Block 0314, lot 009
226 Powell St
- City’s use
- Commercial Retail
- Built
- 1910
- Stories
- 3
- Units
- 3
- Rooms
- 5 bathrooms
- Building
- 6,560 sq ft
- Lot
- 2,883 sq ft
- Zoning
- C3R
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
29 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 6, 2022 | Completed final sign-off Jul 2022 | 226 Powell St | revision to pa #202110251077. delete elevator upgrades and break room front scope of work. extg elevator ada compliant, break room under future t.i.Details
revision to pa #202110251077. delete elevator upgrades and break room front scope of work. extg elevator ada compliant, break room under future t.i. | ||
| Dec 23, 2021 | Never finaled issued Jun 2022, no final | 226 Powell St | paint facade, remove canopy over fl 1 storefront, replace stone tile at fl 1 facade.Details
paint facade, remove canopy over fl 1 storefront, replace stone tile at fl 1 facade. | $20,000 | |
| Oct 25, 2021 | Completed final sign-off Jul 2022 | 226 Powell St | floor 2: infill open floor area cut out under permit#9708091/#9813534. tenant improvement under future permit.ada upgrades to bathroom,kitchen,elevator.floor 3: demo conference room/office t.i.ada upgrades to bathDetails
floor 2: infill open floor area cut out under permit#9708091/#9813534. tenant improvement under future permit.ada upgrades to bathroom,kitchen,elevator.floor 3: demo conference room/office t.i.ada upgrades to bath | $40,000 | |
| Jul 24, 2019 | Completed final sign-off Oct 2019 | 226 Powell St | Everest Waterproofing & Restoration Inc. | revision to app#201904057261 expanded repairs after exposure of steel frameDetails
revision to app#201904057261 expanded repairs after exposure of steel frame | $18,000 |
| Jul 9, 2019 | Never finaled issued Jul 2019, no final | 228 Powell St | street space | ||
| Apr 5, 2019 | Completed final sign-off Oct 2019 | 226 Powell St | Everest Waterproofing & Restoration Inc. | structural repairs @ (e) brick & (e) steel. no change in use. ti under sep permitDetails
structural repairs @ (e) brick & (e) steel. no change in use. ti under sep permit | $45,000 |
| Jan 9, 2019 | Never finaled issued Jan 2019, no final | 228 Powell St | street space only | ||
| Nov 14, 2018 | Never finaled issued Nov 2018, no final | 228 Powell St | street space | ||
| Oct 11, 2018 | Expired or cancelled cancelled Jan 2026 | 226 Powell St | remove awning, repair cement tile on lower portion of facade, in kind, repaint wood trim and wood details.Details
remove awning, repair cement tile on lower portion of facade, in kind, repaint wood trim and wood details. | $40,000 | |
| Jan 30, 2015 | Never finaled issued Jan 2015, no final | 226 Powell St | street space | ||
| Dec 1, 2014 | Never finaled issued Dec 2014, no final | 226 Powell St | street space | ||
| Sep 29, 2014 | Never finaled issued Sep 2014, no final | 226 Powell St | street space | ||
| Jul 28, 2014 | Completed final sign-off Mar 2015 | 226 Powell St | Ivan Alberto Rivera Rivas | 2 & 3/f - t.i. to (e) salon- 1/ replace equipment & fixtures 2/ frame new doors and non-bearing walls 3/new accessible counters 4/ new showers & accessibility & steam room 5/ health dept change of ownership and added use for health care and medical services for ca state certified establishment.Details
2 & 3/f - t.i. to (e) salon- 1/ replace equipment & fixtures 2/ frame new doors and non-bearing walls 3/new accessible counters 4/ new showers & accessibility & steam room 5/ health dept change of ownership and added use for health care and medical services for ca state certified establishment. | $95,000 |
| Sep 5, 2013 | Expired or cancelled cancelled Mar 2021 | 228 Powell St | Premier Sign Company | to erect electric, wall, single faced sign. electric sign facing streetDetails
to erect electric, wall, single faced sign. electric sign facing street | $4,500 |
| Sep 5, 2013 | Expired or cancelled cancelled Mar 2021 | 228 Powell St | Premier Sign Company | to erect electric, single faced sign. electric sign inside store facing streetDetails
to erect electric, single faced sign. electric sign inside store facing street | $4,500 |
| Sep 5, 2013 | Expired or cancelled cancelled Mar 2021 | 228 Powell St | Premier Sign Company | to erect non-electric, wall, single faced sign. non electric sign inside storeDetails
to erect non-electric, wall, single faced sign. non electric sign inside store | $4,500 |
| Aug 20, 2013 | Never finaled issued Aug 2013, no final | 228 Powell St | Potter Fire Protection | street level - relocate (4) fire sprinklers. ref bldg pa #2013.06.05.8688Details
street level - relocate (4) fire sprinklers. ref bldg pa #2013.06.05.8688 | $1,850 |
| Jun 5, 2013 | Never finaled issued Jul 2013, no final | 228 Powell St | Sajo, Inc. | t.i of (e) retail space including ceiling, doors, partitions, fixtures, shelving in non sales area.Details
t.i of (e) retail space including ceiling, doors, partitions, fixtures, shelving in non sales area. | $200,000 |
| Sep 1, 2005 | Completed final sign-off Sep 2005 | 230 Powell St | Yellow Zone Construction | proposed a new bealty salon at 3rd fl.Details
proposed a new bealty salon at 3rd fl. | $30,000 |
| Jun 22, 2005 | Never finaled issued Jun 2005, no final | 230 Powell St | street space permit only. | ||
| Apr 5, 2005 | Never finaled issued Apr 2005, no final | 228 Powell St | street space | ||
| Feb 18, 2005 | Never finaled issued Feb 2005, no final | 228 Powell St | Dpw Inc. | revision to app #200502024639/new soffitt requires relocation of 6 heads & 1 additionDetails
revision to app #200502024639/new soffitt requires relocation of 6 heads & 1 addition | |
| Feb 2, 2005 | Completed final sign-off Jul 2005 | 228 Powell St | Dpw Inc. | relocate 24 sprinklers, add 4 heads & 2 new branch linesDetails
relocate 24 sprinklers, add 4 heads & 2 new branch lines | $6,800 |
| Dec 8, 2004 | Never finaled issued Feb 2005, no final | 228 Powell St | remove existing storefront. provide new storefront with new finishes and double doorDetails
remove existing storefront. provide new storefront with new finishes and double door | $25,000 | |
| Dec 7, 2004 | Completed final sign-off Jul 2005 | 228 Powell St | t/i will involve demolition of (e) interior partitions & portion of ceilingDetails
t/i will involve demolition of (e) interior partitions & portion of ceiling | $97,100 | |
| Dec 1, 2004 | Never finaled issued Dec 2004, no final | 228 Powell St | erect sign for elctric, projecting, single faced.Details
erect sign for elctric, projecting, single faced. | ||
| Dec 1, 2004 | Never finaled issued Dec 2004, no final | 228 Powell St | erect sign for non electric, projecting , double faced.Details
erect sign for non electric, projecting , double faced. | ||
| Dec 1, 2004 | Never finaled issued Dec 2004, no final | 228 Powell St | install canopy per plan. signages under separate permit. facade under separate permit.Details
install canopy per plan. signages under separate permit. facade under separate permit. | $50,000 | |
| Dec 1, 2004 | Never finaled issued Dec 2004, no final | 228 Powell St | erect sign for electric, projecting, single faced.Details
erect sign for electric, projecting, single faced. |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Premier Sign Company (3), Dpw Inc. (2), Everest Waterproofing & Restoration Inc. (2), Ivan Alberto Rivera Rivas, Potter Fire Protection, Sajo, Inc., Yellow Zone Construction
- Architects
- Albert Gregor 4521 Rue Lark #300 (5), Curtis Hollenbeck (2)
- Engineers
- Erevan O'neill, Raymond Situ
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.