Cassandra Mettling-Davis
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Cassandra Mettling Davis
- Based in
- San Francisco
- On San Francisco permits
- May 2004 to Oct 2026
175 permits since 2000 (architect on 165 permits, authorized agent-others on 10 permits, designer on 2 permits, engineer on 2 permits): 127 completed, 18 in progress, 7 never finaled, 23 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 175.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 2765 Greenwich St | Cs Construction Co | remodel kitchen and 3rd floor bathrooms. add powder room at 1/f. remove wall between kitchen and breakfast room.Details
remodel kitchen and 3rd floor bathrooms. add powder room at 1/f. remove wall between kitchen and breakfast room. | $249,069 |
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 2765 Greenwich St | Cs Construction Co | replace windows at front and rear facades. new sliding glass doors at 1st and 2nd floors. new garage door in (e) opening. replace roof shingles with standing seam metal roof.Details
replace windows at front and rear facades. new sliding glass doors at 1st and 2nd floors. new garage door in (e) opening. replace roof shingles with standing seam metal roof. | $26,233 |
| Aug 28, 2026 | In progress issued Aug 2026 | 207 Juanita Wy | Cs Construction Co | 1st fl: reconfigure layout of ground fl rooms, excavate for 7'6 min clg height, connect portion of utility area, crawl space and garage to conditioned space (134 sf total) 2nd fl: new interior stairsDetails
1st fl: reconfigure layout of ground fl rooms, excavate for 7'6 min clg height, connect portion of utility area, crawl space and garage to conditioned space (134 sf total) 2nd fl: new interior stairs | $289,176 |
| Aug 28, 2026 | In progress issued Aug 2026 | 207 Juanita Wy | Cs Construction Co | new exterior windows - north elev - replace w/n (e) openings w/ fiberglass windows. south elev: relocation of two windows, replace door w/ window & one new window.Details
new exterior windows - north elev - replace w/n (e) openings w/ fiberglass windows. south elev: relocation of two windows, replace door w/ window & one new window. | $9,410 |
| Jul 1, 2026 | In progress filed Jul 2026, not yet issued | 230 Kirkham St | horizontal addition, 2nd flr wood deck w/ stairs to grade & interior remodel. 1st flr: rear addition with family room, bathroom, and wet bar. new low deck with steps to grade. interior stair to second floor. 2nd flr: new interior stairs. rear addition with remodeled kitchen and dining area.Details
horizontal addition, 2nd flr wood deck w/ stairs to grade & interior remodel. 1st flr: rear addition with family room, bathroom, and wet bar. new low deck with steps to grade. interior stair to second floor. 2nd flr: new interior stairs. rear addition with remodeled kitchen and dining area. | $365,742 | |
| May 27, 2026 | In progress issued May 2026 | 75 San Jacinto Wy | Palacios Construction | interior remodel including kitchen remodel, 3 bathroom remodels, 1 new bathroom, interior stair replacement, replace windows through out. windows that can be seen from the street are being replaced in- kind with new wood windows to match existing insulate all exterior wallsDetails
interior remodel including kitchen remodel, 3 bathroom remodels, 1 new bathroom, interior stair replacement, replace windows through out. windows that can be seen from the street are being replaced in- kind with new wood windows to match existing insulate all exterior walls | $513,093 |
| May 22, 2026 | In progress issued Jun 2026 | 126 Wawona St | Macken Construction | 1st flr interior - no work. 2nd floor interior - remodel hall bath in-kind; extend pr bath into adjacent closet & remodel. exterior - replace exterior front entry stairs in-kind.Details
1st flr interior - no work. 2nd floor interior - remodel hall bath in-kind; extend pr bath into adjacent closet & remodel. exterior - replace exterior front entry stairs in-kind. | $67,171 |
| May 21, 2026 | In progress issued May 2026 | 1670 11th Av | Opus Pacific Development | remodel ground floor for new media room, office, bathroom, laundry and storage.Details
remodel ground floor for new media room, office, bathroom, laundry and storage. | $197,663 |
| Jan 29, 2026 | In progress issued Feb 2026 | 2467 35th Av | Fog Horn Builders Inc | add 2nd fl deck & stair to grade. remove (e) stair & infill corner of bldg on both floors. at 1st floor relocate bathroom & add powder room; add mudroom w/kitchenette; (e) bedroom to be enlarged & family room to remain. ref pa 9405612 for ground floor (e) conditions; at 2nd floor remodel & enlargeDetails
add 2nd fl deck & stair to grade. remove (e) stair & infill corner of bldg on both floors. at 1st floor relocate bathroom & add powder room; add mudroom w/kitchenette; (e) bedroom to be enlarged & family room to remain. ref pa 9405612 for ground floor (e) conditions; at 2nd floor remodel & enlarge | $299,026 |
| Dec 16, 2025 | In progress issued Mar 2026 | 581 Belvedere St | Cs Construction Co | 1st floor / basement:convert (e)rooms to adu per state adu program (gov't code 66323): adu sq. ft. if 656 total (180 of that is new); new 37 sq. ft. deck at rear yard for ladder pathway.1st flr voluntary lateral strengthening. no work on 2nd & 3rd floors (e)building not sprinklered & does not have aDetails
1st floor / basement:convert (e)rooms to adu per state adu program (gov't code 66323): adu sq. ft. if 656 total (180 of that is new); new 37 sq. ft. deck at rear yard for ladder pathway.1st flr voluntary lateral strengthening. no work on 2nd & 3rd floors (e)building not sprinklered & does not have a | $120,234 |
| Dec 10, 2025 | In progress issued Dec 2025 | 163 Marietta Dr | Ryan Construction | revision to 202507080306: deck stair changes position, 1st/f deck decreased in size, storage fl deck increases in size, firewall switches to opposite side, add powder room, space conditioning & new window to storage/f. no increase in floor area, replace central bearing wall w/ new beam, ssd.Details
revision to 202507080306: deck stair changes position, 1st/f deck decreased in size, storage fl deck increases in size, firewall switches to opposite side, add powder room, space conditioning & new window to storage/f. no increase in floor area, replace central bearing wall w/ new beam, ssd. | $15,735 |
| Oct 30, 2025 | Completed final sign-off Feb 2026 | 723 41st Av | Sheeran Builders | revision to 202504033617. at 2nd flr bedroom #1, replace (e) door w/new window. remove (e) stair landing.Details
revision to 202504033617. at 2nd flr bedroom #1, replace (e) door w/new window. remove (e) stair landing. | $500 |
| Oct 23, 2025 | Completed final sign-off Aug 2026 | 806 Noe St | 415 Design+Build | horizontal infill addition - convert recessed porch into habitable space (n) exterior spiral stair to grade. 1st flr- as required to bring down structural loads. 2nd flr - convert porch to habitable; remove wall btwn kitchen and dining. 3rd flr no work.Details
horizontal infill addition - convert recessed porch into habitable space (n) exterior spiral stair to grade. 1st flr- as required to bring down structural loads. 2nd flr - convert porch to habitable; remove wall btwn kitchen and dining. 3rd flr no work. | $101,013 |
| Sep 25, 2025 | Expired or cancelled cancelled Oct 2025 | 581 Belvedere St | 1st floor/basemt: convert (e) rooms to adu per state adu; adu sq ft is 656 total (180 of that is new); new 37 sf deck @ rear yard for ladder pathway; voluntary lateral strengthening. (e) building is not sprinklered & does not have a manual fire alarm system. building will remain unsprinklered.Details
1st floor/basemt: convert (e) rooms to adu per state adu; adu sq ft is 656 total (180 of that is new); new 37 sf deck @ rear yard for ladder pathway; voluntary lateral strengthening. (e) building is not sprinklered & does not have a manual fire alarm system. building will remain unsprinklered. | $45,984 | |
| Jul 30, 2025 | Completed final sign-off Jun 2026 | 990 Rhode Island St | Alef Construction Corp | horizontal addition at rear yard within 1 story 12' pop out areaDetails
horizontal addition at rear yard within 1 story 12' pop out area | $26,668 |
| Jul 16, 2025 | In progress issued Oct 2025 | 163 Marietta Dr | Ryan Construction | expand 1/f into garage leaving compact parking space. add intermediate floor for storage into crawlspace, new first floor deck with stair to grade. new grade level deck. add new skylight and raised parapet.Details
expand 1/f into garage leaving compact parking space. add intermediate floor for storage into crawlspace, new first floor deck with stair to grade. new grade level deck. add new skylight and raised parapet. | $143,374 |
| Jun 26, 2025 | Completed final sign-off Feb 2026 | 72 Burlwood Dr | Cs Construction Co | kitchen remodel, open wall to dining room, relocate powder room to garageDetails
kitchen remodel, open wall to dining room, relocate powder room to garage | $93,615 |
| May 30, 2025 | In progress issued May 2025 | 730 42nd Av | Jakcon, Inc | revision to pa#202011239558: change to north foundation (e) foundation to remain with new foundation added inside of it. shoring plans added.Details
revision to pa#202011239558: change to north foundation (e) foundation to remain with new foundation added inside of it. shoring plans added. | |
| May 1, 2025 | Completed final sign-off May 2026 | 2630 25th Av | Fog Horn Builders Inc | 2nd fl: horizontal addition to enlarge (e) bedroom, add (n) bathroom at interior, (n) deck at the rear. 1st fl: no work except 1 hr wall & deck postsDetails
2nd fl: horizontal addition to enlarge (e) bedroom, add (n) bathroom at interior, (n) deck at the rear. 1st fl: no work except 1 hr wall & deck posts | $65,241 |
| Apr 24, 2025 | In progress issued Apr 2025 | 2643 16th Av | Kriscraft Llc | revision to pa # 2022-0208-7597 -s1: relocate interior stair and 2nd fl bathroom, remove wall adjacent to media room and replace rear exterior door with casement windowDetails
revision to pa # 2022-0208-7597 -s1: relocate interior stair and 2nd fl bathroom, remove wall adjacent to media room and replace rear exterior door with casement window | |
| Apr 24, 2025 | Completed final sign-off Jun 2026 | 225 Teresita Bl | Cs Construction Co | basement level - primary bath & laundry room addition. 1st fl - no work; 2nd fl - no workDetails
basement level - primary bath & laundry room addition. 1st fl - no work; 2nd fl - no work | $74,408 |
| Apr 3, 2025 | Completed final sign-off Feb 2026 | 723 41st Av | Sheeran Builders | new roof deck and spiral stairs to gradeDetails
new roof deck and spiral stairs to grade | $23,990 |
| Mar 17, 2025 | Completed final sign-off Apr 2026 | 1686 Hayes St | Stanley Nicholas Grgich | 1686a hayes st: new state adu at ground floor of (e) multifamily building. sprinklers under separate permit.Details
1686a hayes st: new state adu at ground floor of (e) multifamily building. sprinklers under separate permit. | $97,825 |
| Feb 7, 2025 | Completed final sign-off Sep 2025 | 2159 29th Av | Rua Woods Construction Inc | revision to pa # 2024-0909-0305 excavate at crawlspace to create storage room & shearwall modificationDetails
revision to pa # 2024-0909-0305 excavate at crawlspace to create storage room & shearwall modification | $15,000 |
| Oct 15, 2024 | Completed final sign-off Oct 2024 | 1215 De Haro St | comply w/nov 202040234 to remove non permitted non complaint wood structure at rear of buliding. remove wood stair accessing elevated rear yard. no work at interior of bulding . no work visible from street.Details
comply w/nov 202040234 to remove non permitted non complaint wood structure at rear of buliding. remove wood stair accessing elevated rear yard. no work at interior of bulding . no work visible from street. | $200 | |
| Sep 9, 2024 | Completed final sign-off Sep 2025 | 2159 29th Av | Rua Woods Construction Inc | 1st floor:expand conditioned area and remodel existing rooms down to add 2nd bedroom, two bathrooms, & media room. add deck and stair to grade with hot tub. 2nd floor: work limited to rear yard facing window replacment. no work visible from the street.Details
1st floor:expand conditioned area and remodel existing rooms down to add 2nd bedroom, two bathrooms, & media room. add deck and stair to grade with hot tub. 2nd floor: work limited to rear yard facing window replacment. no work visible from the street. | $258,000 |
| Jul 23, 2024 | Completed final sign-off May 2025 | 2682 17th Av | Rua Woods Construction Inc | revision to pa 202306059268 reduction of scope. 1st fl - (n) wood flooring @ office; 2nd fl - fill in south lightwell, remodel kitchenDetails
revision to pa 202306059268 reduction of scope. 1st fl - (n) wood flooring @ office; 2nd fl - fill in south lightwell, remodel kitchen | |
| Jul 3, 2024 | Completed final sign-off Mar 2025 | 1602 Treat Av | Keightley Builders Inc | (ab1114) complying with nov# 202286516. 1/f: legalize (e) unit through state adu program 65852.2 . add sheetrock where indicated, vent hood to exterior, replace floor mouted toilet with wall hung, add minisplit heat pump and new water heater: no work at 2/f & 3/f. (adu accessory to 1602b 3/f unit)Details
(ab1114) complying with nov# 202286516. 1/f: legalize (e) unit through state adu program 65852.2 . add sheetrock where indicated, vent hood to exterior, replace floor mouted toilet with wall hung, add minisplit heat pump and new water heater: no work at 2/f & 3/f. (adu accessory to 1602b 3/f unit) | $11,123 |
| Apr 9, 2024 | Completed final sign-off Mar 2025 | 357 Carl St | kitchen & bathroom remodel. replace rear windows in-kind at rear of building. replace (e) rear door, like for like. no changes to front of buildingDetails
kitchen & bathroom remodel. replace rear windows in-kind at rear of building. replace (e) rear door, like for like. no changes to front of building | $82,234 | |
| Mar 11, 2024 | Completed final sign-off Nov 2025 | 425 Staples Av | Eg Construction Inc | horizontal addition, 2nd floor wood deck with stairs to grade and interior remodel.Details
horizontal addition, 2nd floor wood deck with stairs to grade and interior remodel. | $352,777 |
| Mar 7, 2024 | In progress issued Mar 2024 | 554 Bella Vista Wy | new wood deck at 2nd floor rear yard and stairs to grade; new sliding door for deck access.Details
new wood deck at 2nd floor rear yard and stairs to grade; new sliding door for deck access. | $34,377 | |
| Dec 12, 2023 | Completed final sign-off Nov 2024 | 2471 35th Av | Cs Construction Co | 1/f: reconfigure room at 1/f, remodel bathroom. 2/f: no work. rear window reconfiguration.Details
1/f: reconfigure room at 1/f, remodel bathroom. 2/f: no work. rear window reconfiguration. | $184,352 |
| Dec 7, 2023 | Completed final sign-off Sep 2025 | 16 Sherwood Ct | Opus Pacific Development | 2/f remove wall between kitchen & dining/ living areas, remodel kitchen, new exterior folding door to new rear yard deck & stairs to grade.Details
2/f remove wall between kitchen & dining/ living areas, remodel kitchen, new exterior folding door to new rear yard deck & stairs to grade. | $80,759 |
| Sep 12, 2023 | Completed final sign-off Apr 2024 | 327 Jersey St | Opus Pacific Development | 1st fl voluntary shear wall (n) heat pump 2nd fl. remodel and enlarge kithen 2'-0" towards pantry wall change the (e) door opening to the rear yard to a single frnch door w/side lightsDetails
1st fl voluntary shear wall (n) heat pump 2nd fl. remodel and enlarge kithen 2'-0" towards pantry wall change the (e) door opening to the rear yard to a single frnch door w/side lights | $73,400 |
| Aug 15, 2023 | Completed final sign-off Jun 2024 | 435 Fair Oaks St | Opus Pacific Development | 1st fl: lower slab of storage room & convert to media room. add window, relocate furnace. add counter top & cooktop to (e) kitchenette. 2nd & 3rd fls-no work.Details
1st fl: lower slab of storage room & convert to media room. add window, relocate furnace. add counter top & cooktop to (e) kitchenette. 2nd & 3rd fls-no work. | $76,775 |
| Jun 26, 2023 | Completed final sign-off Dec 2023 | 4006 22nd St | Fox Brothers Construction Inc | revision to bpa#202101293668, reduce scope of work to remove all work @ front portion of building, reduce amount of new fundation @ kitchen & change roof over kitchen to shed room. no work is visible from streetDetails
revision to bpa#202101293668, reduce scope of work to remove all work @ front portion of building, reduce amount of new fundation @ kitchen & change roof over kitchen to shed room. no work is visible from street | |
| Jun 5, 2023 | Completed final sign-off May 2025 | 2682 17th Av | Rua Woods Construction Inc | 1st fl: convert portion of garage to mudroom/laundry rm. 2nd fl: fill in south lightwell entirely to expand kitchen and remodel kitchenl raise floor of north lightwell & expand for headroom at new interior stairs.Details
1st fl: convert portion of garage to mudroom/laundry rm. 2nd fl: fill in south lightwell entirely to expand kitchen and remodel kitchenl raise floor of north lightwell & expand for headroom at new interior stairs. | $122,819 |
| May 10, 2023 | In progress issued Oct 2024 | 3216 24th St | Pio Mcgarr Inc | to erect a 3-story, type v-b mixed used building, 2-dwelling units, r-3, b, m.Details
to erect a 3-story, type v-b mixed used building, 2-dwelling units, r-3, b, m. | $637,348 |
| May 10, 2023 | Never finaled filed May 2023, never issued | 3214 24th St | Pio Mcgarr Inc | demolition of a type 5b 1 story retailDetails
demolition of a type 5b 1 story retail | $9,917 |
| May 10, 2023 | In progress issued Oct 2024 | 3208 24th St | Pio Mcgarr Inc | demolition of 2nd floor sunporch that extends over 3214-3216 24th st. close up doorway with rated wall.Details
demolition of 2nd floor sunporch that extends over 3214-3216 24th st. close up doorway with rated wall. | $2,000 |
| Mar 7, 2023 | Completed final sign-off Oct 2023 | 342 Los Palmos Dr | Opus Pacific Development | 2nd fl - remoel (e) kitchen, replace (e) door & window @ rear yard; remove interior wallDetails
2nd fl - remoel (e) kitchen, replace (e) door & window @ rear yard; remove interior wall | $47,500 |
| Dec 15, 2022 | Completed final sign-off Mar 2024 | 428 Molimo Dr | Jakcon, Inc | create level 1st flr to include family room, office, & bathroom. reconfifure interior stair & 2nd flr powder room. add new ground flr deck (less than 3' from grade) and reduce depth of e 2nd flr deck.Details
create level 1st flr to include family room, office, & bathroom. reconfifure interior stair & 2nd flr powder room. add new ground flr deck (less than 3' from grade) and reduce depth of e 2nd flr deck. | $118,633 |
| Oct 25, 2022 | Completed final sign-off Jun 2024 | 3830 Judah St | Rua Woods Construction Inc | unit legalization per 43-14. at 1st flr, reconfigure (e) bathroom, add kitchen cabinets, add bedroom closet to legalize unit. reconfigure rear yard stairs to comply with code. extend deck landings for bedroom egress/rescure.Details
unit legalization per 43-14. at 1st flr, reconfigure (e) bathroom, add kitchen cabinets, add bedroom closet to legalize unit. reconfigure rear yard stairs to comply with code. extend deck landings for bedroom egress/rescure. | $110,442 |
| Jul 29, 2022 | Completed final sign-off Feb 2024 | 641 Victoria St | Cs Construction Co | 1st/f: replace (e) interior stair connecting 1stst & 2nd fl. remodel full bath, replace portion of concrete slab, (n) beams, extend hydronic heat. 2nd/f: remodel kitchen, relocate powder rm, window replace. 3rd/f: remodel bath, add new bath.Details
1st/f: replace (e) interior stair connecting 1stst & 2nd fl. remodel full bath, replace portion of concrete slab, (n) beams, extend hydronic heat. 2nd/f: remodel kitchen, relocate powder rm, window replace. 3rd/f: remodel bath, add new bath. | $192,095 |
| Jul 29, 2022 | Expired or cancelled cancelled Jan 2026 | 843 Capp St | Bernhardt Remodeling | revision to permit #202011239549, with revised plans, no new stairs or side gate.Details
revision to permit #202011239549, with revised plans, no new stairs or side gate. | |
| May 24, 2022 | Expired or cancelled cancelled Jan 2026 | 258 28th Av | Mccormack Construction | convert ground fl. storage room to family room, closet and storage lower floor level at front portion of 1st fl. new bathroomDetails
convert ground fl. storage room to family room, closet and storage lower floor level at front portion of 1st fl. new bathroom | $153,017 |
| Apr 19, 2022 | Completed final sign-off Nov 2023 | 4276 22nd St | Level 8 Construction Inc | srev to pa 2021.0618.2771 per inspectors comments. 1st flr change to location of rear exterior stairs to grade. 2nd flr change to interior parition layout @ front bedroom, add'l structural beams at great room.Details
srev to pa 2021.0618.2771 per inspectors comments. 1st flr change to location of rear exterior stairs to grade. 2nd flr change to interior parition layout @ front bedroom, add'l structural beams at great room. | |
| Apr 11, 2022 | Completed final sign-off Apr 2024 | 24 Santa Marina St | Competente Construction Inc | revision per inspector to permit 202011239538. & 2021 0526 1108; 1/f: new door to exerior for utility closet. 2/f: close off exterior door at laundry room. no work is visible from street.Details
revision per inspector to permit 202011239538. & 2021 0526 1108; 1/f: new door to exerior for utility closet. 2/f: close off exterior door at laundry room. no work is visible from street. | |
| Mar 25, 2022 | Completed final sign-off Jun 2023 | 743 Foerster St | Ryan Construction | 1st fl: reconfigure (e) full bath & storage. expand entry area into garage. 2nd fl: remodel (e) bathroom.Details
1st fl: reconfigure (e) full bath & storage. expand entry area into garage. 2nd fl: remodel (e) bathroom. | $46,187 |
| Mar 22, 2022 | Completed final sign-off Jun 2023 | 883 Treat Av | Pio Mcgarr Inc | revision to pa# 202203079326. 2nd fl: infill north lightwell.Details
revision to pa# 202203079326. 2nd fl: infill north lightwell. | |
| Mar 8, 2022 | Never finaled issued Mar 2022, no final | 288 Juanita Wy | Opus Pacific Development | revision to pa# 202112134242. 1st fl: replace (e) front exterior stairs in-kind. 2nd fl: extend roof to create cover over front porch.Details
revision to pa# 202112134242. 1st fl: replace (e) front exterior stairs in-kind. 2nd fl: extend roof to create cover over front porch. | $11,389 |
| Mar 7, 2022 | Completed final sign-off Jun 2023 | 883 Treat Av | Pio Mcgarr Inc | 2nd fl: remodel (e) kitchen and (e) bathroom. add skylights. infill lightwells. new powder room. window replacement. no work visible from street.Details
2nd fl: remodel (e) kitchen and (e) bathroom. add skylights. infill lightwells. new powder room. window replacement. no work visible from street. | $73,867 |
| Feb 22, 2022 | Completed final sign-off Jun 2024 | 3035 23rd St | Competente Construction Inc | 1/f: fill in area under (e) 2/f sunroom & convert portion of storage room to create family room, fulll bathroom & laundry. lower slab for finished ceiling ht 8-0. 2/f: remodel (e) kitchen & bathroom, new interior stairs.Details
1/f: fill in area under (e) 2/f sunroom & convert portion of storage room to create family room, fulll bathroom & laundry. lower slab for finished ceiling ht 8-0. 2/f: remodel (e) kitchen & bathroom, new interior stairs. | $191,135 |
| Feb 8, 2022 | Never finaled issued Jan 2023, no final | 2643 16th Av | Kriscraft Llc | 1st floor: ground floor development includes new bedroom, closet, 1 1/2 bathrooms, study and family room. one story rear addition and infill under sunroom. new interior stair. rated exit corridor added to garage 2nd floor: remodel (e) kitchen and (e) bathroom, add skylightsDetails
1st floor: ground floor development includes new bedroom, closet, 1 1/2 bathrooms, study and family room. one story rear addition and infill under sunroom. new interior stair. rated exit corridor added to garage 2nd floor: remodel (e) kitchen and (e) bathroom, add skylights | $194,727 |
| Dec 13, 2021 | Never finaled issued Dec 2021, no final | 288 Juanita Wy | Opus Pacific Development | 1/f: convert portion of garage and remodel (e) office to new office/bedroom and new full bath. 2/f: remove wall between breakfast romm and kitchen for new larger kitchen. enlarge and remodel (e) bath, new 2/f deck and stairs at rear yard.Details
1/f: convert portion of garage and remodel (e) office to new office/bedroom and new full bath. 2/f: remove wall between breakfast romm and kitchen for new larger kitchen. enlarge and remodel (e) bath, new 2/f deck and stairs at rear yard. | $159,029 |
| Nov 12, 2021 | Completed final sign-off Mar 2024 | 466 Country Club Dr | remodel interior inlcuding new interior & elevator. add new bath,relocate(e)bathroom, & remodel kitchen. exterior stair & chimney to be removed. replace front windows. replace garage door.Details
remodel interior inlcuding new interior & elevator. add new bath,relocate(e)bathroom, & remodel kitchen. exterior stair & chimney to be removed. replace front windows. replace garage door. | $126,124 | |
| Nov 12, 2021 | Completed final sign-off Sep 2023 | 1343 39th Av | Cs Construction Co | this permit is revision to permit #2021/0909/8028, portion of ground floor previously designed to be a raised floor, now will be a new slab-on-grade. add wet bar.Details
this permit is revision to permit #2021/0909/8028, portion of ground floor previously designed to be a raised floor, now will be a new slab-on-grade. add wet bar. | $5,020 |
| Sep 20, 2021 | Completed final sign-off Jul 2022 | 14 Starview Wy | Rua Woods Construction Inc | first floor: no work. 2nd floor: remodel & expand kitchen into adj. closet, remove wall between kitchen & dining room, remodel & expand bath ~8" into space of adj. bedroom, relocate bedroom closet.Details
first floor: no work. 2nd floor: remodel & expand kitchen into adj. closet, remove wall between kitchen & dining room, remodel & expand bath ~8" into space of adj. bedroom, relocate bedroom closet. | $47,660 |
| Sep 9, 2021 | Completed final sign-off Sep 2023 | 1343 39th Av | Cs Construction Co | 1/f: infill south lightwell and convert portion of garage to master suite and family room, new rear yard deck and stairs to grade. 2/f: extend covered porch at south lightwell, infill north lightwell, remodel (e) kitchen and (e) bathroom.Details
1/f: infill south lightwell and convert portion of garage to master suite and family room, new rear yard deck and stairs to grade. 2/f: extend covered porch at south lightwell, infill north lightwell, remodel (e) kitchen and (e) bathroom. | $179,613 |
| Jul 29, 2021 | Completed final sign-off Jan 2022 | 27 Los Palmos Dr | Doyle Developments | remodel bathroom at 1st fl.Details
remodel bathroom at 1st fl. | $17,731 |
| Jun 25, 2021 | Completed final sign-off Mar 2022 | 39 Rosewood Dr | Gill Construction | interior remodel including family room, 2nd fl powder room, erd fl bath, no struc changes. remodel kitchen and widen doorway between kitchen and dining roomDetails
interior remodel including family room, 2nd fl powder room, erd fl bath, no struc changes. remodel kitchen and widen doorway between kitchen and dining room | $114,235 |
| Jun 18, 2021 | Completed final sign-off Dec 2023 | 4276 22nd St | Level 8 Construction Inc | new stair connecting 1st, 2nd, 3rd fl. 1st fl - lower slab height @ back half, new flush beam @ media/multi purpose rm; remove (e) half bath & add f ull bath. 2nd fl - create(n) room in space of (e) bedrm & mud rm. remodel (e) bathrm, (n) stairs to grade from (e) deckDetails
new stair connecting 1st, 2nd, 3rd fl. 1st fl - lower slab height @ back half, new flush beam @ media/multi purpose rm; remove (e) half bath & add f ull bath. 2nd fl - create(n) room in space of (e) bedrm & mud rm. remodel (e) bathrm, (n) stairs to grade from (e) deck | $158,885 |
| May 26, 2021 | Completed final sign-off Oct 2022 | 24 Santa Marina St | Competente Construction Inc | revision to app# 202011239538: at 1st floor- new stairs to 2nd floor,remove exterior stair. at 2nd floor- remodel bathroom, remove wall between family room and bedroom, add new windows @ living room, add closetst to m. bedroom.Details
revision to app# 202011239538: at 1st floor- new stairs to 2nd floor,remove exterior stair. at 2nd floor- remodel bathroom, remove wall between family room and bedroom, add new windows @ living room, add closetst to m. bedroom. | $21,137 |
| Feb 12, 2021 | Completed final sign-off Mar 2022 | 39 Rosewood Dr | Gill Construction | replace garage door. remove & replace garage door projection/trim. areplace window to right of front door. add pathway lights.Details
replace garage door. remove & replace garage door projection/trim. areplace window to right of front door. add pathway lights. | $3,500 |
| Feb 12, 2021 | Expired or cancelled withdrawn Jun 2021 | 3035 23rd St | replace existing 8' high fence at east property line. replace existing 10' fence at south property line.Details
replace existing 8' high fence at east property line. replace existing 10' fence at south property line. | $2,000 | |
| Jan 29, 2021 | Completed final sign-off Dec 2023 | 4006 22nd St | Fox Brothers Construction Inc | infill lightwell on both sides of kitchen to add 31.5 sf. remodel kitchen and replace roof, wall in doorway and raise floor of entry hall. remove wall between entry hall and bedroom/living room. remodel bathroom and relocate laundry. no work is visible from the street.Details
infill lightwell on both sides of kitchen to add 31.5 sf. remodel kitchen and replace roof, wall in doorway and raise floor of entry hall. remove wall between entry hall and bedroom/living room. remodel bathroom and relocate laundry. no work is visible from the street. | $42,397 |
| Nov 23, 2020 | In progress issued Apr 2025 | 730 42nd Av | Jakcon, Inc | 1st flr: develop garage/storage to 2 bedrooms, 1.5 bathrooms, family room with kitchenette & storage room to be used as rooms down for single family residence. excavate where needed to attain 8'-0" finished ceiling. 2nd flr: lightwell infill & new interior stairDetails
1st flr: develop garage/storage to 2 bedrooms, 1.5 bathrooms, family room with kitchenette & storage room to be used as rooms down for single family residence. excavate where needed to attain 8'-0" finished ceiling. 2nd flr: lightwell infill & new interior stair | $90,000 |
| Nov 23, 2020 | Completed final sign-off Oct 2022 | 24 Santa Marina St | Competente Construction Inc | 1st fl: add new full bath & relocate kitchen to front of house. lower fl slab at rear of house to match (e) ceiling height at front. lower rear yard grade for new sunken patio. 2nd fl: 3 new windows in (e) openings.Details
1st fl: add new full bath & relocate kitchen to front of house. lower fl slab at rear of house to match (e) ceiling height at front. lower rear yard grade for new sunken patio. 2nd fl: 3 new windows in (e) openings. | $73,635 |
| Nov 23, 2020 | Expired or cancelled expired Apr 2026 | 843 Capp St | Bernhardt Remodeling | facade restoration (restore original cornice & some trimwork). new side yard gate, new guardrail at exterior stairs, replace exterior stairs in kind.Details
facade restoration (restore original cornice & some trimwork). new side yard gate, new guardrail at exterior stairs, replace exterior stairs in kind. | $27,700 |
| Sep 5, 2020 | Completed final sign-off Sep 2021 | 17 Greenview Ct | Cs Construction Co | 1/f: add bedroom, family, laundry rooms, full bath; 2/f: remove wall between, (e) stairs to remain & living room; at front exterior, lower will of (e) 1/f window & add (1) window.Details
1/f: add bedroom, family, laundry rooms, full bath; 2/f: remove wall between, (e) stairs to remain & living room; at front exterior, lower will of (e) 1/f window & add (1) window. | $88,941 |
| Sep 5, 2020 | Never finaled issued Jan 2021, no final | 241 Benton Av | Pio Mcgarr Inc | garage conversion to 3 bedrooms, 1 1/2 baths, new foundation, lowered slab to increase finished ceilig height to 8'Details
garage conversion to 3 bedrooms, 1 1/2 baths, new foundation, lowered slab to increase finished ceilig height to 8' | $224,882 |
| Feb 7, 2020 | Completed final sign-off Jul 2021 | 209 Nevada St | H M W Development Inc | gr fl - new master bedroom & bathroom, closets & laundry area; new interior stair from 1st to 2nd fl. 2nd fl - includes kitchen, bathroom, new doors & windows. new exterior landing less than 3' above grade. replace of treads, risers & railing @ front stairs. removal of exterior stair from rear deckDetails
gr fl - new master bedroom & bathroom, closets & laundry area; new interior stair from 1st to 2nd fl. 2nd fl - includes kitchen, bathroom, new doors & windows. new exterior landing less than 3' above grade. replace of treads, risers & railing @ front stairs. removal of exterior stair from rear deck | $115,164 |
| Dec 26, 2019 | Expired or cancelled cancelled Jul 2024 | 230 Kirkham St | erect a 3 stories,two dwelling unit, no basement residence. type 5Details
erect a 3 stories,two dwelling unit, no basement residence. type 5 | $780,245 | |
| Dec 26, 2019 | Expired or cancelled cancelled Jul 2024 | 230 Kirkham St | demolish a 2 story, no basement, single family dwelling.Details
demolish a 2 story, no basement, single family dwelling. | $7,295 | |
| Dec 13, 2019 | Completed final sign-off Jan 2024 | 378 08th Av | Mc Gowan Builders, Diviney Construction Inc | to erect a 3-story, type 5b, two residential unit building. **to comply w/ maher ord# 155-13, route to health**Details
to erect a 3-story, type 5b, two residential unit building. **to comply w/ maher ord# 155-13, route to health** | $1,200,500 |
| Dec 13, 2019 | Completed final sign-off Mar 2021 | 378 08th Av | to demolish a 3-story, type vb, singel family bldg. **maher n/a**Details
to demolish a 3-story, type vb, singel family bldg. **maher n/a** | $13,650 | |
| Dec 6, 2019 | Completed final sign-off Aug 2020 | 112 Chenery St | Gill Construction | enclose lightwell (approx 46 sf) to add a new interior stair from 1st to 2nd fl. remodel @ 2nd fl include kitchen, bathroom & new powder room, window replacement, a new skylight & 2 new solatubes.Details
enclose lightwell (approx 46 sf) to add a new interior stair from 1st to 2nd fl. remodel @ 2nd fl include kitchen, bathroom & new powder room, window replacement, a new skylight & 2 new solatubes. | $110,604 |
| Sep 23, 2019 | Completed final sign-off Feb 2021 | 372 Marietta Dr | J S B Construction, Dunros Construction | remodel & expand kitchen into adjacent room, convert portion of garage for (n) bathroom at 1st fl.Details
remodel & expand kitchen into adjacent room, convert portion of garage for (n) bathroom at 1st fl. | $64,193 |
| Aug 12, 2019 | Completed final sign-off May 2022 | 438 Melrose Av | Opus Pacific Development | vertical addition to 3rd floor. 765 sq. ft. to include 2 bedrooms & 2 bathrooms. add a roof deck over 2nd floor @ front of house. new interior stair from 2nd to 3rd floor. interior remodel @ 2nd floor inlcludes kitchen, window replacements.Details
vertical addition to 3rd floor. 765 sq. ft. to include 2 bedrooms & 2 bathrooms. add a roof deck over 2nd floor @ front of house. new interior stair from 2nd to 3rd floor. interior remodel @ 2nd floor inlcludes kitchen, window replacements. | $227,112 |
| Jun 24, 2019 | Completed final sign-off Sep 2020 | 635 Miramar Av | J S B Construction | remodel e full bath, convert linen closet area and portiion of laundry rm to new full bath.Details
remodel e full bath, convert linen closet area and portiion of laundry rm to new full bath. | $37,477 |
| Dec 11, 2018 | Completed final sign-off Oct 2019 | 2667 21st Av | Pio Mcgarr Inc | lightwell infill for new interior stairs, garage conversion to family room, bedroom, bathroomDetails
lightwell infill for new interior stairs, garage conversion to family room, bedroom, bathroom | $83,275 |
| Oct 22, 2018 | Completed final sign-off Aug 2022 | 565 Eureka St | Tracy Anthony General Contractor | rear addition @ 1st & 2nd flrs. add shed roof dormer @ roof @ rear. 1st flr to be partially excavated & developed for family rm, bdrm & bathrm. add 1/2 bath, laundry closet & sitting rm to 2nd flr & remodel kitchen. add bathrm to 3rd flr. no work visible from street.Details
rear addition @ 1st & 2nd flrs. add shed roof dormer @ roof @ rear. 1st flr to be partially excavated & developed for family rm, bdrm & bathrm. add 1/2 bath, laundry closet & sitting rm to 2nd flr & remodel kitchen. add bathrm to 3rd flr. no work visible from street. | $235,000 |
| Apr 23, 2018 | Completed final sign-off Oct 2018 | 258 28th Av | Mccormack Construction | 2nd fl - remodel (e) kitchen within the space of the (e) kitchen, study & family room; remove wall between study & family room; 1st fl - new beam/posts @ garage level to bring down loadsDetails
2nd fl - remodel (e) kitchen within the space of the (e) kitchen, study & family room; remove wall between study & family room; 1st fl - new beam/posts @ garage level to bring down loads | $35,000 |
| Apr 23, 2018 | Completed final sign-off Jan 2020 | 57 Carver St | Prince Construction Company | at ground floor development to add new media room, media room, bathroom, closets, hallway & laundry, new exterior sliding doors & window. replace concrete slab at remodel area; 2nd fl - remodel kitchen & bathroom, replace doors to deckDetails
at ground floor development to add new media room, media room, bathroom, closets, hallway & laundry, new exterior sliding doors & window. replace concrete slab at remodel area; 2nd fl - remodel kitchen & bathroom, replace doors to deck | $87,300 |
| Mar 19, 2018 | Completed final sign-off Sep 2018 | 1052 Cole St | J S B Construction | remodel (e) kitchen & enlarge opening between kitchen & dining room; convert (e) half bath to send full bath; relocate laundry area to closet; reconfigure bedroom closetsDetails
remodel (e) kitchen & enlarge opening between kitchen & dining room; convert (e) half bath to send full bath; relocate laundry area to closet; reconfigure bedroom closets | $45,000 |
| Dec 20, 2017 | Completed final sign-off Jul 2018 | 906 Chenery St | Evb General Contractor | shoring permit for building pa #201711174220. no soil shoring required. no adjacent footings affected.Details
shoring permit for building pa #201711174220. no soil shoring required. no adjacent footings affected. | $3,500 |
| Nov 17, 2017 | Completed final sign-off Oct 2018 | 906 Chenery St | Evb General Contractor | foundation replacement, lateral strengthing, partial roof framing replacement for vaulted ceiling, 2 new skylights, new roofing. interior remodel includes kitchen & bath remodel & new finishes. new sliding doors at rear, new windows at sides & rear. repair/replace as necessary off any rot-damge.Details
foundation replacement, lateral strengthing, partial roof framing replacement for vaulted ceiling, 2 new skylights, new roofing. interior remodel includes kitchen & bath remodel & new finishes. new sliding doors at rear, new windows at sides & rear. repair/replace as necessary off any rot-damge. | $95,000 |
| Nov 17, 2017 | Completed final sign-off Aug 2018 | 255 Vicente St | H M W Development Inc | replacement of front stairs and supporting structure. new stair will include code upgrades to eliminate winders and correct handrail & guardrail height.Details
replacement of front stairs and supporting structure. new stair will include code upgrades to eliminate winders and correct handrail & guardrail height. | $20,000 |
| Oct 27, 2017 | Completed final sign-off Dec 2017 | 125 Brompton Av | Bernhardt Remodeling | remove wall at 2nd floor between dining room and living room/studio. replace with new beam, support posts, and footingsDetails
remove wall at 2nd floor between dining room and living room/studio. replace with new beam, support posts, and footings | $12,000 |
| Oct 27, 2017 | Completed final sign-off Jun 2021 | 532 Bella Vista Wy | Tracy Anthony General Contractor | two story horizontal additon at rear, reconfigure bedroom and full bath at 1st fl. reconfigure interior stairs, new deck and stairs to grade at rear yardDetails
two story horizontal additon at rear, reconfigure bedroom and full bath at 1st fl. reconfigure interior stairs, new deck and stairs to grade at rear yard | $225,000 |
| Sep 29, 2017 | Completed final sign-off Jun 2019 | 151 Brompton Av | J S B Construction | new bedroom, bath and family room at 1st fl, partial lightwell in fill at 2nd fl, new interior stairs, new 2nd and 1st fl decks at rear yard, new door and window opening in (e) rear facadeDetails
new bedroom, bath and family room at 1st fl, partial lightwell in fill at 2nd fl, new interior stairs, new 2nd and 1st fl decks at rear yard, new door and window opening in (e) rear facade | $77,848 |
| Jun 23, 2017 | Completed final sign-off Nov 2017 | 1434 Plymouth Av | Mccormack Construction | kitchen remodel within the space of the extg kitchen, new opening between extg kitchen and extg dinning room. window and door alterations on north facade.Details
kitchen remodel within the space of the extg kitchen, new opening between extg kitchen and extg dinning room. window and door alterations on north facade. | $32,000 |
| May 1, 2017 | Completed final sign-off May 2019 | 11 Los Palmos Dr | H M W Development Inc | one story horizontal rear addition w/roof deck. new wood stairs to grade, 1st floor deck (+ 4'-o" above grade). ground flooor remodel. addition to include master bedroom w/bathroom & laundry.Details
one story horizontal rear addition w/roof deck. new wood stairs to grade, 1st floor deck (+ 4'-o" above grade). ground flooor remodel. addition to include master bedroom w/bathroom & laundry. | $57,205 |
| May 1, 2017 | Expired or cancelled cancelled Dec 2023 | 1410 Post St | 2nd floor horizontal addition over the (e) single story garage & two story sideyard. extension of the garage/addition to the western property line. addition to contain bathroom, closet & laundry room.Details
2nd floor horizontal addition over the (e) single story garage & two story sideyard. extension of the garage/addition to the western property line. addition to contain bathroom, closet & laundry room. | $114,500 | |
| Apr 14, 2017 | Expired or cancelled withdrawn May 2017 | 575 28th St | deck replacement in kind due to dryrot damage at 1st & 2nd floors. replacement decks will be supported by new ledgers, posts & beams. (adj. stairs & fire escape under separate permit#201602220134).Details
deck replacement in kind due to dryrot damage at 1st & 2nd floors. replacement decks will be supported by new ledgers, posts & beams. (adj. stairs & fire escape under separate permit#201602220134). | $7,200 | |
| Apr 10, 2017 | Completed final sign-off Sep 2019 | 506 Molimo Dr | H M W Development Inc | new decks @ basement, 1st & 2nd floors. new spiral stair from 1st floor deck to 2nd floor deck. new exterior stair from 1st floor deck to grade. interior remodel includes kitchen, 1st floor, hallway, rear window & door replacement. basement development for media room & powder room.Details
new decks @ basement, 1st & 2nd floors. new spiral stair from 1st floor deck to 2nd floor deck. new exterior stair from 1st floor deck to grade. interior remodel includes kitchen, 1st floor, hallway, rear window & door replacement. basement development for media room & powder room. | $125,000 |
| Mar 30, 2017 | Completed final sign-off Nov 2017 | 114 Encline Ct | Evb General Contractor | gr fl remodel, stairway alteration and new deck. new gr fl rooms include 2 bedrooms, 1 1/12 baths, media rm, laundry rmDetails
gr fl remodel, stairway alteration and new deck. new gr fl rooms include 2 bedrooms, 1 1/12 baths, media rm, laundry rm | $95,000 |
| Mar 21, 2017 | Completed final sign-off Oct 2020 | 68 Agua Wy | Evb General Contractor, Opus Pacific Development | ground floor to be developed for new bedrooms. bathrooms & office. horizontal addition to the rer, new 2nd floor wood deck & 1st floor patio, kitchen remodel.Details
ground floor to be developed for new bedrooms. bathrooms & office. horizontal addition to the rer, new 2nd floor wood deck & 1st floor patio, kitchen remodel. | $260,000 |
| Jun 27, 2016 | Completed final sign-off Jul 2019 | 1226 40th Av | E.J. Builders | partially infill (e) lightwell at 2/f to mirror adjacent property lightwell. add master bathroom. remodel kitchen & (e) bathroom, misc interior remodeling. replace (e) furnace with new unitDetails
partially infill (e) lightwell at 2/f to mirror adjacent property lightwell. add master bathroom. remodel kitchen & (e) bathroom, misc interior remodeling. replace (e) furnace with new unit | $75,000 |
| Jun 27, 2016 | Completed final sign-off Sep 2016 | 2158 35th Av | B W H Builder Inc. | remodel (e) ground floor family room from new master suite & office. master suite includes: new closet, bathroom, (e) powder room to remain. replace rear window & exterior door w/same width, new hgt units, (e) stair to remain, replace sould wall railing with open rail, replace w/h w/on demand unit.Details
remodel (e) ground floor family room from new master suite & office. master suite includes: new closet, bathroom, (e) powder room to remain. replace rear window & exterior door w/same width, new hgt units, (e) stair to remain, replace sould wall railing with open rail, replace w/h w/on demand unit. | $61,000 |