Connor Daniel Daly
- Listed as
- authorized agent-others, contractor, designer
- Firm
- Connor Daly Corporation
- Based in
- San Francisco
- On San Francisco permits
- Jul 2004 to Aug 2026
205 permits since 2000 (contractor on 205 permits, authorized agent-others on 4 permits, designer on 1 permit): 140 completed, 6 in progress, 41 never finaled, 18 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 205.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 31, 2026 | Completed final sign-off Sep 2026 | 177 Tucker Av | Connor Daly Corporation | remove and add partiton walls for kitchen. add new bathroom.Details
remove and add partiton walls for kitchen. add new bathroom. | |
| Aug 18, 2026 | Completed final sign-off Sep 2026 | 177 Tucker Av | Connor Daly Corporation | remodel 3 bathrooms, no conversions, like for like remodel. replace toilets, sinks, showers, install new vent for furance water heater, will pull seperate trade permits.Details
remodel 3 bathrooms, no conversions, like for like remodel. replace toilets, sinks, showers, install new vent for furance water heater, will pull seperate trade permits. | $35,000 |
| Aug 10, 2026 | In progress issued Aug 2026 | 341 Park St | Connor Daly Corporation | revise foundation details for p/a #2025-1205-1094 to reflect the need for a 5'-6" =/- tall retaining wall.Details
revise foundation details for p/a #2025-1205-1094 to reflect the need for a 5'-6" =/- tall retaining wall. | |
| Aug 10, 2026 | Completed final sign-off Sep 2026 | 177 Tucker Av | Connor Daly Corporation | comply with nov 202660296. remove and replace 10 windows in like kind. remove awning and steel bars. remodel kitchen in kindDetails
comply with nov 202660296. remove and replace 10 windows in like kind. remove awning and steel bars. remodel kitchen in kind | $24,000 |
| Jul 23, 2026 | In progress issued Jul 2026 | 235 Surrey St | Connor Daly Corporation | replace rear retaining wallk and concrete stepsDetails
replace rear retaining wallk and concrete steps | $40,000 |
| Jun 18, 2026 | In progress issued Jun 2026 | 36 Broderick St | Connor Daly Corporation | revision 202604209698- replace foundation at gridline 4Details
revision 202604209698- replace foundation at gridline 4 | |
| May 15, 2026 | Completed final sign-off Jul 2026 | 1443 Hudson Av | Connor Daly Corporation | revision 202512182101- footing detail to reflect actual field verified conditionDetails
revision 202512182101- footing detail to reflect actual field verified condition | $34,000 |
| Apr 20, 2026 | In progress issued May 2026 | 36 Broderick St | Connor Daly Corporation | replace rear brick foundation, basement & wood framing repairs, voluntary seismic retrofit. shoring.Details
replace rear brick foundation, basement & wood framing repairs, voluntary seismic retrofit. shoring. | $87,500 |
| Feb 20, 2026 | In progress issued Feb 2026 | 1443 Hudson Av | Connor Daly Corporation | revision to 202512182101: replace e) window with french doorsDetails
revision to 202512182101: replace e) window with french doors | $500 |
| Dec 22, 2025 | In progress issued Jul 2026 | 341 Park St | Munoz Villa Construction, Connor Daly Corporation | rear and side addition, a notch in the building side for a lightwell, a rear yeard deck at the ground level with a retractable awning and enclosed rain barrels, wideniing the existing garage door and west driveway, and interior remodeling with new windows and exterior doors and skylights.Details
rear and side addition, a notch in the building side for a lightwell, a rear yeard deck at the ground level with a retractable awning and enclosed rain barrels, wideniing the existing garage door and west driveway, and interior remodeling with new windows and exterior doors and skylights. | $600,000 |
| Dec 18, 2025 | Completed final sign-off Jul 2026 | 1443 Hudson Av | Connor Daly Corporation | ground lvel foundation replacement for existing storage space in the rear of building. lower new slab approx. 4 inches.Details
ground lvel foundation replacement for existing storage space in the rear of building. lower new slab approx. 4 inches. | $34,000 |
| Dec 10, 2025 | Completed final sign-off Mar 2026 | 85 Miguel St | Connor Daly Corporation | shearwalls in crawlspace per plan set a- voluntary structrual strengtheningDetails
shearwalls in crawlspace per plan set a- voluntary structrual strengthening | $8,000 |
| Dec 10, 2025 | Completed final sign-off Mar 2026 | 268 Gold Mine Dr | Connor Daly Corporation | replace steel bracket at piers. repair spallingDetails
replace steel bracket at piers. repair spalling | $15,000 |
| Nov 17, 2025 | Completed final sign-off Jul 2026 | 177 Tucker Av | Connor Daly Corporation | install sheetrock in garage. paint exterior.Details
install sheetrock in garage. paint exterior. | $9,500 |
| Nov 6, 2025 | Completed final sign-off Nov 2025 | 177 Tucker Av | Connor Daly Corporation | remove and replace (3) windows at rear of building. not visible from street. all in kind.Details
remove and replace (3) windows at rear of building. not visible from street. all in kind. | $3,000 |
| Aug 7, 2025 | Completed final sign-off Nov 2025 | 177 Tucker Av | Connor Daly Corporation | to comply with nov 202539108 & 202539354. #2 - replace side garage door, #9- remove and replace sheetrock where moldy, - 10 repair damaged ceiling and walls, replace dry rot in kind.remove/replace 700 sf siding @ rear. at eastwall, install 6" sds at 12"oc to connect original stud to stud at additionDetails
to comply with nov 202539108 & 202539354. #2 - replace side garage door, #9- remove and replace sheetrock where moldy, - 10 repair damaged ceiling and walls, replace dry rot in kind.remove/replace 700 sf siding @ rear. at eastwall, install 6" sds at 12"oc to connect original stud to stud at addition | $37,000 |
| Mar 3, 2025 | Completed final sign-off Mar 2025 | 1375 25th Av | Connor Daly Corporation | install 5/8" anchor bolts @ 4' oc in garage w/ 3" square washer & nutDetails
install 5/8" anchor bolts @ 4' oc in garage w/ 3" square washer & nut | $5,000 |
| Oct 28, 2024 | Completed final sign-off Feb 2025 | 2722 Bryant St | Connor Daly Corporation | enclosure under landry room at rear of building and demo/replace rear foundation.Details
enclosure under landry room at rear of building and demo/replace rear foundation. | $25,000 |
| Oct 7, 2024 | Completed final sign-off Feb 2025 | 2754 Greenwich St | Connor Daly Corporation | move garage post.Details
move garage post. | $9,500 |
| Aug 2, 2024 | Completed final sign-off Aug 2024 | 2125 Greenwich St | Connor Daly Corporation | voluntary structural strengthening at garage. install new anchor bolts, plywood, and clips.Details
voluntary structural strengthening at garage. install new anchor bolts, plywood, and clips. | $14,000 |
| Jul 1, 2024 | Completed final sign-off Aug 2024 | 3854 26th | Connor Daly Corporation | voluntary strenghtening at ground floor per 2022 cebc ch. a-4.Details
voluntary strenghtening at ground floor per 2022 cebc ch. a-4. | $20,000 |
| Jun 17, 2024 | Completed final sign-off Sep 2024 | 3924 19th St | Connor Daly Corporation | partial foundation replacement and voluntary structural strengthening. reinforce garage centerline beam; replace rotten sill plate as noted and add anchor bolts.Details
partial foundation replacement and voluntary structural strengthening. reinforce garage centerline beam; replace rotten sill plate as noted and add anchor bolts. | $75,000 |
| Apr 8, 2024 | Completed final sign-off May 2024 | 1027 Fell St | Connor Daly Corporation | voluntary strengthening at ground flDetails
voluntary strengthening at ground fl | $58,000 |
| Apr 8, 2024 | Completed final sign-off May 2024 | 1139 Moraga St | Connor Daly Corporation | voluntary seismic strengthening install anchor bolts, plywood at 1st flr of single family.Details
voluntary seismic strengthening install anchor bolts, plywood at 1st flr of single family. | $6,000 |
| Jan 30, 2024 | Completed final sign-off May 2025 | 3007 California St | Connor Daly Corporation | revision to 202104289495. new slab, isolated footings and grade beamDetails
revision to 202104289495. new slab, isolated footings and grade beam | $1,000 |
| Jan 17, 2024 | Completed final sign-off Sep 2024 | 133 Henry St | Connor Daly Corporation | voluntary seismic retrofit on 1st floorDetails
voluntary seismic retrofit on 1st floor | $28,000 |
| Mar 20, 2023 | Completed final sign-off Jun 2023 | 1109 Hampshire St | Connor Daly Corporation | front bay window reinforcement - interior structural supports. wood decay repairs - ground floor selective repair and replacement in kind of siding.Details
front bay window reinforcement - interior structural supports. wood decay repairs - ground floor selective repair and replacement in kind of siding. | $19,500 |
| Mar 13, 2023 | Completed final sign-off May 2023 | 313 Parnassus Av | Connor Daly Corporation | replace centerline posts & footings. install anchoer bolts.Details
replace centerline posts & footings. install anchoer bolts. | $7,500 |
| Dec 19, 2022 | Completed final sign-off Apr 2023 | 801 Clayton St | Connor Daly Corporation | revision to bpa#201802151350, mandatory soft story retrofit, correcting as builtsDetails
revision to bpa#201802151350, mandatory soft story retrofit, correcting as builts | $65,000 |
| Nov 2, 2022 | Completed final sign-off Nov 2022 | 50 Scenic Wy | Connor Daly Corporation | voluntary installation of anchor bolts and plywood sheathing, in crawl space at 1st story.Details
voluntary installation of anchor bolts and plywood sheathing, in crawl space at 1st story. | $14,000 |
| Sep 27, 2022 | Completed final sign-off Aug 2024 | 1907 Leavenworth St | Connor Daly Corporation | voluntary strengthening of the foundation level of the subject property.Details
voluntary strengthening of the foundation level of the subject property. | $1,048,000 |
| Sep 7, 2022 | Completed final sign-off Feb 2023 | 964 Ashbury St | Connor Daly Corporation | recommencement of work start under previously approved pa 201802151349. to comply with nov 202032871.Details
recommencement of work start under previously approved pa 201802151349. to comply with nov 202032871. | |
| Aug 17, 2022 | Completed final sign-off Sep 2022 | 168 Southwood Dr | Connor Daly Corporation | remodel (e) bathroom, same layout. painted walls and stained floors.Details
remodel (e) bathroom, same layout. painted walls and stained floors. | $15,000 |
| Jul 29, 2022 | Never finaled issued Jul 2022, no final | 61 Gladys St | Connor Daly Corporation | install scaffolding (not st facing). remove and replace siding at south wall. approx 650 sfDetails
install scaffolding (not st facing). remove and replace siding at south wall. approx 650 sf | $18,000 |
| Jul 13, 2022 | Completed final sign-off Jul 2022 | 800 Lyon St | Connor Daly Corporation | remove awning at property line (at rear of building).Details
remove awning at property line (at rear of building). | $7,000 |
| May 11, 2022 | Never finaled issued Jun 2022, no final | 125 Highland Av | Connor Daly Corporation | interior renovation including bathroom modifications, added hallway closets, and kitchen and office configurations.Details
interior renovation including bathroom modifications, added hallway closets, and kitchen and office configurations. | $60,000 |
| Apr 27, 2022 | Never finaled issued Jun 2022, no final | 125 Highland Av | Connor Daly Corporation | window replacement. all window sizes & locations are being replaced in-kind. fence and gate modifications/ replacement. fence to be no higher than 6' high and will be 75% transparent. all windows to be wood. 6 windows to be replaced. u=.30 maxDetails
window replacement. all window sizes & locations are being replaced in-kind. fence and gate modifications/ replacement. fence to be no higher than 6' high and will be 75% transparent. all windows to be wood. 6 windows to be replaced. u=.30 max | $20,000 |
| Jan 26, 2022 | Completed final sign-off Apr 2022 | 1265 04th Av | Connor Daly Corporation | kitchen remodel.Details
kitchen remodel. | $14,500 |
| Nov 9, 2021 | Completed final sign-off May 2022 | 225 Upper Tr | Connor Daly Corporation | remodel 2 bathrooms and 1 kitchen, in-kind, same layount. no wall modifications.Details
remodel 2 bathrooms and 1 kitchen, in-kind, same layount. no wall modifications. | $60,000 |
| Oct 1, 2021 | Completed final sign-off Aug 2022 | 617 Castro St | Sft Construction Corp, Connor Daly Corporation | voluntary foundation strengthening.Details
voluntary foundation strengthening. | $24,000 |
| Jul 19, 2021 | Completed final sign-off Aug 2021 | 188 Arguello Bl | Connor Daly Corporation | install new gas insert at (e) gas fireplace/chimney.Details
install new gas insert at (e) gas fireplace/chimney. | $6,500 |
| Jul 8, 2021 | Never finaled issued Oct 2021, no final | 47 Fair Oaks St | Connor Daly Corporation | voluntary strenthening at crawl space with wood-frame shear walls.Details
voluntary strenthening at crawl space with wood-frame shear walls. | $8,000 |
| Jun 28, 2021 | Completed final sign-off Oct 2022 | 1960 Golden Gate Av | Connor Daly Corporation | rev to pa201502269430 - new concrete curb along grid c.6.Details
rev to pa201502269430 - new concrete curb along grid c.6. | |
| Jun 23, 2021 | Completed final sign-off Jan 2022 | 151 Bartlett St | Connor Daly Corporation | voluntary strengthening of ground floor, add plywood shear walls w/concrete foundationsDetails
voluntary strengthening of ground floor, add plywood shear walls w/concrete foundations | $55,000 |
| Jun 18, 2021 | Completed final sign-off Apr 2022 | 2243 Franklin St | Connor Daly Corporation | remove and replace existing roof deck. (see pa 8402206/9314799/9925797 in kind. replace damaged roof under roof deck as necessaryDetails
remove and replace existing roof deck. (see pa 8402206/9314799/9925797 in kind. replace damaged roof under roof deck as necessary | $18,000 |
| Jun 15, 2021 | Completed final sign-off May 2022 | 163 Prospect Av | Connor Daly Corporation | revision to pa# 202011249620: corrected window sizes in window schedule, updated t24 analysisDetails
revision to pa# 202011249620: corrected window sizes in window schedule, updated t24 analysis | |
| Jun 4, 2021 | Completed final sign-off Oct 2022 | 1960 Golden Gate Av | Connor Daly Corporation | to comply with nov 202178336. add 1/f support framing.Details
to comply with nov 202178336. add 1/f support framing. | $5,000 |
| May 10, 2021 | Completed final sign-off Oct 2022 | 1960 Golden Gate Av | Connor Daly Corporation | remodel (e) bathroom, in-kind. no layout changes and no walls modified, infilled or altered. no structural work - no framing modifications.Details
remodel (e) bathroom, in-kind. no layout changes and no walls modified, infilled or altered. no structural work - no framing modifications. | $5,000 |
| Apr 30, 2021 | Completed final sign-off Apr 2022 | 155 Mayfair Dr | Connor Daly Corporation | existing unit built in 2008, no records of permitting. we are submitting documentation for legalization. unit is 811 sq approx with: 1 bedroom, 1 full bathroom, 1 kitchen, independent access from street. one of the existing windows needs to be altered to comply with cbc 1030Details
existing unit built in 2008, no records of permitting. we are submitting documentation for legalization. unit is 811 sq approx with: 1 bedroom, 1 full bathroom, 1 kitchen, independent access from street. one of the existing windows needs to be altered to comply with cbc 1030 | $120,000 |
| Apr 23, 2021 | Expired or cancelled cancelled Jan 2026 | 2243 Franklin St | Connor Daly Corporation | remove and replace existing roof deck (see pa 8402206/9314799/9925797) in-kind. replace damaged roof under roof deck as necessary.Details
remove and replace existing roof deck (see pa 8402206/9314799/9925797) in-kind. replace damaged roof under roof deck as necessary. | $18,000 |
| Apr 23, 2021 | Completed final sign-off Apr 2022 | 155 Mayfair Dr | Connor Daly Corporation | lower level (n) bedroom, (n) bathroom, replace (e) garage door w/(n) man door, remove and replace (e) windows as noted for code compliance cbc103/main level, remodel (e) bathroom to add shower, (n) door at room 3, demo (e) wall as notedDetails
lower level (n) bedroom, (n) bathroom, replace (e) garage door w/(n) man door, remove and replace (e) windows as noted for code compliance cbc103/main level, remodel (e) bathroom to add shower, (n) door at room 3, demo (e) wall as noted | $75,000 |
| Apr 12, 2021 | Completed final sign-off Dec 2021 | 686 24th Av | Connor Daly Corporation | expand previous rooms down addition by 185 sqft. replace rear frehch door with sliding door- no plumbing- electric outletsDetails
expand previous rooms down addition by 185 sqft. replace rear frehch door with sliding door- no plumbing- electric outlets | $50,000 |
| Jan 11, 2021 | Never finaled issued May 2023, no final | 824 Waller St | Connor Daly Corporation | voluntary strengthening by installing (n) plywood shearwalls in crawlspace, (n) collector elements. no foundation workDetails
voluntary strengthening by installing (n) plywood shearwalls in crawlspace, (n) collector elements. no foundation work | $8,000 |
| Dec 4, 2020 | Completed final sign-off Oct 2023 | 20 Henry St | Connor Daly Corporation | new rear-yard deck & stairs to replace existing non-code compliant deck & stairs. new deck & stairs to be accessed by new sliding doors at 2nd & 3rd levels.Details
new rear-yard deck & stairs to replace existing non-code compliant deck & stairs. new deck & stairs to be accessed by new sliding doors at 2nd & 3rd levels. | $15,000 |
| Nov 24, 2020 | Completed final sign-off May 2022 | 163 Prospect Av | Connor Daly Corporation | 1. voluntary soft story retrofit. 2. south wall - deferred maintenance. replace wood siding w/ same & add waterproofings & insulation layers. 3. 165 prospect-install 2 new street facing windows on property line wall. 4. 165 prospect-increase 5 (e) windows heights w/ new headers.Details
1. voluntary soft story retrofit. 2. south wall - deferred maintenance. replace wood siding w/ same & add waterproofings & insulation layers. 3. 165 prospect-install 2 new street facing windows on property line wall. 4. 165 prospect-increase 5 (e) windows heights w/ new headers. | $150,000 |
| Nov 19, 2020 | Completed final sign-off Feb 2021 | 1329 Bay St | Connor Daly Corporation | to comply with nov202054631: remove and replace (e) shower stall, same as (e).Details
to comply with nov202054631: remove and replace (e) shower stall, same as (e). | $1,200 |
| Oct 30, 2020 | Completed final sign-off Apr 2021 | 1459 Florida St | Connor Daly Corporation | remove & replace siding at front and rear of property, in-like kind. approx 550sf.Details
remove & replace siding at front and rear of property, in-like kind. approx 550sf. | $6,000 |
| Oct 30, 2020 | Completed final sign-off Nov 2020 | 2843 Octavia St | Connor Daly Corporation | repair/replace sheetrock in garage.Details
repair/replace sheetrock in garage. | $1,200 |
| Sep 29, 2020 | Completed final sign-off Jan 2022 | 1031 Key Av | Connor Daly Corporation | new roof deck over (e) one-story structure accessible from second level. new stairs from deck to rear yard (one level)Details
new roof deck over (e) one-story structure accessible from second level. new stairs from deck to rear yard (one level) | $40,000 |
| Aug 22, 2020 | Completed final sign-off Jan 2021 | 1376 De Haro St | Connor Daly Corporation | replace in kind 3 rear cantilever decks.Details
replace in kind 3 rear cantilever decks. | $10,000 |
| Aug 18, 2020 | Never finaled issued Aug 2020, no final | 128 03rd Av | Connor Daly Corporation | remove & replace siding at side and rear of building. 1200 sqft (not visible st)Details
remove & replace siding at side and rear of building. 1200 sqft (not visible st) | $10,000 |
| Jul 7, 2020 | Expired or cancelled expired Jun 2026 | 650 10th Av | Connor Daly Corporation | to comply w/ nov 201840391, #3-weatherproofing, #5-handrails. fix handrails at rear stairs. weatherproofing, north side of buildingDetails
to comply w/ nov 201840391, #3-weatherproofing, #5-handrails. fix handrails at rear stairs. weatherproofing, north side of building | $1,000 |
| Jun 29, 2020 | Completed final sign-off Mar 2021 | 1395 Newcomb Av | Connor Daly Corporation | interior remodel at 2nd floor including adding bathroom and remodeling kitchen and bathroom. replace footings at 1st floor level.Details
interior remodel at 2nd floor including adding bathroom and remodeling kitchen and bathroom. replace footings at 1st floor level. | $110,000 |
| Feb 19, 2020 | Completed final sign-off Apr 2020 | 2438 28th Av | Connor Daly Corporation | install new bathroom on ground floor, install new windows in office area, replace (e) door with fire rated door. upgrade electrical in office areaDetails
install new bathroom on ground floor, install new windows in office area, replace (e) door with fire rated door. upgrade electrical in office area | $15,000 |
| Feb 12, 2020 | Completed final sign-off Mar 2021 | 66 Eureka St | Connor Daly Corporation | revision to pa 2019-0506-9868. relocate new post locationDetails
revision to pa 2019-0506-9868. relocate new post location | |
| Jan 7, 2020 | Never finaled issued Jan 2020, no final | 1894 Great Hy | Connor Daly Corporation | street spaceDetails
street space | |
| Nov 25, 2019 | Completed final sign-off Mar 2021 | 66 Eureka St | Connor Daly Corporation | revison to pa#2019-0506-9868: due to increased scope of work at the lower unit. add new full bathroom. relocate laundry. add kitchen island. remove existing chimney and load bearing wall. at level 2 only.Details
revison to pa#2019-0506-9868: due to increased scope of work at the lower unit. add new full bathroom. relocate laundry. add kitchen island. remove existing chimney and load bearing wall. at level 2 only. | $45,000 |
| Nov 20, 2019 | Completed final sign-off Jul 2020 | 25 Castenada Av | Connor Daly Corporation | voluntary strengtheningDetails
voluntary strengthening | $4,000 |
| Nov 19, 2019 | Completed final sign-off Jul 2020 | 901 Stanyan St | Gartan Construction, Connor Daly Corporation | ref pa# 201808036432 & soft story retrofit per ab-107 & accessability improvementDetails
ref pa# 201808036432 & soft story retrofit per ab-107 & accessability improvement | |
| Nov 5, 2019 | Completed final sign-off Jun 2020 | 1894 Great Hy | Connor Daly Corporation | remove and replace existing stucco facing great highway and ortega. remove and replace siding at rear of building. replace existing non-historic windows (18) with new fiberglass sash to match existing.Details
remove and replace existing stucco facing great highway and ortega. remove and replace siding at rear of building. replace existing non-historic windows (18) with new fiberglass sash to match existing. | $20,000 |
| Nov 1, 2019 | Never finaled issued Nov 2019, no final | 3625 Folsom St | Connor Daly Corporation | replace 6 rear facing windfows with energy effiencent child safe windows & water proof & seal rear facde; same size and same location.Details
replace 6 rear facing windfows with energy effiencent child safe windows & water proof & seal rear facde; same size and same location. | $6,000 |
| Oct 24, 2019 | Completed final sign-off Dec 2019 | 3481 Pierce St | Connor Daly Corporation | revision to 201901220839, new grade beam not neede along grid t4Details
revision to 201901220839, new grade beam not neede along grid t4 | |
| Oct 21, 2019 | Completed final sign-off Dec 2019 | 130 Yerba Buena Av | Connor Daly Corporation | voluntary seismic upgrade. remove partition wall in kitchen.Details
voluntary seismic upgrade. remove partition wall in kitchen. | $10,000 |
| Sep 26, 2019 | Completed final sign-off Jul 2020 | 1737 Chestnut St | Connor Daly Corporation | revision to app#201809140244. changing shear wall to frameDetails
revision to app#201809140244. changing shear wall to frame | $10,000 |
| Sep 12, 2019 | Never finaled issued Sep 2019, no final | 1020 Union St | Connor Daly Corporation | street spaceDetails
street space | |
| Sep 6, 2019 | Completed final sign-off Dec 2019 | 182 12th Av | Connor Daly Corporation | voluntary stregthening of garageDetails
voluntary stregthening of garage | $15,000 |
| Aug 27, 2019 | Completed final sign-off Oct 2019 | 1863 Pine St | Connor Daly Corporation, Mc Gowan Builders | to comply with nov # 201629391. replacement of shared foundation @ property line between 1831&1863 pine st.Details
to comply with nov # 201629391. replacement of shared foundation @ property line between 1831&1863 pine st. | |
| Aug 7, 2019 | Completed final sign-off Aug 2019 | 1817 California St | Connor Daly Corporation | revision to pa 201907176105. remodeling only 1 bath, not 1 1/2 bathsDetails
revision to pa 201907176105. remodeling only 1 bath, not 1 1/2 baths | |
| Jul 17, 2019 | Completed final sign-off Aug 2019 | 1817 California St | Connor Daly Corporation | remodel kitchen and 1.5 bathroom like for like. same layout.Details
remodel kitchen and 1.5 bathroom like for like. same layout. | $30,000 |
| Jun 5, 2019 | Completed final sign-off Aug 2019 | 735 Dolores St | Connor Daly Corporation | foundation repair to comply with nov 201935672. n/a for maher.Details
foundation repair to comply with nov 201935672. n/a for maher. | $1,000 |
| May 10, 2019 | Completed final sign-off Aug 2019 | 301 Judah St | Connor Daly Corporation | commencement of work not started under previously approved permit application's 201703131306 and 201201252902.Details
commencement of work not started under previously approved permit application's 201703131306 and 201201252902. | $45,000 |
| May 6, 2019 | Completed final sign-off Mar 2021 | 66 Eureka St | Connor Daly Corporation | remodel (e) laundry room add insulation and shear wallsDetails
remodel (e) laundry room add insulation and shear walls | $10,000 |
| May 2, 2019 | Completed final sign-off Aug 2019 | 301 Judah St | Connor Daly Corporation | revision to 201703131306/r1 replace hardy special moment frames with ordinary moment framesDetails
revision to 201703131306/r1 replace hardy special moment frames with ordinary moment frames | |
| Feb 26, 2019 | Completed final sign-off Sep 2019 | 2223 14th Av | Connor Daly Corporation | voluntary strengthening including bolts, tie downs & shearwalls, replace one window at rear.Details
voluntary strengthening including bolts, tie downs & shearwalls, replace one window at rear. | $24,000 |
| Feb 6, 2019 | Completed final sign-off Feb 2020 | 3625 Folsom St | Connor Daly Corporation | recommencement and completion of work 201708235664.Details
recommencement and completion of work 201708235664. | $2,000 |
| Feb 1, 2019 | Completed final sign-off Dec 2019 | 1570 Greenwich St | Connor Daly Corporation | capping (e) rear foundationDetails
capping (e) rear foundation | $5,000 |
| Feb 1, 2019 | Completed final sign-off Feb 2019 | 448 Haight St | Connor Daly Corporation | change of use from record store (m) to gym (b). no construction work in common areas or residential spaces. place fitness equipment in existing space.Details
change of use from record store (m) to gym (b). no construction work in common areas or residential spaces. place fitness equipment in existing space. | |
| Jan 22, 2019 | Completed final sign-off Dec 2019 | 3481 Pierce St | Connor Daly Corporation | soft story retrofit per sfebc ch 4d eng criteria 2016 cebc appendix a4 comply with nov 201803495Details
soft story retrofit per sfebc ch 4d eng criteria 2016 cebc appendix a4 comply with nov 201803495 | $120,000 |
| Jan 15, 2019 | Completed final sign-off Apr 2019 | 2206 33rd Av | Connor Daly Corporation | remodel kitchen in kind. 12x15. no structural work.Details
remodel kitchen in kind. 12x15. no structural work. | $15,000 |
| Jan 8, 2019 | Completed final sign-off Dec 2019 | 2932 Franklin St | Connor Daly Corporation | 1 bathroom repair/remodel. in-kind.Details
1 bathroom repair/remodel. in-kind. | $8,000 |
| Jan 7, 2019 | Completed final sign-off Mar 2019 | 949 Ashbury St | Connor Daly Corporation | mandatory soft story retrofit 2016 sfebc appx a4 revision "1" to (e) 201711093673 due to (e) field conditionsDetails
mandatory soft story retrofit 2016 sfebc appx a4 revision "1" to (e) 201711093673 due to (e) field conditions | $5,000 |
| Nov 27, 2018 | Completed final sign-off Jul 2022 | 2550 28th Av | Connor Daly Corporation | new vertical addition on 3rd fl. new master bedroom, new full bath,new family room addition @ 3rd fl, new interior stairs, demo selected portion of wall between kitchen and living room @ 2nd fl. new base cabinet at 2nd fl. minor excavation, remodel at 1st flDetails
new vertical addition on 3rd fl. new master bedroom, new full bath,new family room addition @ 3rd fl, new interior stairs, demo selected portion of wall between kitchen and living room @ 2nd fl. new base cabinet at 2nd fl. minor excavation, remodel at 1st fl | $400,000 |
| Oct 26, 2018 | Expired or cancelled cancelled Nov 2018 | 1878 Green St | Connor Daly Corporation | remove & repair dry rot in like kind at rear stairs. less than 50% of the staircase to be replaced. comply with nov #201891281 items 1,2,3,4.Details
remove & repair dry rot in like kind at rear stairs. less than 50% of the staircase to be replaced. comply with nov #201891281 items 1,2,3,4. | $1,000 |
| Sep 18, 2018 | Completed final sign-off Sep 2018 | 2438 28th Av | Connor Daly Corporation | to obtain a final inspection for work approved pa201404163434 & 201603232815. all work is complete.Details
to obtain a final inspection for work approved pa201404163434 & 201603232815. all work is complete. | |
| Sep 14, 2018 | Completed final sign-off Jul 2020 | 1737 Chestnut St | Connor Daly Corporation | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. | $75,810 |
| Sep 13, 2018 | Completed final sign-off Apr 2020 | 1020 Union St | Connor Daly Corporation | compliance with mandatory soft story program, 2016 cebc appendix a-4Details
compliance with mandatory soft story program, 2016 cebc appendix a-4 | $120,000 |
| Sep 10, 2018 | Expired or cancelled cancelled Jan 2026 | 2932 Franklin St | Connor Daly Corporation | interior remodel - convert basement to addition to 2nd floor unitDetails
interior remodel - convert basement to addition to 2nd floor unit | $29,000 |
| May 23, 2018 | Completed final sign-off Sep 2018 | 1119 Mendell St | Connor Daly Corporation | voluntary seismic retrofit - cbc 2016 a3 prescriptive provisions.Details
voluntary seismic retrofit - cbc 2016 a3 prescriptive provisions. | $8,000 |
| May 7, 2018 | Completed final sign-off Mar 2022 | 2847 Fillmore St | Connor Daly Corporation | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. | $90,000 |
| Mar 15, 2018 | Completed final sign-off Mar 2021 | 141 Retiro Wy | Connor Daly Corporation | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. n/a for maherDetails
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. n/a for maher | $40,000 |