Permit GraphShortlistSan Francisco building permits since 2000

Baldenebro Construction

Contractor license
1007712
State license record
Based in
San Rafael
On San Francisco permits
Oct 2017 to Jun 2026
Last 24 months
1 permit filed

11 permits since 2000: 10 completed, 1 in progress.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

AllKitchen remodel 5Bathroom remodel 5
FiledOutcomeAddressWork described on the permitDeclared cost
Jun 15, 2026In progress
issued Jun 2026
1540 O'farrell Streplace countertop, sink with dishwasher in it, stove, mircrowave, backsplash, replace inswing bathroom door with a pocket door, this door is located at a partition wall.
Details
Permit
202606153233
Permit issued
Jun 17, 2026

replace countertop, sink with dishwasher in it, stove, mircrowave, backsplash, replace inswing bathroom door with a pocket door, this door is located at a partition wall.

Open the permit page

$25,000
Mar 14, 2024Completed
final sign-off Feb 2025
64 Crags Ctreplace hardwood floors throughout. relocate washer & dryer to kitchen. alter bedroom hallway. skim coat plaster walls. provde fire rated sheet rock at garage. upgrade electrical lighting and outlets
Details
Permit
202403147848
Permit issued
May 15, 2024
Final sign-off
Feb 6, 2025

replace hardwood floors throughout. relocate washer & dryer to kitchen. alter bedroom hallway. skim coat plaster walls. provde fire rated sheet rock at garage. upgrade electrical lighting and outlets

Open the permit page

$30,000
Nov 3, 2023Completed
final sign-off Dec 2023
1305 Lagunainstall a washer/dryer at kitchen location where the fridge is now relocate fridge to the living room
Details
Permit
202311030135
Permit issued
Nov 3, 2023
Final sign-off
Dec 8, 2023

install a washer/dryer at kitchen location where the fridge is now relocate fridge to the living room

Open the permit page

$4,500
Oct 26, 2023Completed
final sign-off Dec 2023
1305 Lagunaunit #3: bathroom remodel. remove (e) bathtub and replace w/ walk-in shower. replace toilet and replace sink.
Details
Permit
202310269548
Permit issued
Oct 26, 2023
Final sign-off
Dec 8, 2023

unit #3: bathroom remodel. remove (e) bathtub and replace w/ walk-in shower. replace toilet and replace sink.

Open the permit page

$23,000
Sep 17, 2020Completed
final sign-off Feb 2022
10 Quickstep Lnremoving 2 bath tabs. 1 full bath, 1 half bath and laundry room. install dishwasher, paint kitchen cabinets, resurface. install new counter top. all work in kind.
Details
Permit
202009174346
Permit issued
Sep 17, 2020
Final sign-off
Feb 1, 2022

removing 2 bath tabs. 1 full bath, 1 half bath and laundry room. install dishwasher, paint kitchen cabinets, resurface. install new counter top. all work in kind.

Open the permit page

$43,000
Sep 2, 2020Completed
final sign-off Mar 2021
167 Skyview Wyremove a partition wall between kitchen and living room. install a new 4x6 post and 5.5x9 engineering wood will be installed. a new window at garage level will be installed. convert washing room to add full bedroom. front door replacements.
Details
Permit
202009023245
Permit issued
Oct 1, 2020
Final sign-off
Mar 11, 2021

remove a partition wall between kitchen and living room. install a new 4x6 post and 5.5x9 engineering wood will be installed. a new window at garage level will be installed. convert washing room to add full bedroom. front door replacements.

Open the permit page

$70,000
Jul 14, 2020Completed
final sign-off Mar 2021
167 Skyview Wyrear window replacement, and rear door replacement. no windows or work visible from street. we will replace one sliding doors and one sliding window. thank you,
Details
Permit
202007140139
Permit issued
Aug 10, 2020
Final sign-off
Mar 11, 2021

rear window replacement, and rear door replacement. no windows or work visible from street. we will replace one sliding doors and one sliding window. thank you,

Open the permit page

$7,500
May 16, 2019Completed
final sign-off Jul 2019
20 Quickstep Lnunit 2: move shower head higher/redo shower valve. install drywall on bottom of wall 2' feet from bottom of wall @ hallway/living room. install hardwood floor. install gfci outlet @ bathroom & kitchen. installdenshield & tile @ shower wall. install hardy backer/tile fl. all new lighting to be led.
Details
Permit
201905160887
Permit issued
May 16, 2019
Final sign-off
Jul 12, 2019

unit 2: move shower head higher/redo shower valve. install drywall on bottom of wall 2' feet from bottom of wall @ hallway/living room. install hardwood floor. install gfci outlet @ bathroom & kitchen. installdenshield & tile @ shower wall. install hardy backer/tile fl. all new lighting to be led.

Open the permit page

$25,379
Jul 19, 2018Completed
final sign-off Nov 2018
1215 Dolores Stinterior remodel of e 1st fl bath and create a master bath out of a closet and washer dryer area. no work to exterior of building
Details
Permit
201807194994
Permit issued
Jul 24, 2018
Final sign-off
Nov 19, 2018

interior remodel of e 1st fl bath and create a master bath out of a closet and washer dryer area. no work to exterior of building

Open the permit page

$27,000
Jan 29, 2018Completed
final sign-off Nov 2018
1477 39th Avnew adu to be formed at ground floor per ordinance 95-17. revision to pa 2013-1015-9301 and 2014-0616-8423 layout change. remove wetbar. revision o 2017-1019-1643.
Details
Permit
201801299807
Permit issued
Jun 28, 2018
Final sign-off
Nov 13, 2018

new adu to be formed at ground floor per ordinance 95-17. revision to pa 2013-1015-9301 and 2014-0616-8423 layout change. remove wetbar. revision o 2017-1019-1643.

Open the permit page

$20,000
Oct 19, 2017Completed
final sign-off Nov 2018
1475 39th Avcommencement of work not started under previously approved permit pa#201310159301 & 2014068423.
Details
Permit
201710191643
Permit issued
Oct 19, 2017
Final sign-off
Nov 13, 2018

commencement of work not started under previously approved permit pa#201310159301 & 2014068423.

Open the permit page

$78,000