Brian Provencal
- Listed as
- architect, engineer
- Firm
- Turley & Associates
- On San Francisco permits
- Jul 2011 to May 2025
17 permits since 2000 (engineer on 16 permits, architect on 1 permit): 12 completed, 5 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 13, 2025 | Completed final sign-off Jul 2026 | 780 Mission St | Emcor Services/Mesa Energy Systems Inc | like for like replacement of 2 cooling tower and vfd on 3rd floor. 3 condensor water pumps and vfd 2nd floor.Details
like for like replacement of 2 cooling tower and vfd on 3rd floor. 3 condensor water pumps and vfd 2nd floor. | $448,000 |
| Jul 14, 2023 | Completed final sign-off Jul 2023 | 1275 Market St | Emcor Services/Mesa Energy Systems Inc | revision to pa# 202305016789, changing path of travel coming out of shaft on 17th in a different location. alternate beam attachment for pipe support.Details
revision to pa# 202305016789, changing path of travel coming out of shaft on 17th in a different location. alternate beam attachment for pipe support. | $5,000 |
| Jun 22, 2023 | Completed final sign-off Sep 2024 | 365 Main St | Northshore Build Llc | replace 3 existing cooling units with 3 new ones (interior)Details
replace 3 existing cooling units with 3 new ones (interior) | $300,000 |
| Jun 22, 2023 | Completed final sign-off Sep 2024 | 365 Main St | Northshore Build Llc | replace 12 existing cooling units with 12 new units (interior)Details
replace 12 existing cooling units with 12 new units (interior) | $900,000 |
| May 11, 2023 | Completed final sign-off Nov 2024 | 55 04th St | Emcor Services/Mesa Energy Systems Inc | deferred mep; work 4th flr, 9th flr, 19th flr 38th flr elevator equipment room add one new 3.5 ton condensing unit/ahu with new electrical and new conducting. 4th flr add new 3.5 ton condensing unit/ahu, 9th flr remove and replace one fan coil, 19th flr remove and replace two fan coil,Details
deferred mep; work 4th flr, 9th flr, 19th flr 38th flr elevator equipment room add one new 3.5 ton condensing unit/ahu with new electrical and new conducting. 4th flr add new 3.5 ton condensing unit/ahu, 9th flr remove and replace one fan coil, 19th flr remove and replace two fan coil, | $235,000 |
| May 1, 2023 | Completed final sign-off Jul 2023 | 1275 Market St | Emcor Services/Mesa Energy Systems Inc | install new 6" generator exhause from 2/f basement to the roof. new exhaust will be located in an existing shaft. the piping will be supported per the detailed indicated in drawings and insulated with 2" fiberglass, then wrapped with a 0.016 thick aluminum jacket. the exhaust will terminate at...Details
install new 6" generator exhause from 2/f basement to the roof. new exhaust will be located in an existing shaft. the piping will be supported per the detailed indicated in drawings and insulated with 2" fiberglass, then wrapped with a 0.016 thick aluminum jacket. the exhaust will terminate at... | $460,000 |
| Aug 8, 2022 | Completed final sign-off Mar 2024 | 1 Dr Carlton B Goodlett Pl | Emcor Services/Mesa Energy Systems Inc | roof - demo (2) ct demo ocp piping removal, (2) new cooling towers, extend/add vfd to electricalDetails
roof - demo (2) ct demo ocp piping removal, (2) new cooling towers, extend/add vfd to electrical | $300,000 |
| Nov 29, 2021 | Completed final sign-off Nov 2025 | 560 Mission St | Emcor Services/Mesa Energy Systems Inc | basement: remove and replace 1 extg chiller and 2 extg pumps with 1 new high effeciency chiller and 2 new pumps. use extg electrical. extend equipment pad.Details
basement: remove and replace 1 extg chiller and 2 extg pumps with 1 new high effeciency chiller and 2 new pumps. use extg electrical. extend equipment pad. | $240,000 |
| Mar 9, 2021 | Completed final sign-off Sep 2021 | 111 Sutter St | Emcor Services/Mesa Energy Systems Inc | replace high + low domestic booster pumps located in a subbasement. replace low + high gravity fed systems with 2 packaged skid pressure booster system. electrical - reuse & extend conduit & feeder to panelboard.Details
replace high + low domestic booster pumps located in a subbasement. replace low + high gravity fed systems with 2 packaged skid pressure booster system. electrical - reuse & extend conduit & feeder to panelboard. | $350,000 |
| Dec 23, 2020 | Never finaled issued Mar 2021, no final | 901 Mission St | Emcor Services/Mesa Energy Systems Inc | remove existing water chilled cooler and replace with new. modify existing support for new footprint.Details
remove existing water chilled cooler and replace with new. modify existing support for new footprint. | $350,000 |
| Dec 21, 2017 | Completed final sign-off Sep 2023 | 75 Industrial St | Adam Lewis Construction Company | revision to pa #201612144986. remove (e) interior partitions. remove (e) concrete stair-on-grade & replace with (n) metal stair. add walls and doors. add (n) lighting. add (n) mechanical system, (n) electrical outlets and lighting. (n) liquid co2 storage and distribution system.Details
revision to pa #201612144986. remove (e) interior partitions. remove (e) concrete stair-on-grade & replace with (n) metal stair. add walls and doors. add (n) lighting. add (n) mechanical system, (n) electrical outlets and lighting. (n) liquid co2 storage and distribution system. | |
| Aug 3, 2017 | Completed final sign-off Oct 2018 | 81 Jefferson St | Svb Construction Co. Inc. | t.i. to existing restaurant space. n/a ordinance #155-13Details
t.i. to existing restaurant space. n/a ordinance #155-13 | $350,000 |
| Mar 9, 2015 | Never finaled issued Mar 2015, no final | 30 Van Ness Av | Emcor Services/Mesa Energy Systems Inc | the project consists of: replace 3 (e) chillers with two (n) chillers. (n) equip will match the (e) equip cooling capacities & ele capacities. the 2 (e) chillers installed on the (e) steel platform weigh less than the (e) chillers. maher - not req'dDetails
the project consists of: replace 3 (e) chillers with two (n) chillers. (n) equip will match the (e) equip cooling capacities & ele capacities. the 2 (e) chillers installed on the (e) steel platform weigh less than the (e) chillers. maher - not req'd | $180,000 |
| Jun 3, 2013 | Never finaled issued Jun 2013, no final | 850 Bryant St | Emcor Services/Mesa Energy Systems Inc | basemt/ground level -replace (e) 535 "worthington" r-11 chilles. provide a refrigeration machine rom enclosure with correct exiting, rating & ventilation. provide refrigerant exhaust purge sys along w/monitoring & all code required alarms. upgrade all mechanical controls w/new ddc sys.Details
basemt/ground level -replace (e) 535 "worthington" r-11 chilles. provide a refrigeration machine rom enclosure with correct exiting, rating & ventilation. provide refrigerant exhaust purge sys along w/monitoring & all code required alarms. upgrade all mechanical controls w/new ddc sys. | $906,015 |
| Mar 21, 2013 | Never finaled issued Mar 2013, no final | 1200 15th St | Emcor Services/Mesa Energy Systems Inc | repl air handlers ahu-1 & install variable air boxes for 2nd floor offices. repl ahu-2 & ahu-3, repl heating water boilers with a new near condensing boilers. upgrade energy management & control system for ahu's & boilers. repl domestic water boilers, storage tank circulating pumps & fluesDetails
repl air handlers ahu-1 & install variable air boxes for 2nd floor offices. repl ahu-2 & ahu-3, repl heating water boilers with a new near condensing boilers. upgrade energy management & control system for ahu's & boilers. repl domestic water boilers, storage tank circulating pumps & flues | $370,000 |
| Nov 1, 2011 | Completed final sign-off Jul 2013 | 1660 Mission St | Emcor Services/Mesa Energy Systems Inc | suite 500 - install premium efficiency motors, ahu-1 control upgrades. vfd on garage fans, boiler replacement & related equipment. separate fa permit is required by sffd for fan shut down upon smoke detectionDetails
suite 500 - install premium efficiency motors, ahu-1 control upgrades. vfd on garage fans, boiler replacement & related equipment. separate fa permit is required by sffd for fan shut down upon smoke detection | $170,000 |
| Jul 13, 2011 | Never finaled issued Jul 2011, no final | 930 Bryant St | Emcor Services/Mesa Energy Systems Inc | boiler replacement and water heater addition @ ground floor. to replace existing.Details
boiler replacement and water heater addition @ ground floor. to replace existing. | $48,000 |