yet issued | 3950 Clay St | floor 1, renovate (e) gameroom, utility and bathroom. add powder room (no exterior work).Details
floor 1, renovate (e) gameroom, utility and bathroom. add powder room (no exterior work). | $65,000 | |
| Apr 21, 2026 | In progress filed Apr 2026, not yet issued | 2418 Van Ness Av | fl:1 - legalize (e) studio apartment unit 12 (adu to be legalize under state adu program)Details
fl:1 - legalize (e) studio apartment unit 12 (adu to be legalize under state adu program) | ||
| Feb 19, 2026 | In progress issued Feb 2026 | 1420 Valencia St | apt 1, 3 & 4 convert (e) kitchen to bedroom, relocate kitchen in living/dining room; add washer/dryer to each unit; apt 2 - provide plumbed wall for future kitchen relocation. (no structural or exterior changes)Details
apt 1, 3 & 4 convert (e) kitchen to bedroom, relocate kitchen in living/dining room; add washer/dryer to each unit; apt 2 - provide plumbed wall for future kitchen relocation. (no structural or exterior changes) | $40,000 | |
| Dec 19, 2025 | Completed final sign-off Jun 2026 | 2 05th Av | Eastwood Development Incorporated | replace portion of side brick retaining wall in like kind.Details
replace portion of side brick retaining wall in like kind. | $12,000 |
| Dec 16, 2025 | Completed final sign-off Feb 2026 | 2501 29th Av | replace (e) rear deck in-like kind. original deck permitted under ref 384641 & 346265Details
replace (e) rear deck in-like kind. original deck permitted under ref 384641 & 346265 | $12,000 | |
| Nov 7, 2025 | Completed final sign-off May 2026 | 214 Texas St | obtain a permit with plans and planning apporval to address violation. electrical and plumbing permit are required. obtain all required inspections to abate nov. permits must state to comply wiht nov 202534308. floor 1: legalize auxiliary kitchen including counter, sink and 18" cooktop.Details
obtain a permit with plans and planning apporval to address violation. electrical and plumbing permit are required. obtain all required inspections to abate nov. permits must state to comply wiht nov 202534308. floor 1: legalize auxiliary kitchen including counter, sink and 18" cooktop. | $2,000 | |
| Jul 30, 2025 | In progress filed Jul 2025, not yet issued | 649 Fillmore St | floor '4': convert attic to habitable area to unit 649. add interior connecting stair. create bedroom, (2) baths, family room and utility. create dormers utilizing za bulletin no. 3Details
floor '4': convert attic to habitable area to unit 649. add interior connecting stair. create bedroom, (2) baths, family room and utility. create dormers utilizing za bulletin no. 3 | $200,000 | |
| Jul 28, 2025 | In progress issued Jul 2025 | 21 18th Av | 7 Hills Construction | interior renovations only- non structural (no exterior changes). 2nd floor: remodel kitchen and powder room. 3rd floor: renovate 2 bathrooms and add w/d. divide bedroom. 4th floor: renovate primary bedroom, bath and powder.Details
interior renovations only- non structural (no exterior changes). 2nd floor: remodel kitchen and powder room. 3rd floor: renovate 2 bathrooms and add w/d. divide bedroom. 4th floor: renovate primary bedroom, bath and powder. | $110,000 |
| Jul 16, 2025 | In progress filed Jul 2025, not yet issued | 3733 22nd St | Eastwood Development Incorporated | create roof deck @ rear built up roof off bedroomDetails
create roof deck @ rear built up roof off bedroom | $12,500 |
| Jul 2, 2025 | In progress issued Jan 2026 | 280 Chattanooga St | unit #280 fl 2: renovate kitchen, reconfigure/relocate powder room & bathroom to 2 full bathrooms. (interior remodel / no visible exterior changes from street)Details
unit #280 fl 2: renovate kitchen, reconfigure/relocate powder room & bathroom to 2 full bathrooms. (interior remodel / no visible exterior changes from street) | $65,000 | |
| Jun 9, 2025 | Completed final sign-off Sep 2026 | 269 Hartford St | Wooley Landscapes | rear yard: reconfigure rear yard terraces/site retaininhg walls. add fire pit, outdoor kitchen. strengthen garage roofDetails
rear yard: reconfigure rear yard terraces/site retaininhg walls. add fire pit, outdoor kitchen. strengthen garage roof | $35,000 |
| Mar 27, 2025 | Completed final sign-off Apr 2025 | 2224 Jackson St | address cp complaint 2022011816 enf. 1st/f: permit front window clazing replaced at e) winodw w/o a building permit. replaced 10 damaed panes. 2nd/f: document 1 (e) window removed & cementitious siding on front facade removed & e) redwood siding underneath restored/ paintedDetails
address cp complaint 2022011816 enf. 1st/f: permit front window clazing replaced at e) winodw w/o a building permit. replaced 10 damaed panes. 2nd/f: document 1 (e) window removed & cementitious siding on front facade removed & e) redwood siding underneath restored/ painted | $7,500 | |
| Mar 12, 2025 | In progress filed Mar 2025, not yet issued | 62 Jordan Av | replace (e) exterior front entry steps in-like kind + 3'0' landingDetails
replace (e) exterior front entry steps in-like kind + 3'0' landing | $16,000 | |
| Mar 11, 2025 | Completed final sign-off Sep 2025 | 938 Sanchez St | Rosemount Construction | revision 202112224931- remove closet bulk at north side of building on 3rd floor (mass reduction of 19sqft)Details
revision 202112224931- remove closet bulk at north side of building on 3rd floor (mass reduction of 19sqft) | |
| Feb 24, 2025 | In progress issued Jun 2025 | 1946 California St | Eastwood Development Incorporated | revision to 202104138442 & 202202178260. 1/f: replace int. brick entry/steps w/ hardwood. add vestibule door. 2/f: add bay window. modify bathrooms & closet layout. relocate fireplace. 3/f: add bay window. modify closet. 4/f: add 1 bath, wetbar, closet, remove (e)bath. seismic retrofit entire bldgDetails
revision to 202104138442 & 202202178260. 1/f: replace int. brick entry/steps w/ hardwood. add vestibule door. 2/f: add bay window. modify bathrooms & closet layout. relocate fireplace. 3/f: add bay window. modify closet. 4/f: add 1 bath, wetbar, closet, remove (e)bath. seismic retrofit entire bldg | $50,000 |
| Feb 19, 2025 | In progress issued Mar 2025 | 1427 39th Av | revision to permit # 2024-1112-4783. floor 1: convert portion of garage to habitable arae. reconstruct interior connecting stair. add deck @ rear < 30" above grade. replace front windows w/ aliminum windows.Details
revision to permit # 2024-1112-4783. floor 1: convert portion of garage to habitable arae. reconstruct interior connecting stair. add deck @ rear < 30" above grade. replace front windows w/ aliminum windows. | $110,000 | |
| Jan 7, 2025 | Expired or cancelled expired Apr 2026 | 10 05th Av | Eastwood Development Incorporated | revisino 202010156567- revise t-24 report provide radiant heating in lieu of heat pumpsDetails
revisino 202010156567- revise t-24 report provide radiant heating in lieu of heat pumps | |
| Jan 7, 2025 | In progress issued Jan 2025 | 1740 Kearny St | create koi pond at patio.Details
create koi pond at patio. | $30,000 | |
| Nov 19, 2024 | Completed final sign-off Jul 2025 | 3733 22nd St | Eastwood Development Incorporated | pull back (e) permitted rear stair at deck. (e) fire sall to remain for length of stair.Details
pull back (e) permitted rear stair at deck. (e) fire sall to remain for length of stair. | $5,000 |
| Nov 14, 2024 | Completed final sign-off Oct 2025 | 224 Juanita Wy | floor 3- remodel kitchen open to dining remodel bathroom and add bath. no exterior changes. no additional sfDetails
floor 3- remodel kitchen open to dining remodel bathroom and add bath. no exterior changes. no additional sf | $45,000 | |
| Nov 12, 2024 | In progress issued Nov 2024 | 1427 39th Av | 2nd floor remodel of kitchen and bathroom. add master bathroom . no exterior work or structural work.Details
2nd floor remodel of kitchen and bathroom. add master bathroom . no exterior work or structural work. | $40,000 | |
| Nov 5, 2024 | Completed final sign-off Jan 2026 | 2046 48th Av | Kingfish Construction Llc. | 1st flr renovate floor 1, utilize portion of garage for excercise/utility room. create 2 bedrooms and bath. reconfifure rear deck (<10' tall).Details
1st flr renovate floor 1, utilize portion of garage for excercise/utility room. create 2 bedrooms and bath. reconfifure rear deck (<10' tall). | $40,000 |
| Oct 1, 2024 | Completed final sign-off Oct 2024 | 3748 22nd St | Eastwood Development Incorporated | rev to pa# 2024-0408-9558; rear exterior steps clad (e) legal non complying concrete steps on grade w/redwoodDetails
rev to pa# 2024-0408-9558; rear exterior steps clad (e) legal non complying concrete steps on grade w/redwood | $1,000 |
| Jul 22, 2024 | Completed final sign-off Apr 2025 | 4351 17th St | Hawke Construction | floor 3: replace (e) windows at rear utility room. renovate (e) bathroom: replace toilet, vanity, shower, led light, fan & gfci outlet.Details
floor 3: replace (e) windows at rear utility room. renovate (e) bathroom: replace toilet, vanity, shower, led light, fan & gfci outlet. | $12,000 |
| May 9, 2024 | Expired or cancelled expired Apr 2026 | 10 05th Av | Eastwood Development Incorporated | revision to permit 202010156567. 3/f: convert proposed bathroom to powder room. add wet bar. add bathroom.Details
revision to permit 202010156567. 3/f: convert proposed bathroom to powder room. add wet bar. add bathroom. | $10,000 |
| Apr 25, 2024 | Completed final sign-off Nov 2024 | 120 Elsie St | Hoang General Construction | 2nd/f renovation of e) primary bedroom & bath (no exteriro work, no structural) 2nd/f area of remodel 375 sfDetails
2nd/f renovation of e) primary bedroom & bath (no exteriro work, no structural) 2nd/f area of remodel 375 sf | $22,000 |
| Apr 8, 2024 | Completed final sign-off Oct 2024 | 3748 22nd St | Eastwood Development Incorporated | to comply w/ nov# 202294137 items# 1,2,3,4,5,6,7: 1/f - remodel (e) bath and kitchen. 2/f - remodel (e) bathroom and add washer/dryer.Details
to comply w/ nov# 202294137 items# 1,2,3,4,5,6,7: 1/f - remodel (e) bath and kitchen. 2/f - remodel (e) bathroom and add washer/dryer. | $45,000 |
| Mar 19, 2024 | Completed final sign-off Sep 2025 | 938 Sanchez St | Rosemount Construction | revision to permit app# 202112224931: edit demolition plans to show location of hardi panels installation. cut back (e) deck.Details
revision to permit app# 202112224931: edit demolition plans to show location of hardi panels installation. cut back (e) deck. | $1,200 |
| Mar 14, 2024 | Completed final sign-off Feb 2025 | 64 Crags Ct | Baldenebro Construction | replace hardwood floors throughout. relocate washer & dryer to kitchen. alter bedroom hallway. skim coat plaster walls. provde fire rated sheet rock at garage. upgrade electrical lighting and outletsDetails
replace hardwood floors throughout. relocate washer & dryer to kitchen. alter bedroom hallway. skim coat plaster walls. provde fire rated sheet rock at garage. upgrade electrical lighting and outlets | $30,000 |
| Mar 8, 2024 | Completed final sign-off Jun 2024 | 4000 Moraga St | to comply with nov 202316678. 1/f: legalize habitable area: bedroom, bathroom and utility room. 2/f: legalize kitchen window replacement. rear yard/exterior: remove non-complying shed and relocate mechanical heat pumps.Details
to comply with nov 202316678. 1/f: legalize habitable area: bedroom, bathroom and utility room. 2/f: legalize kitchen window replacement. rear yard/exterior: remove non-complying shed and relocate mechanical heat pumps. | $40,000 | |
| Jan 25, 2024 | Expired or cancelled expired Apr 2026 | 10 05th Av | Eastwood Development Incorporated | revision to 202010156567. replace (e) 1x8 substrate w/structural plywd under previously approved cedar shakes and water proof membrane being replaced at north, south & west elevations (front & sides).Details
revision to 202010156567. replace (e) 1x8 substrate w/structural plywd under previously approved cedar shakes and water proof membrane being replaced at north, south & west elevations (front & sides). | $8,000 |
| Nov 27, 2023 | Expired or cancelled withdrawn Apr 2024 | 3737 22nd St | revision to bpa#202102205050.infill garage corner to widen garage door.Details
revision to bpa#202102205050.infill garage corner to widen garage door. | $8,500 | |
| Nov 7, 2023 | Completed final sign-off Jul 2025 | 3737 22nd St | Eastwood Development Incorporated | revision to 202102205050 restore (e) front facade. ref 202303304768 to rearrage layout of sauna, wet rm, bath & wine rm. structural revision per plan.Details
revision to 202102205050 restore (e) front facade. ref 202303304768 to rearrage layout of sauna, wet rm, bath & wine rm. structural revision per plan. | |
| Aug 21, 2023 | Completed final sign-off Jul 2025 | 3737 22nd St | Eastwood Development Incorporated | revision to pa# 202102205050, modify grade @ rear yard, <3'0"fill, replace existing rear site retaining.Details
revision to pa# 202102205050, modify grade @ rear yard, <3'0"fill, replace existing rear site retaining. | $8,000 |
| Jul 31, 2023 | Never finaled issued Aug 2023, no final | 1 Loma Vista Tr | Bergquist Builders | revision to pa# 202212017478. basement: create habitable area with rec room & bath. floor 1: alternate fireplace location. floor 2: delete 1 proposed window. replace (e) wood windows in-like kind & operation (wood).Details
revision to pa# 202212017478. basement: create habitable area with rec room & bath. floor 1: alternate fireplace location. floor 2: delete 1 proposed window. replace (e) wood windows in-like kind & operation (wood). | $125,000 |
| Jul 14, 2023 | Expired or cancelled expired Mar 2026 | 448 Valley St | Eastwood Development Incorporated | revision to 201712186765. alter rear site retaining walls/rear patio, provide walkway @ fl 2 to rear yard (below e grade)Details
revision to 201712186765. alter rear site retaining walls/rear patio, provide walkway @ fl 2 to rear yard (below e grade) | |
| Jun 13, 2023 | Completed final sign-off Aug 2023 | 8320 Geary Bl | Towey Construction Inc. | address complaint 2022-00671enf (revision to 202007029521) revise table 317 demo calcs (as built plans revise esat & west building elevation, delete windows and skylights)Details
address complaint 2022-00671enf (revision to 202007029521) revise table 317 demo calcs (as built plans revise esat & west building elevation, delete windows and skylights) | |
| May 31, 2023 | Completed final sign-off Jan 2024 | 709 Shotwell St | floor 2: add powder room. add floor 3: add bathroom w skylightDetails
floor 2: add powder room. add floor 3: add bathroom w skylight | $25,000 | |
| May 8, 2023 | Never finaled issued Jun 2023, no final | 3533 21st St | San Francisco Terrazzo Inc | replace (7) of (7) terrazzo front exterior steps in-like kindDetails
replace (7) of (7) terrazzo front exterior steps in-like kind | $5,000 |
| Mar 30, 2023 | Completed final sign-off Jul 2025 | 3737 22nd St | Eastwood Development Incorporated | revision to pa# 202102205050, additional excavation/foundation replacement @ approved recreation room, reconfigure proposed bath/wine room (no exterior changes)Details
revision to pa# 202102205050, additional excavation/foundation replacement @ approved recreation room, reconfigure proposed bath/wine room (no exterior changes) | $25,000 |
| Mar 27, 2023 | Completed final sign-off Mar 2023 | 1927 Washington St | Keightley Builders Inc | revision to 202109239002. document as-built kitchens all 3 units for final inspection. (kitchen island revised); 4th floor unit: alter bath & kitchen layoutDetails
revision to 202109239002. document as-built kitchens all 3 units for final inspection. (kitchen island revised); 4th floor unit: alter bath & kitchen layout | |
| Feb 24, 2023 | Completed final sign-off Jun 2023 | 1150 Sacramento St | Nob Hill Construction | unit 701, revision to pa 2001-0416-6900 as builts provided reconfigure bath/powder room/closetsDetails
unit 701, revision to pa 2001-0416-6900 as builts provided reconfigure bath/powder room/closets | |
| Dec 16, 2022 | In progress issued Jul 2024 | 3751 21st St | Perez Construction Llc., Eastwood Development Incorporated | altered site permit to pa # 2019-0801-7583 s. includes complete scope of original site permit with the following changes: relabel proposed floor levels as 1st thru 4th floors. extend the proposed 4th floor northward to align with adjacent neighbors proposed addition (under pa# 202208212328)Details
altered site permit to pa # 2019-0801-7583 s. includes complete scope of original site permit with the following changes: relabel proposed floor levels as 1st thru 4th floors. extend the proposed 4th floor northward to align with adjacent neighbors proposed addition (under pa# 202208212328) | $100,000 |
| Dec 1, 2022 | Never finaled issued Dec 2022, no final | 1 Loma Vista Tr | Bergquist Builders | 1st fl: remodel kitchen, living, dining. create powder room. new doors to (e) deck. add gas fire place. 2nd fl: remodel (e) bathroom. create 2nd bath & utility room.Details
1st fl: remodel kitchen, living, dining. create powder room. new doors to (e) deck. add gas fire place. 2nd fl: remodel (e) bathroom. create 2nd bath & utility room. | $160,000 |
| Nov 8, 2022 | Completed final sign-off Aug 2023 | 8320 Geary Bl | Towey Construction Inc. | revision to permit 202007029521. replace (e) front exterior stair in kind (within property)Details
revision to permit 202007029521. replace (e) front exterior stair in kind (within property) | $10,000 |
| Oct 18, 2022 | Completed final sign-off Oct 2023 | 1763 20th Av | revision to pa#202007170364: add skylight at stair greater then 5'-0" off property line. remodel extg bathroom at floor. sheets submitted with ref ao.1,ec1.1, ec2.1, ec2.2, a2.0, a2.2,a8.1, s2.0,s2.1,s.5.0,s8.3Details
revision to pa#202007170364: add skylight at stair greater then 5'-0" off property line. remodel extg bathroom at floor. sheets submitted with ref ao.1,ec1.1, ec2.1, ec2.2, a2.0, a2.2,a8.1, s2.0,s2.1,s.5.0,s8.3 | $8,000 | |
| Sep 26, 2022 | Never finaled issued Jul 2023, no final | 171 Precita Av | Eastwood Development Incorporated | rev to pa 201905140610. basement: create wet bar @ recreation room.Details
rev to pa 201905140610. basement: create wet bar @ recreation room. | $2,000 |
| Aug 5, 2022 | Completed final sign-off Sep 2023 | 1434 Guerrero St | Tracy Anthony General Contractor | 2/f: remodel bathroom. add shower to (e) powder room.Details
2/f: remodel bathroom. add shower to (e) powder room. | $22,000 |
| Aug 3, 2022 | In progress issued Nov 2025 | 3751 21st St | Perez Construction Llc. | add adu to (e) approved site permit app #2019-0801-7583.Details
add adu to (e) approved site permit app #2019-0801-7583. | $250,000 |
| Jul 26, 2022 | Completed final sign-off May 2023 | 3044 Pine St | fl 1: patial foundation & garage slab replacement.Details
fl 1: patial foundation & garage slab replacement. | $40,000 | |
| Jul 21, 2022 | Never finaled filed Jul 2022, never issued | 3748 22nd St | Eastwood Development Incorporated | renovate(e)single family & horizontal additional @ rear,add 2nd unit(adu).baement:enlarge garage,add elevator & interior connecting stair to floors above.fl1:create habitable area,n/ adu. flr:2:renovate kitchen,living room,powder room.fl 3:renovate bedrooms,baths,primary bedroom bath & washer/dryer.Details
renovate(e)single family & horizontal additional @ rear,add 2nd unit(adu).baement:enlarge garage,add elevator & interior connecting stair to floors above.fl1:create habitable area,n/ adu. flr:2:renovate kitchen,living room,powder room.fl 3:renovate bedrooms,baths,primary bedroom bath & washer/dryer. | $750,000 |
| Jun 7, 2022 | Completed final sign-off Jan 2023 | 2224 25th St | 3rd fl: add bathroom to existing bedroom. install new skylight.Details
3rd fl: add bathroom to existing bedroom. install new skylight. | $15,000 | |
| Jun 6, 2022 | Completed final sign-off Jul 2022 | 226 Powell St | revision to pa #202110251077. delete elevator upgrades and break room front scope of work. extg elevator ada compliant, break room under future t.i.Details
revision to pa #202110251077. delete elevator upgrades and break room front scope of work. extg elevator ada compliant, break room under future t.i. | ||
| May 19, 2022 | Completed final sign-off Oct 2023 | 1763 20th Av | Opus Pacific Development | revision to pa# 202007170364. basement add secondary kitchen to rec room. 2nd fl change 2 fron windows to fiberglass.Details
revision to pa# 202007170364. basement add secondary kitchen to rec room. 2nd fl change 2 fron windows to fiberglass. | $4,000 |
| May 3, 2022 | Completed final sign-off May 2024 | 2400 Pacheco St | Hunter Dale Builders Inc. | floor 1: create additional habitable area, (2) bedrms, bath, utility, reconstruct stair to flr 2 and maintain garage. flr 2: remodel kitchen/living/dining, (2) bedrms, bath & powder rm. add cantilevered balcony.Details
floor 1: create additional habitable area, (2) bedrms, bath, utility, reconstruct stair to flr 2 and maintain garage. flr 2: remodel kitchen/living/dining, (2) bedrms, bath & powder rm. add cantilevered balcony. | $165,000 |
| Apr 6, 2022 | Completed final sign-off Jun 2023 | 338 Main St | Heirloom Builders Inc | unit 3g: replace kitchen island & counter tops. replace bath counter. add electric ventless fire place. add soffit for recessed lighting. no exterior changes. no structural.Details
unit 3g: replace kitchen island & counter tops. replace bath counter. add electric ventless fire place. add soffit for recessed lighting. no exterior changes. no structural. | $22,000 |
| Apr 6, 2022 | Completed final sign-off Aug 2023 | 232 Downey St | Rosemount Construction | revision to pa# 202112013449. flr '3': create roof deck at rear off bedroom (unit 234).Details
revision to pa# 202112013449. flr '3': create roof deck at rear off bedroom (unit 234). | $12,000 |
| Feb 23, 2022 | Completed final sign-off Aug 2023 | 232 Downey St | Rosemount Construction | revision pa# 202112013449, 202101186164. fl 1: add garage door, convert proposed storage to garage.Details
revision pa# 202112013449, 202101186164. fl 1: add garage door, convert proposed storage to garage. | $12,000 |
| Feb 17, 2022 | Never finaled issued Nov 2022, no final | 1946 California St | revision to issued permit#202104138442. extend elevator to flr"4" for unit accessibility.add solar thrells over rear roof deck @ flr"4".Details
revision to issued permit#202104138442. extend elevator to flr"4" for unit accessibility.add solar thrells over rear roof deck @ flr"4". | $30,000 | |
| Feb 4, 2022 | Completed final sign-off Dec 2024 | 1626 31st Av | G B U Construction Development | 1st floor: remodel extg bathroom. create addition habitable area behind garage. create deck at rear yard non (311). 2nd floor: add sink to extg powder room. remove portion of wall between eating and kitchen.Details
1st floor: remodel extg bathroom. create addition habitable area behind garage. create deck at rear yard non (311). 2nd floor: add sink to extg powder room. remove portion of wall between eating and kitchen. | $22,000 |
| Jan 18, 2022 | Completed final sign-off Jun 2022 | 1332 Portola Dr | comply with nov 202180223 & planning 2022-000574 enf. legalize kitchenette/wet bar. remove full size stoveDetails
comply with nov 202180223 & planning 2022-000574 enf. legalize kitchenette/wet bar. remove full size stove | $500 | |
| Jan 18, 2022 | Completed final sign-off Aug 2023 | 232 Downey St | Rosemount Construction | revision to bpa#202112013449, 1/f create habitable area, (2) bedrooms, (1) bath, storage, create interior connecting stair to 2/f; 4/f alter interior sloped ceiling walls to 5'0"Details
revision to bpa#202112013449, 1/f create habitable area, (2) bedrooms, (1) bath, storage, create interior connecting stair to 2/f; 4/f alter interior sloped ceiling walls to 5'0" | $150,000 |
| Jan 13, 2022 | Completed final sign-off May 2023 | 157 States St | Eastwood Development Incorporated | revision to permit app#201909171884: floor 1: lower portion of fextg lfoor joist/ edit demo calcs. no exterior changes.Details
revision to permit app#201909171884: floor 1: lower portion of fextg lfoor joist/ edit demo calcs. no exterior changes. | $12,000 |
| Dec 23, 2021 | Never finaled issued Jun 2022, no final | 226 Powell St | paint facade, remove canopy over fl 1 storefront, replace stone tile at fl 1 facade.Details
paint facade, remove canopy over fl 1 storefront, replace stone tile at fl 1 facade. | $20,000 | |
| Dec 1, 2021 | Completed final sign-off Sep 2023 | 232 Downey St | Rosemount Construction | renovate 2 unit bldg. unit 1: renovate kitchen/living/dining/bath & power room. unit 2: renovate kitchen/living/dining/bath & powder @ floor 3 & add powder & modify (e) dormer.add bath,renovate bedrooms replace front windows with all wood double hung with ogee.Details
renovate 2 unit bldg. unit 1: renovate kitchen/living/dining/bath & power room. unit 2: renovate kitchen/living/dining/bath & powder @ floor 3 & add powder & modify (e) dormer.add bath,renovate bedrooms replace front windows with all wood double hung with ogee. | $180,000 |
| Nov 29, 2021 | Completed final sign-off Mar 2023 | 1927 Washington St | Keightley Builders Inc | revision "1" to permit app 202109239002. create interior connecting stair from unit at flr '2' to flr '1'. create common habitable recreation rm (367 sf) & bath behind garage.Details
revision "1" to permit app 202109239002. create interior connecting stair from unit at flr '2' to flr '1'. create common habitable recreation rm (367 sf) & bath behind garage. | $30,000 |
| Nov 23, 2021 | Completed final sign-off Jul 2022 | 2224 Jackson St | Ashbury Gen Constructing & Eng | revision to 202110120320: unit 1 open up wall between kitchen and family dining. remodel powder, replace rear door. unit 2: remodel bath. unit 3: remodel kitchen and bathDetails
revision to 202110120320: unit 1 open up wall between kitchen and family dining. remodel powder, replace rear door. unit 2: remodel bath. unit 3: remodel kitchen and bath | $50,000 |
| Nov 15, 2021 | Completed final sign-off Nov 2022 | 119 02nd Av | Eastwood Development Incorporated | reconfigure bathroom & new door system at existing rear carriage house.Details
reconfigure bathroom & new door system at existing rear carriage house. | $25,000 |
| Oct 5, 2021 | Completed final sign-off Sep 2022 | 119 02nd Av | Eastwood Development Incorporated | floor 1: remodel primary bath and hall bath. new utility room. enlarge doors at rear. infill under 2nd floor at bedroom. floor 2: open up hall at kitchen, dining. enlarge doors at rear. floor 3: remodel bath.Details
floor 1: remodel primary bath and hall bath. new utility room. enlarge doors at rear. infill under 2nd floor at bedroom. floor 2: open up hall at kitchen, dining. enlarge doors at rear. floor 3: remodel bath. | $80,000 |
| Sep 23, 2021 | Completed final sign-off Mar 2023 | 1927 Washington St | Eastwood Development Incorporated | repair/replace in like kind fire damage to 3 unit building (fire 7/10/20) front elevations replace (e) vinyl windows with all wood windows. provide true divided lite and integral ogee @ dh windows.Details
repair/replace in like kind fire damage to 3 unit building (fire 7/10/20) front elevations replace (e) vinyl windows with all wood windows. provide true divided lite and integral ogee @ dh windows. | $450,000 |
| Sep 14, 2021 | Completed final sign-off Sep 2022 | 119 02nd Av | Eastwood Development Incorporated | 2/f: remodel (e) kitchen and powder room in kind. provide led lighting and gsci outlets.Details
2/f: remodel (e) kitchen and powder room in kind. provide led lighting and gsci outlets. | $22,000 |
| Sep 13, 2021 | Completed final sign-off Oct 2022 | 437 Hoffman Av | Hunter Dale Builders Inc. | remodel bathroom @ 3rd fl, add powder rm @ 2nd fl in (e) closet.Details
remodel bathroom @ 3rd fl, add powder rm @ 2nd fl in (e) closet. | $12,000 |
| Jul 9, 2021 | In progress issued Jan 2024 | 939 Lombard St | demolition of a type v, 1 story, carportDetails
demolition of a type v, 1 story, carport | $15,000 | |
| Jul 9, 2021 | In progress issued Jan 2024 | 939 Lombard St | to erect 4 stories, no basement, type v-b, single-dwelling unitDetails
to erect 4 stories, no basement, type v-b, single-dwelling unit | $750,000 | |
| May 28, 2021 | Completed final sign-off Apr 2023 | 268 Pixley St | 1/: enlarge sliding doors at rear outdoor bbq.2/f:renovate kitchen.replace stair guardrail.replace pwdr vanity,drop bay window seat to floor & englarge windows.3/f:replace new bath vanity.replace (e) metal windos throughout w/ alum clad wood windows.Details
1/: enlarge sliding doors at rear outdoor bbq.2/f:renovate kitchen.replace stair guardrail.replace pwdr vanity,drop bay window seat to floor & englarge windows.3/f:replace new bath vanity.replace (e) metal windos throughout w/ alum clad wood windows. | $85,000 | |
| May 28, 2021 | Completed final sign-off Apr 2023 | 457 Roosevelt Wy | Ashbury Gen Constructing & Eng | revision to pa 201708165047. remove 2 skylights plus alter 1 skylight.Details
revision to pa 201708165047. remove 2 skylights plus alter 1 skylight. | |
| May 20, 2021 | Completed final sign-off Apr 2022 | 2036 Scott St | Heirloom Builders Inc | add powder room in extg closet.Details
add powder room in extg closet. | $4,500 |
| May 11, 2021 | Completed final sign-off May 2023 | 157 States St | Eastwood Development Incorporated | revision to pa# 201909171884. basement add w/d. fl 1 cut in deck/notch to rear of bldg. fl 2 modify mm bath as nec with reduction in bldg volumeo/ fl 1 deck. remove cedar shakes at front & restore rdwd ship lap siding.Details
revision to pa# 201909171884. basement add w/d. fl 1 cut in deck/notch to rear of bldg. fl 2 modify mm bath as nec with reduction in bldg volumeo/ fl 1 deck. remove cedar shakes at front & restore rdwd ship lap siding. | |
| Apr 13, 2021 | Never finaled issued Jun 2021, no final | 1946 California St | 1/f: install elevator at (e) stairwell to flr 3 against neighboring blind hall. sound isolation at ceiling/1 hr. remodel bath and closet. 2/f: sound isolation at celing/1 hr. remodel kit, m-bath, bath, w/d and pwdr. 3/f: r/r rear landing/stair to grade. remodel kit, m-bath, bath, w/d, pwdr.Details
1/f: install elevator at (e) stairwell to flr 3 against neighboring blind hall. sound isolation at ceiling/1 hr. remodel bath and closet. 2/f: sound isolation at celing/1 hr. remodel kit, m-bath, bath, w/d and pwdr. 3/f: r/r rear landing/stair to grade. remodel kit, m-bath, bath, w/d, pwdr. | $220,000 | |
| Mar 19, 2021 | Completed final sign-off Aug 2021 | 367 Ivy St | Diego Brothers Inc. | to comply with planning complaing # 2020-00737enf. legalization of fence with doors in rear yard & document nonconforming outdoor activity area for use by 482 hayes st permitteed persuant to pa# 201603141883 & 8403076.Details
to comply with planning complaing # 2020-00737enf. legalization of fence with doors in rear yard & document nonconforming outdoor activity area for use by 482 hayes st permitteed persuant to pa# 201603141883 & 8403076. | $5,200 |
| Feb 22, 2021 | Completed final sign-off Mar 2023 | 333 Lombard St | new interior connecting stair to floors above. 1/f: create habitable area. 2 bedrooms, 2 baths, w/d, interior connecting stair. 2/f: renovate kitchen, living, dining, powder room. 3/f: renovate master bedroom, bath, and powder room. replace guardrails at roof decks and decking. enlarge patio at rearDetails
new interior connecting stair to floors above. 1/f: create habitable area. 2 bedrooms, 2 baths, w/d, interior connecting stair. 2/f: renovate kitchen, living, dining, powder room. 3/f: renovate master bedroom, bath, and powder room. replace guardrails at roof decks and decking. enlarge patio at rear | $400,000 | |
| Jan 12, 2021 | Completed final sign-off Aug 2021 | 413 Lyon St | Eastwood Development Incorporated | revision to pa 201902223609. repair/reconstruct front exterior entry stair in-kind.Details
revision to pa 201902223609. repair/reconstruct front exterior entry stair in-kind. | $2,500 |
| Jan 12, 2021 | Completed final sign-off May 2022 | 50 Arguello Bl | Eastwood Development Incorporated | revision to pa 201912200216. replace/relocate 3 basement windows at front elevation. delete 8 windows at north elevation. replace 2 windows w/ wd casement at south elevation.Details
revision to pa 201912200216. replace/relocate 3 basement windows at front elevation. delete 8 windows at north elevation. replace 2 windows w/ wd casement at south elevation. | $3,500 |
| Dec 23, 2020 | Completed final sign-off May 2021 | 905 Kansas St | Eastwood Development Incorporated | remove & infill 2 existing 45 minute property line windows with 1 hr wallDetails
remove & infill 2 existing 45 minute property line windows with 1 hr wall | $2,000 |
| Dec 22, 2020 | Completed final sign-off Aug 2021 | 413 Lyon St | Eastwood Development Incorporated | revision to pa #201902223609 - add skylight at master bathroom. structural roof framing revisionDetails
revision to pa #201902223609 - add skylight at master bathroom. structural roof framing revision | $500 |
| Nov 20, 2020 | Completed final sign-off Apr 2021 | 232 Clipper St | Eastwood Development Incorporated | rev to pa201807114327-s2 to address 2020-009552enf; 1/f reconfigure location of kitchen, utility room, closet & powder room. delete landscape guardrail at less than 30in drop. 2/f reconfigure coat closet/pantry. 3/f config m.bath layout; convert door system/juliet balcony to window.Details
rev to pa201807114327-s2 to address 2020-009552enf; 1/f reconfigure location of kitchen, utility room, closet & powder room. delete landscape guardrail at less than 30in drop. 2/f reconfigure coat closet/pantry. 3/f config m.bath layout; convert door system/juliet balcony to window. | |
| Nov 20, 2020 | Completed final sign-off Jan 2021 | 811 Carolina St | Eastwood Development Incorporated | revision to pa# 201809140224. document as-built conditions for final. fl 1 reconfigure kitchen. reverse utility & power room. fl 2 reverse toilet/lav at powder room. delete window at pantry. fl 3 delete juliet balcony at rear. add window at side of dormer. alter skylight.Details
revision to pa# 201809140224. document as-built conditions for final. fl 1 reconfigure kitchen. reverse utility & power room. fl 2 reverse toilet/lav at powder room. delete window at pantry. fl 3 delete juliet balcony at rear. add window at side of dormer. alter skylight. | |
| Nov 9, 2020 | Completed final sign-off Jul 2021 | 143 Skyview Wy | revision to pa# 201912200150. 1st fl replace garage door & garage front window. 2nd fl structural strangthen (e) garage beam at removed post. 2nd fl ceiling joists. add dog wash at utility room. alter master bath layout.Details
revision to pa# 201912200150. 1st fl replace garage door & garage front window. 2nd fl structural strangthen (e) garage beam at removed post. 2nd fl ceiling joists. add dog wash at utility room. alter master bath layout. | $4,000 | |
| Oct 27, 2020 | Never finaled issued Dec 2020, no final | 303 Crestmont Dr | to comply with nov # 202051531. remodel kitchen and alter surrounding walls. remodel 2 bathrooms. replace vanity, wc and floor. provide new wood floors throughtout. replace decking and guardrail at balcony.Details
to comply with nov # 202051531. remodel kitchen and alter surrounding walls. remodel 2 bathrooms. replace vanity, wc and floor. provide new wood floors throughtout. replace decking and guardrail at balcony. | $7,500 | |
| Oct 19, 2020 | Never finaled filed Oct 2020, never issued | 1927 Washington St | Eastwood Development Incorporated | repair/replace in-kind fire damage to (e) 3 unit building. to comply with nov202044453.Details
repair/replace in-kind fire damage to (e) 3 unit building. to comply with nov202044453. | $200,000 |
| Sep 2, 2020 | Completed final sign-off Jun 2022 | 170 Madrone Av | construct code minimum exterior exit stair at rear yard off (e) kitchen as a permitted obstruction per planning code section 136c14. no 311 notification required.Details
construct code minimum exterior exit stair at rear yard off (e) kitchen as a permitted obstruction per planning code section 136c14. no 311 notification required. | $5,500 | |
| Aug 26, 2020 | Completed final sign-off Sep 2020 | 537 Grove St | Eastwood Development Incorporated | renew permits to obtain final inspection for work approved under premit applications #201108313624, #201904178192 and #201908078117Details
renew permits to obtain final inspection for work approved under premit applications #201108313624, #201904178192 and #201908078117 | |
| Jul 17, 2020 | Completed final sign-off Oct 2023 | 1763 20th Av | Opus Pacific Development | basement: expand/excavate bedroom under (e) house. reconstruct interior connecting stair. flr '1': renovate kit/liv/din/study. flr '2': create second story addition with (4) bdrms / (2) baths + washer/dryerDetails
basement: expand/excavate bedroom under (e) house. reconstruct interior connecting stair. flr '1': renovate kit/liv/din/study. flr '2': create second story addition with (4) bdrms / (2) baths + washer/dryer | $300,000 |
| Jul 2, 2020 | Completed final sign-off Aug 2023 | 8320 Geary Bl | Towey Construction Inc. | vertical & horizontal addition flr 1: expand/convert habitable area. renovate family rm, guest bdrm, washer/dryer, new interior connecting stair. flr 2: reovate it/liv/din/bedrms/bath & add powder rm. flr 3: create third flr addition - master bedrm, bath & roof deck.Details
vertical & horizontal addition flr 1: expand/convert habitable area. renovate family rm, guest bdrm, washer/dryer, new interior connecting stair. flr 2: reovate it/liv/din/bedrms/bath & add powder rm. flr 3: create third flr addition - master bedrm, bath & roof deck. | $300,000 |
| Mar 10, 2020 | Completed final sign-off Aug 2021 | 413 Lyon St | Eastwood Development Incorporated | revision to pa #2019-0322-3609: 1st flr: alter garage & bedrooms. flr #2: alter entry closet & entertainment cabinet. 3rd flr: alter master bedroom & entertainment cabinet.Details
revision to pa #2019-0322-3609: 1st flr: alter garage & bedrooms. flr #2: alter entry closet & entertainment cabinet. 3rd flr: alter master bedroom & entertainment cabinet. |