Block 1362, lot 033
128 03rd Ave
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 2
- Units
- 2
- Rooms
- 3 bedrooms, 2 bathrooms
- Building
- 1,726 sq ft
- Lot
- 3,000 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 30, 2022 | Completed final sign-off Sep 2022 | 128 03rd Av | Santos Construction | remodel (e) hall bath, replace tub with shower in primary bath @ 3rd fl.Details
remodel (e) hall bath, replace tub with shower in primary bath @ 3rd fl. | $45,000 |
| Aug 18, 2020 | Never finaled issued Aug 2020, no final | 128 03rd Av | Connor Daly Corporation | remove & replace siding at side and rear of building. 1200 sqft (not visible st)Details
remove & replace siding at side and rear of building. 1200 sqft (not visible st) | $10,000 |
| Jul 31, 2008 | Never finaled issued Jul 2008, no final | 128 03rd Av | street space permit only.Details
street space permit only. | ||
| Jun 10, 2008 | Expired or cancelled cancelled Mar 2009 | 128 03rd Av | Bachelder And Associates | work to be performed at 128 - 3rd av.: expand (e) deck 4 1/2 feet to rear. reconfigure (e) exterior stairway, revision to pa# 2008-0519-2388Details
work to be performed at 128 - 3rd av.: expand (e) deck 4 1/2 feet to rear. reconfigure (e) exterior stairway, revision to pa# 2008-0519-2388 | $28,000 |
| May 19, 2008 | Completed final sign-off Nov 2008 | 128 03rd Av | Bachelder And Associates | remodel kitchen and 2 bathroom and closets @ upper level, partial wall removal between kitchen & family room, add coat closet, open wall @ stairwell into dining room.Details
remodel kitchen and 2 bathroom and closets @ upper level, partial wall removal between kitchen & family room, add coat closet, open wall @ stairwell into dining room. | $150,000 |
| Aug 27, 2007 | Completed final sign-off Sep 2007 | 128 03rd Av | Arnest Termite Control | as per arest inspections report #2126 items no 1,2,3,4,5 (termite repair) dryrot repairDetails
as per arest inspections report #2126 items no 1,2,3,4,5 (termite repair) dryrot repair | $10,650 |
| Nov 2, 2005 | Expired or cancelled expired Feb 2010 | 128 03rd Av | A B C Window Contractors | install 1 vinyl window in kind into (e)frame.no change in size/location.window does not face street.if applicable,bedroom windows will comply with section 310.4 for rescue.Details
install 1 vinyl window in kind into (e)frame.no change in size/location.window does not face street.if applicable,bedroom windows will comply with section 310.4 for rescue. | $466 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Bachelder And Associates (2), A B C Window Contractors, Arnest Termite Control, Connor Daly Corporation, Santos Construction
- Architects
- Fareed Himmati
- Engineers
- Fareed Himmati
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.