11 permits since 2000: 10 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 4 completed, 1 in progress. Typically 0 days from filing to permit and 88 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 15, 2026 | In progress issued Jun 2026 | 1540 O'farrell St | replace countertop, sink with dishwasher in it, stove, mircrowave, backsplash, replace inswing bathroom door with a pocket door, this door is located at a partition wall.Details
replace countertop, sink with dishwasher in it, stove, mircrowave, backsplash, replace inswing bathroom door with a pocket door, this door is located at a partition wall. | $25,000 |
| Oct 26, 2023 | Completed final sign-off Dec 2023 | 1305 Laguna | unit #3: bathroom remodel. remove (e) bathtub and replace w/ walk-in shower. replace toilet and replace sink.Details
unit #3: bathroom remodel. remove (e) bathtub and replace w/ walk-in shower. replace toilet and replace sink. | $23,000 |
| Sep 17, 2020 | Completed final sign-off Feb 2022 | 10 Quickstep Ln | removing 2 bath tabs. 1 full bath, 1 half bath and laundry room. install dishwasher, paint kitchen cabinets, resurface. install new counter top. all work in kind.Details
removing 2 bath tabs. 1 full bath, 1 half bath and laundry room. install dishwasher, paint kitchen cabinets, resurface. install new counter top. all work in kind. | $43,000 |
| May 16, 2019 | Completed final sign-off Jul 2019 | 20 Quickstep Ln | unit 2: move shower head higher/redo shower valve. install drywall on bottom of wall 2' feet from bottom of wall @ hallway/living room. install hardwood floor. install gfci outlet @ bathroom & kitchen. installdenshield & tile @ shower wall. install hardy backer/tile fl. all new lighting to be led.Details
unit 2: move shower head higher/redo shower valve. install drywall on bottom of wall 2' feet from bottom of wall @ hallway/living room. install hardwood floor. install gfci outlet @ bathroom & kitchen. installdenshield & tile @ shower wall. install hardy backer/tile fl. all new lighting to be led. | $25,379 |
| Jul 19, 2018 | Completed final sign-off Nov 2018 | 1215 Dolores St | interior remodel of e 1st fl bath and create a master bath out of a closet and washer dryer area. no work to exterior of buildingDetails