Block 4259, lot 052
1376 De Haro St
- City’s use
- Single Family Residential
- Built
- 1987
- Stories
- 2
- Units
- 1
- Rooms
- 3 bedrooms, 3 bathrooms
- Building
- 1,500 sq ft
- Lot
- 1,642 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 9, 2024 | Completed final sign-off Aug 2024 | 1376 De Haro St | Jpg Home Improvement Inc | unit #100: repair the front balcony in kind for the dry rot. less than 25%Details
unit #100: repair the front balcony in kind for the dry rot. less than 25% | $2,000 |
| Apr 21, 2021 | Completed final sign-off Jun 2021 | 1376 De Haro St | Jemico Llc Dba Renewal By Andersen Of Sf | replacing 1 sliding patio door, in kind, retrofit fashion, non street visible.exiting vinyl, proposed wood compositeDetails
replacing 1 sliding patio door, in kind, retrofit fashion, non street visible.exiting vinyl, proposed wood composite | $9,039 |
| Aug 22, 2020 | Completed final sign-off Jan 2021 | 1376 De Haro St | Connor Daly Corporation | replace in kind 3 rear cantilever decks.Details
replace in kind 3 rear cantilever decks. | $10,000 |
| Jul 22, 2020 | Completed final sign-off Nov 2020 | 1376 De Haro St | Jpg Home Improvement Inc | bathroom remodel in-kind. no change to flooe plan. replace fixtures, re-tile shower & floor. replace 2 vanity lights, keep exhaust fan.Details
bathroom remodel in-kind. no change to flooe plan. replace fixtures, re-tile shower & floor. replace 2 vanity lights, keep exhaust fan. | $15,000 |
| Jul 21, 2015 | Completed final sign-off Aug 2015 | 1376 De Haro St | Charles Window & Door/Golden Gate Home I | renew permit #200910098747Details
renew permit #200910098747 | |
| Sep 6, 2011 | Completed final sign-off Oct 2011 | 1376 De Haro St | kitchen remodeling. replace kitchen cabinets; install two (2) additional gfci outlets; install replacement sink, disposal, oven, cook top and trash compactor; install replacement counter top. no change in opening, door or wall layout. (kitchen on 2nd story). a minmum of 50% of the total ratedDetails
kitchen remodeling. replace kitchen cabinets; install two (2) additional gfci outlets; install replacement sink, disposal, oven, cook top and trash compactor; install replacement counter top. no change in opening, door or wall layout. (kitchen on 2nd story). a minmum of 50% of the total rated | $25,000 | |
| Oct 9, 2009 | Expired or cancelled expired Aug 2015 | 1376 De Haro St | Charles Window & Door/Golden Gate Home I | re-siding back of the house.Details
re-siding back of the house. | $15,000 |
| Apr 11, 2005 | Never finaled issued Apr 2005, no final | 1376 De Haro St | West Coast Roofing Company | garage door replacementDetails
garage door replacement | $1,904 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Charles Window & Door/Golden Gate Home I (2), Jpg Home Improvement Inc (2), Connor Daly Corporation, Jemico Llc Dba Renewal By Andersen Of Sf, West Coast Roofing Company
- Engineers
- Daniel Barringer
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.