Andy Forrest
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Andy Forest P.E.
- Based in
- San Francisco
- On San Francisco permits
- Aug 2001 to Oct 2024
240 permits since 2000 (engineer on 177 permits, architect on 52 permits, authorized agent-others on 6 permits, designer on 6 permits): 159 completed, 30 never finaled, 51 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 240.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 16, 2024 | Completed final sign-off Dec 2024 | 22 Terra Vista Av | West Beam Construction Llc | unit a- revision to 201711154049 s1 deck foundation. eliminate grade beam. post supported by isolated footing.Details
unit a- revision to 201711154049 s1 deck foundation. eliminate grade beam. post supported by isolated footing. | |
| Nov 2, 2021 | Completed final sign-off Dec 2024 | 22 Terra Vista Av | revision to pa# 2017-1115-4049; reduction in scope: no excavation. (n) deck, at grade 36" above grade.Details
revision to pa# 2017-1115-4049; reduction in scope: no excavation. (n) deck, at grade 36" above grade. | ||
| Mar 15, 2021 | Completed final sign-off Nov 2021 | 2 San Fernando Wy | Fogarty James A | kitchen renovation-remove wall and install (n) steel beam.Details
kitchen renovation-remove wall and install (n) steel beam. | $40,000 |
| May 21, 2019 | Never finaled issued Dec 2019, no final | 2662 38th Av | Hunter Dale Builders Inc. | alter-site. revision to appln #201312184513-s. infill on the 1st & 3rd fl on the south property line, small rear balcony.Details
alter-site. revision to appln #201312184513-s. infill on the 1st & 3rd fl on the south property line, small rear balcony. | $6,800 |
| Apr 10, 2019 | Completed final sign-off Sep 2019 | 130 Idora Av | Anthony Lynch | lower portions of extg foundation waterproof perimeter footings and install drainage system.Details
lower portions of extg foundation waterproof perimeter footings and install drainage system. | $30,000 |
| Apr 10, 2019 | Never finaled issued Jun 2019, no final | 917 Rhode Island St | Waters And Waters | revision to app# 201406178580. 1)infill extg openings in foundation wall with new reinforced concrete. 2)add steel beam and metal decking to re establish extg walkway. 3) add framing ledger to extg conc. walls.Details
revision to app# 201406178580. 1)infill extg openings in foundation wall with new reinforced concrete. 2)add steel beam and metal decking to re establish extg walkway. 3) add framing ledger to extg conc. walls. | $8,000 |
| Jan 14, 2019 | Completed final sign-off May 2019 | 150 Hearst Av | Fox Brothers Construction Inc | replace (e) foundation witn (n) reinforced concrete foundation. add shearwalls, holdowns & centerline steel beam w/footings; lower slab & alter (e) stair to garageDetails
replace (e) foundation witn (n) reinforced concrete foundation. add shearwalls, holdowns & centerline steel beam w/footings; lower slab & alter (e) stair to garage | $75,000 |
| Sep 6, 2018 | Expired or cancelled expired Dec 2024 | 114 Jasper Pl | Kalix Inc Dbalara Construction | soft story seismic upgrade as per s.f.e.b.c. chapter 4d, using 2016 c.e.b.c. appx. ch.a4. add shear walls, holdowns & 2 moment frames. to comply with n.o.v. 201712981Details
soft story seismic upgrade as per s.f.e.b.c. chapter 4d, using 2016 c.e.b.c. appx. ch.a4. add shear walls, holdowns & 2 moment frames. to comply with n.o.v. 201712981 | $100,000 |
| Jul 11, 2018 | Never finaled filed Jul 2018, never issued | 184 Holladay Av | replace brick foundation on southside property line, approx 44 ftDetails
replace brick foundation on southside property line, approx 44 ft | $20,000 | |
| Apr 27, 2018 | Expired or cancelled cancelled Jan 2026 | 1 18th Av | new pre-manuf. elevator to be added inside extg residence. add 2 dormers to extg 3rd floor roof.Details
new pre-manuf. elevator to be added inside extg residence. add 2 dormers to extg 3rd floor roof. | $100,000 | |
| Mar 28, 2018 | Never finaled issued Mar 2018, no final | 2662 17th Av | Gallagher Construction Inc | replace (e) foundation. remove (e) garage posts and replace with steel beams. install new shearwalls in garage, ply walls, replace one wood beamDetails
replace (e) foundation. remove (e) garage posts and replace with steel beams. install new shearwalls in garage, ply walls, replace one wood beam | $75,000 |
| Dec 22, 2017 | Completed final sign-off May 2024 | 246 Faxon Av | Fox Brothers Construction Inc | replace/reconfigure (e) family room. add interior stair, add solar, remodel kitchen, garage t0 1-hr protection, add bedroom, bathroom & media room @ 1st fl garden levelDetails
replace/reconfigure (e) family room. add interior stair, add solar, remodel kitchen, garage t0 1-hr protection, add bedroom, bathroom & media room @ 1st fl garden level | $120,000 |
| Dec 7, 2017 | Completed final sign-off May 2020 | 869 Alvarado St | Kanler Inc, Knab Builder | convert 1st fl storage to living space including 2 full baths, 4 laundry. new interior stair to 3 floors. kitchen, bdrm remodel, relocate mster bath. add 4 dormers at rear, 5 skylights. 4 ext doors at side and rear. 20 windows, repair e deck with new deck at grade. strucutral + foundationsDetails
convert 1st fl storage to living space including 2 full baths, 4 laundry. new interior stair to 3 floors. kitchen, bdrm remodel, relocate mster bath. add 4 dormers at rear, 5 skylights. 4 ext doors at side and rear. 20 windows, repair e deck with new deck at grade. strucutral + foundations | $600,000 |
| Nov 1, 2017 | Completed final sign-off Apr 2019 | 450 27th St | William Gregory Clause | existing unconditioned shed at rear yard, not visable to street, install 1 new exterior door, change pitched roof to flat roof, less than 10' highDetails
existing unconditioned shed at rear yard, not visable to street, install 1 new exterior door, change pitched roof to flat roof, less than 10' high | $12,000 |
| Sep 20, 2017 | Never finaled issued Oct 2017, no final | 373 South Van Ness Av | Rinaldi Construction | provide a rated path of egress along (e) tradesman alley (north side) from proposed 3 unit bldg @ rear of property (under seperate pa#201604296193). scope to include a new 10' wall along property line, remodel "e" bldg north wall to be 1 hr. rated, new gate at front. n/a maherDetails
provide a rated path of egress along (e) tradesman alley (north side) from proposed 3 unit bldg @ rear of property (under seperate pa#201604296193). scope to include a new 10' wall along property line, remodel "e" bldg north wall to be 1 hr. rated, new gate at front. n/a maher | $10,000 |
| Sep 14, 2017 | Completed final sign-off Jul 2020 | 237 Cumberland St | K 2 Builders Inc | soft story upgrade per sfebc ch 4d usting 2016 cebc app ch a4, add shear walls, holdowns and 2 moment framesDetails
soft story upgrade per sfebc ch 4d usting 2016 cebc app ch a4, add shear walls, holdowns and 2 moment frames | $40,000 |
| Sep 12, 2017 | Completed final sign-off Sep 2019 | 1438 South Van Ness Av | Gallagher Construction Inc | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. replace portions of (e) foundation w/(n) reinforce foundation, add shearwalls & holdowns.Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. replace portions of (e) foundation w/(n) reinforce foundation, add shearwalls & holdowns. | $20,000 |
| Sep 12, 2017 | Completed final sign-off Apr 2020 | 1323 12th Av | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. replace portions of (e) foundation w (n) reinf. foundation add holdowns and shearwalls, 2 steel beamsDetails
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. replace portions of (e) foundation w (n) reinf. foundation add holdowns and shearwalls, 2 steel beams | $30,000 | |
| Sep 7, 2017 | Completed final sign-off Apr 2022 | 789 06th Av | mandatory soft story upgrade as per sfbc ch 4d utilizing the 2016 cebc appendix ch a4. replace portions of the e foundation with n reinfo foundation, add shearlwalls, holdownsDetails
mandatory soft story upgrade as per sfbc ch 4d utilizing the 2016 cebc appendix ch a4. replace portions of the e foundation with n reinfo foundation, add shearlwalls, holdowns | $60,000 | |
| Aug 22, 2017 | Completed final sign-off Oct 2018 | 2780 Sacramento St | Old Sod Construction Inc | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $150,000 |
| Aug 22, 2017 | Completed final sign-off Jun 2018 | 55 Dorantes Av | Tracy Anthony General Contractor | revision to app#201510190056. replace dryrot beams exposed during construction with 4 new steel beams, tube steel columns, and footings. replace extg dryrot 2x12's flr jsts with lvl joists. remove extg dryrot ext. walls as noted with new plywood and stucco.Details
revision to app#201510190056. replace dryrot beams exposed during construction with 4 new steel beams, tube steel columns, and footings. replace extg dryrot 2x12's flr jsts with lvl joists. remove extg dryrot ext. walls as noted with new plywood and stucco. | $25,000 |
| Aug 9, 2017 | Expired or cancelled expired Mar 2019 | 35 Dorland St | Robert Howard Builders Inc. | kitchen remodel; remove wall betwee kitchen & dining room & replace with beam; install posts & footingsDetails
kitchen remodel; remove wall betwee kitchen & dining room & replace with beam; install posts & footings | $50,000 |
| Aug 9, 2017 | Completed final sign-off Mar 2018 | 1090 Church St | Cooke And Mccann Inc | soft story retrofit per sfebc chapter 4d engineering criteria appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria appendix a-4 | $75,000 |
| Jun 2, 2017 | Never finaled issued Jun 2017, no final | 2678 17th Av | Gallagher Construction Inc | replace failed retaining wall and portion of extg bldg ret. wall /footing.Details
replace failed retaining wall and portion of extg bldg ret. wall /footing. | $30,000 |
| Mar 15, 2017 | Completed final sign-off Nov 2018 | 1966 California St | Narrowback Construction Co. | revisions to ap 2016-0516-7544, legalization of 824.8 sq ft unit on 1st floor, per ord #43-14 (maher) lower the footings & slab for headroom htDetails
revisions to ap 2016-0516-7544, legalization of 824.8 sq ft unit on 1st floor, per ord #43-14 (maher) lower the footings & slab for headroom ht | $30,000 |
| Mar 10, 2017 | Completed final sign-off Mar 2018 | 544 Church St | Gallagher Construction Inc | comply w/nov 201642247 - mandatory soft story upgrade as per sfbc chapter 34b utilizing 2012 iebc, appendix a-4. add plywood shearwalls w/holdowns, add three hardy panels w/grade beam.Details
comply w/nov 201642247 - mandatory soft story upgrade as per sfbc chapter 34b utilizing 2012 iebc, appendix a-4. add plywood shearwalls w/holdowns, add three hardy panels w/grade beam. | $50,000 |
| Mar 9, 2017 | Expired or cancelled cancelled Jan 2026 | 1966 California St | revision to 201510210372 mandatory soft story retrofit as per sfbc, ch 34b using 2012 iebc appx a4. lower footing 24" maher naDetails
revision to 201510210372 mandatory soft story retrofit as per sfbc, ch 34b using 2012 iebc appx a4. lower footing 24" maher na | $20,000 | |
| Dec 20, 2016 | Completed final sign-off Oct 2017 | 738 20th Av | revision to 201611031856: replace wood posts and beam at 1st floor rear with 3 new footings and steel beam. replace footing at breezewayDetails
revision to 201611031856: replace wood posts and beam at 1st floor rear with 3 new footings and steel beam. replace footing at breezeway | $7,500 | |
| Nov 3, 2016 | Completed final sign-off Oct 2017 | 738 20th Av | 1) remove 2 walls and replace with beams and footings on 2 floors. 2)add shearwalls and steel frames for voluntary strengthening.Details
1) remove 2 walls and replace with beams and footings on 2 floors. 2)add shearwalls and steel frames for voluntary strengthening. | $65,000 | |
| Aug 9, 2016 | Completed final sign-off Mar 2017 | 250 Castro St | Fox Brothers Construction Inc | mandatory soft story upgrade as per sfbc chapter 34, 2012 iebc appendix a-4. add ply shearwalls & two moment frames (line 6.5)Details
mandatory soft story upgrade as per sfbc chapter 34, 2012 iebc appendix a-4. add ply shearwalls & two moment frames (line 6.5) | $125,000 |
| Jul 25, 2016 | Completed final sign-off Sep 2017 | 936 South Van Ness Av | Gallagher Construction Inc | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4. replace portions of the (e) foundationg with (n) reinforced foundation. add shearwalls & holddowns.Details
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4. replace portions of the (e) foundationg with (n) reinforced foundation. add shearwalls & holddowns. | $125,000 |
| Jul 12, 2016 | Completed final sign-off Mar 2017 | 2301 15th St | Fox Brothers Construction Inc | mandatory soft story upgrades as per sfbc ch 34b utilizing the 2012 iebc app a4. replace portions of (e) foundation w/new reinforced foundation, add shearwalls, holddowns & z moment frames. n/a ordinance #155-13Details
mandatory soft story upgrades as per sfbc ch 34b utilizing the 2012 iebc app a4. replace portions of (e) foundation w/new reinforced foundation, add shearwalls, holddowns & z moment frames. n/a ordinance #155-13 | $75,000 |
| May 5, 2016 | Completed final sign-off Dec 2016 | 89 Heather Av | Cooke And Mccann Inc | soft story retrofit as per sfbc code ch 34b, utilizing 2012 iebc appx a4Details
soft story retrofit as per sfbc code ch 34b, utilizing 2012 iebc appx a4 | $60,000 |
| Mar 9, 2016 | Expired or cancelled cancelled Sep 2022 | 527 32nd Av | horiz addition one story rear addition at ground floor with roof, deck and stair. remodel unit 527a interior, bath, kitchen and roomsDetails
horiz addition one story rear addition at ground floor with roof, deck and stair. remodel unit 527a interior, bath, kitchen and rooms | $120,000 | |
| Feb 5, 2016 | Never finaled issued Apr 2018, no final | 190 Holladay Av | to erect 3 stories, no basement, single family residence.Details
to erect 3 stories, no basement, single family residence. | $425,000 | |
| Jan 4, 2016 | Completed final sign-off Mar 2016 | 155 24th Av | B T Design Builders | common area- soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4, replace portions of (e) foundation with (n) reinf. foundation, add shearwalls & holdowns.Details
common area- soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4, replace portions of (e) foundation with (n) reinf. foundation, add shearwalls & holdowns. | $100,000 |
| Dec 17, 2015 | Completed final sign-off Aug 2016 | 1747 39th Av | Woods Const Co | revision to appl #201511031631 - remove wall & add beam at roof, relocate (e) rooms on 2nd floor, add shearwalls & holdowns, legalize bathroom & family room @ 1st floor.Details
revision to appl #201511031631 - remove wall & add beam at roof, relocate (e) rooms on 2nd floor, add shearwalls & holdowns, legalize bathroom & family room @ 1st floor. | $100,000 |
| Nov 23, 2015 | Expired or cancelled expired Apr 2017 | 1315 Utah St | reduce the scope of project to exclude exterior stairs from 2/f to 3/f and exclude marked path through garage. revision to pa#201206263462-s1Details
reduce the scope of project to exclude exterior stairs from 2/f to 3/f and exclude marked path through garage. revision to pa#201206263462-s1 | ||
| Oct 21, 2015 | Completed final sign-off Oct 2017 | 1966 California St | mandatory soft story retrofit as per sfbc ch 34b, utlitizing 2012 iebc appen a-4Details
mandatory soft story retrofit as per sfbc ch 34b, utlitizing 2012 iebc appen a-4 | $100,000 | |
| Sep 30, 2015 | Completed final sign-off Oct 2019 | 2037 14th Av | new rear decks ext spiral stair, ext slab on grade terrace, retaining wall, perimeter guardrail/fence.Details
new rear decks ext spiral stair, ext slab on grade terrace, retaining wall, perimeter guardrail/fence. | $40,000 | |
| Aug 7, 2015 | Completed final sign-off Apr 2019 | 450 27th St | William Gregory Clause | 2 story side & rear addition with decks. alter roof line & enlarge 3rd story @ front, sides & rear. modify front facade & add 3rd floor concealed front deck. new retractable skylt for roof access & new roof deck. relocate kit. renovate 2 full baths. add 2 full bahts & 1/2 bath. seismic upgrades.Details
2 story side & rear addition with decks. alter roof line & enlarge 3rd story @ front, sides & rear. modify front facade & add 3rd floor concealed front deck. new retractable skylt for roof access & new roof deck. relocate kit. renovate 2 full baths. add 2 full bahts & 1/2 bath. seismic upgrades. | $550,000 |
| Jul 10, 2015 | Completed final sign-off Jul 2016 | 1044 Castro St | High Ground Construction | remodel existing 1/f garage/storage area to include a new bedroom, bathroom, closets. install new windows & doors on the rear facade at 1/f.Details
remodel existing 1/f garage/storage area to include a new bedroom, bathroom, closets. install new windows & doors on the rear facade at 1/f. | $91,000 |
| Jun 22, 2015 | Completed final sign-off May 2016 | 144 Danvers St | O'shaughnessy Construction | remodel 1/f to include new office, media room, bathroom wine room & laundry room. new interior stair connect 1/f & 2/f. remodel 2/f to include kitchen, hall bathroom, hallway & outdoor center courtyard. add new below grade stairs from 1/f to rear yard.Details
remodel 1/f to include new office, media room, bathroom wine room & laundry room. new interior stair connect 1/f & 2/f. remodel 2/f to include kitchen, hall bathroom, hallway & outdoor center courtyard. add new below grade stairs from 1/f to rear yard. | $240,000 |
| Jun 16, 2015 | Completed final sign-off Mar 2017 | 2580 26th Av | vertical addition-new 3rd fl incl lounge, bedroom and full bath(850sf), frt&rear roof decks.install new connecting stair from 2nd to 3rd fl. enlarge 1/fl bedroom(95sf) and install deck above. install 2 ext. doors, 8 windows & 2 skylites.Details
vertical addition-new 3rd fl incl lounge, bedroom and full bath(850sf), frt&rear roof decks.install new connecting stair from 2nd to 3rd fl. enlarge 1/fl bedroom(95sf) and install deck above. install 2 ext. doors, 8 windows & 2 skylites. | $120,000 | |
| May 19, 2015 | Completed final sign-off Oct 2015 | 125 Laidley St | Lindquist Custom Construction Inc | new shear panel install in rear of bldg, replace extg foundation at the location of shear walls only. provide proper foundation for extg outside rear deck landing. all work in basement. enlarge rear deck landing (less than 30" a.f.g.)Details
new shear panel install in rear of bldg, replace extg foundation at the location of shear walls only. provide proper foundation for extg outside rear deck landing. all work in basement. enlarge rear deck landing (less than 30" a.f.g.) | $30,000 |
| May 12, 2015 | Completed final sign-off Dec 2015 | 125 Hernandez Av | Seamus Collins Construction, Inc. | add (n) occupied rooms at lower level (bedrm,family rm, home office & full bath); no envelope changes, replace foundation throughout, add one steel beam.Details
add (n) occupied rooms at lower level (bedrm,family rm, home office & full bath); no envelope changes, replace foundation throughout, add one steel beam. | $125,000 |
| May 11, 2015 | Completed final sign-off Jul 2016 | 609 Haight St | Cooke And Mccann Inc | replace (e) brick foundation with (n) reinforced concrete foundation throughout. replace (e) wood posts & beams with steel members. seismic upgrade at lowest level.Details
replace (e) brick foundation with (n) reinforced concrete foundation throughout. replace (e) wood posts & beams with steel members. seismic upgrade at lowest level. | $150,000 |
| Apr 30, 2015 | Completed final sign-off Mar 2016 | 1501 Larkin St | Gallagher Construction Inc | revision to soft story upgrade pa#201412184090, replace 3 (e) rotten wood beams with new steel beams, columns & footings.Details
revision to soft story upgrade pa#201412184090, replace 3 (e) rotten wood beams with new steel beams, columns & footings. | $20,000 |
| Nov 25, 2014 | Completed final sign-off Jun 2016 | 232 Elsie St | Hing Wah Construction Inc | horizontal extension @ rear. new stair down to new occupied floor with 2 new bedrooms, 2 new baths & new playroom.Details
horizontal extension @ rear. new stair down to new occupied floor with 2 new bedrooms, 2 new baths & new playroom. | $225,000 |
| Nov 18, 2014 | Completed final sign-off Apr 2015 | 1046 14th St | P Jordan Builders Inc | mandatory soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4.Details
mandatory soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. | $3,000 |
| Oct 14, 2014 | Completed final sign-off Oct 2014 | 2870 Washington St | Maverick Builders | renew permit #200611147701 for final inspection.Details
renew permit #200611147701 for final inspection. | |
| Sep 23, 2014 | Completed final sign-off Mar 2016 | 3939 20th St | W.K. Construction Company | mandatory soft story upgrade as per sf building code, ch 34b: 2012 iebc appendix a-4Details
mandatory soft story upgrade as per sf building code, ch 34b: 2012 iebc appendix a-4 | $60,000 |
| Sep 17, 2014 | Completed final sign-off Oct 2015 | 560 15th Av | Donald Lewis Gen. Contr.Inc. | to comply with physical inspection report# cc-7342 & legalize the rear deck.Details
to comply with physical inspection report# cc-7342 & legalize the rear deck. | $7,500 |
| Aug 27, 2014 | Completed final sign-off Aug 2015 | 1501 Larkin St | Gallagher Construction Inc | replace portion of exisitng brick footings with new reinforced concrete foundations. add plywood wall holdownsDetails
replace portion of exisitng brick footings with new reinforced concrete foundations. add plywood wall holdowns | $40,000 |
| Aug 8, 2014 | Completed final sign-off Jun 2016 | 605 Haight St | Cooke And Mccann Inc | (n) reinforced conc. foundation throughout. replace (e) wood posts & beams w/steel members. install accessible bathroom & ramp. no exterior work.Details
(n) reinforced conc. foundation throughout. replace (e) wood posts & beams w/steel members. install accessible bathroom & ramp. no exterior work. | $120,000 |
| Jul 31, 2014 | Completed final sign-off Aug 2014 | 555 Folsom St | S Hall Builders Inc | revision to app# 201403060096. installation of false beam drop ceiling (decorative ceiling) n/a for the maher ordinance #155-13.Details
revision to app# 201403060096. installation of false beam drop ceiling (decorative ceiling) n/a for the maher ordinance #155-13. | $1,500 |
| Jun 17, 2014 | Never finaled issued Sep 2017, no final | 917 Rhode Island St | Waters And Waters | convert (e) garage/accessory building to one residential unit with one car parking. add kitchen, 2 baths, 1 bedroom.Details
convert (e) garage/accessory building to one residential unit with one car parking. add kitchen, 2 baths, 1 bedroom. | $300,200 |
| May 30, 2014 | Completed final sign-off Dec 2014 | 28 Prosper St | Gallagher Construction Inc | replace existing brick foudation. remove wood posts + install steel beam. lower garage slab.Details
replace existing brick foudation. remove wood posts + install steel beam. lower garage slab. | $60,000 |
| Apr 16, 2014 | Completed final sign-off Aug 2024 | 893 Clayton St | Pjd Construction Inc | install a garage in the lower 1st floor with new garage door & ramp / driveway. install new spiral stair from 2nd to 1st floor. install play romm / office, bath, closet & low height deck @ 1st floor level behind garage @ rear.Details
install a garage in the lower 1st floor with new garage door & ramp / driveway. install new spiral stair from 2nd to 1st floor. install play romm / office, bath, closet & low height deck @ 1st floor level behind garage @ rear. | $125,000 |
| Apr 16, 2014 | Completed final sign-off Dec 2016 | 273 Minerva St | Bolter Construction, S Hall Builders Inc | construct rear 2 level deck with stairs. remove & replace 2 windows & 3 doors @ rear facade. install beam between family room / rec. room on 1st floor.Details
construct rear 2 level deck with stairs. remove & replace 2 windows & 3 doors @ rear facade. install beam between family room / rec. room on 1st floor. | $30,000 |
| Apr 10, 2014 | Completed final sign-off Feb 2015 | 117 Laidley St | Tomrose Construction Inc. | remove wood posts & install steel beams. remove ceiling framing at kitchen & dining rooms. install slider header.Details
remove wood posts & install steel beams. remove ceiling framing at kitchen & dining rooms. install slider header. | $25,000 |
| Feb 14, 2014 | Completed final sign-off Nov 2015 | 2872 Washington St | Podesta Construction Inc | 1) interior remodel of unit 2872 washington street. 2) add 6x10 psl header in kitchen ceiling and steel bm.Details
1) interior remodel of unit 2872 washington street. 2) add 6x10 psl header in kitchen ceiling and steel bm. | $100,000 |
| Feb 4, 2014 | Never finaled issued Feb 2014, no final | 49 Clairview Ct | 1) lower extg footing(permimeter at rear. 2)modify roof framing at rear. revision to app#201304053891 and 201307021018Details
1) lower extg footing(permimeter at rear. 2)modify roof framing at rear. revision to app#201304053891 and 201307021018 | $5,000 | |
| Dec 18, 2013 | Never finaled issued Nov 2015, no final | 2662 38th Av | Hunter Dale Builders Inc. | vertical addition & horizontal extension to (e) single family home with added bathrooms.Details
vertical addition & horizontal extension to (e) single family home with added bathrooms. | $200,000 |
| Oct 17, 2013 | Completed final sign-off Jul 2014 | 893 Clayton St | 1)revision to app#201307313270. remove posts and install steel beam on 1st floor. 2)replace extg rotten roof joists and install new roof surface and new 3rd floor joists at extg rear extension. 3)install new ret. wall with plywood wall on 1st floor.Details
1)revision to app#201307313270. remove posts and install steel beam on 1st floor. 2)replace extg rotten roof joists and install new roof surface and new 3rd floor joists at extg rear extension. 3)install new ret. wall with plywood wall on 1st floor. | $15,000 | |
| Oct 2, 2013 | Expired or cancelled expired Nov 2015 | 2872 Washington St | Handelin Inc Dba Original Construction C | revision to 201308154438: revision 1 closet in bedroom 3. non structural remodel. add closet in another bedroom . alter bathroom #1Details
revision to 201308154438: revision 1 closet in bedroom 3. non structural remodel. add closet in another bedroom . alter bathroom #1 | $30,000 |
| Sep 17, 2013 | Never finaled issued Nov 2013, no final | 3200 Fillmore St | Lotus Construction Dba Ironvine Construc | revision to pa# 2013-0502-5987-add new suspended ceiling in bar areaDetails
revision to pa# 2013-0502-5987-add new suspended ceiling in bar area | $60,000 |
| Aug 20, 2013 | Completed final sign-off Mar 2014 | 1888 Church St | Handelin Inc Dba Original Construction C | alterations throughout. internal only. remove walls and add beams on 2nd floor. renovate kitchen and one bath. add 1 new bath on 1st floor. add family room on 1st floor.Details
alterations throughout. internal only. remove walls and add beams on 2nd floor. renovate kitchen and one bath. add 1 new bath on 1st floor. add family room on 1st floor. | $150,000 |
| Jul 31, 2013 | Completed final sign-off Jul 2014 | 893 Clayton St | Donald Lewis Gen. Contr.Inc. | remove wall between kitchen & dining rm. renovate kitchen & install steel beam. remove brick chimney flue. renovate 2 (e) bathrooms & install one new master bathroom. replace (e) rotten beams, add slab on grade & add shear braces at (e) rear extensionDetails
remove wall between kitchen & dining rm. renovate kitchen & install steel beam. remove brick chimney flue. renovate 2 (e) bathrooms & install one new master bathroom. replace (e) rotten beams, add slab on grade & add shear braces at (e) rear extension | $75,000 |
| Jul 29, 2013 | Never finaled issued Sep 2014, no final | 349 Corbett Av | Josmari Builders | install one residential dwelling unit at lower level. legalize (e) 2nd unit.Details
install one residential dwelling unit at lower level. legalize (e) 2nd unit. | $40,000 |
| Jul 26, 2013 | Completed final sign-off Feb 2014 | 2165 Beach St | Anthony Lynch | capping of extg perimeter footing to remedy faulty grade.Details
capping of extg perimeter footing to remedy faulty grade. | $20,000 |
| Jul 11, 2013 | Completed final sign-off Jan 2015 | 1368 Plymouth Av | Toni's Construction Inc | remodel (e) bedrm & kitchen located in rear of house into a kitchen/family rm w/in the (e) footprint. (n) stair to access (n) living space @ lower level w/c is currently crawl space. lower level becomes 2 bedrms, bathrm, living rm & laundry rm. (e) interior parking garage area to remain.Details
remodel (e) bedrm & kitchen located in rear of house into a kitchen/family rm w/in the (e) footprint. (n) stair to access (n) living space @ lower level w/c is currently crawl space. lower level becomes 2 bedrms, bathrm, living rm & laundry rm. (e) interior parking garage area to remain. | $240,000 |
| May 13, 2013 | Completed final sign-off Jul 2014 | 327 Cherry St | P 3 Construction & Remodeling Inc | add 2 beams in ceiling of 2nd floor. remove (e) brick chimney-roof to 2nd floor.Details
add 2 beams in ceiling of 2nd floor. remove (e) brick chimney-roof to 2nd floor. | $3,000 |
| May 2, 2013 | Never finaled issued May 2013, no final | 3200 Fillmore St | Lotus Construction Dba Ironvine Construc | all (e) windows within scope of work to be replaced, new ada compliant entry, bathroom remodeling, (e) bar to be relocated, no proposed modificatoins to (e) kitchen.Details
all (e) windows within scope of work to be replaced, new ada compliant entry, bathroom remodeling, (e) bar to be relocated, no proposed modificatoins to (e) kitchen. | $120,000 |
| May 1, 2013 | Expired or cancelled expired Nov 2017 | 1303 Utah St | basement excavation of 24" new perimeter footings under extg conc. retaining walls. new conc. floor slab extg basement stairs to be updated as required for lower basement floor level. ada improvements to bathrooms, entry and secondary means of egress.Details
basement excavation of 24" new perimeter footings under extg conc. retaining walls. new conc. floor slab extg basement stairs to be updated as required for lower basement floor level. ada improvements to bathrooms, entry and secondary means of egress. | $100,000 | |
| Apr 5, 2013 | Never finaled issued Apr 2013, no final | 49 Clairview Ct | New Bay Construction Co. | add steel beam in garage, add shearwalls & seismic hardware, add footings.Details
add steel beam in garage, add shearwalls & seismic hardware, add footings. | $40,000 |
| Apr 5, 2013 | Expired or cancelled expired Oct 2014 | 2110 Vallejo St | P 3 Construction & Remodeling Inc | install (n) conc. retaining walls & conc stairs within private lot.Details
install (n) conc. retaining walls & conc stairs within private lot. | $75,000 |
| Mar 14, 2013 | Completed final sign-off Feb 2014 | 2775 Clay St | C H Burnham Inc | add new habitable space within the extg 1st floor garage/storage space. interior renovations to 2nd and 3rd floors. fenestration changes to rear facade only. no exterior envelope changes. no front facade changes. full seismic upgrade.Details
add new habitable space within the extg 1st floor garage/storage space. interior renovations to 2nd and 3rd floors. fenestration changes to rear facade only. no exterior envelope changes. no front facade changes. full seismic upgrade. | $250,000 |
| Mar 7, 2013 | Completed final sign-off Jun 2013 | 411 Douglass St | P 3 Construction & Remodeling Inc | revision to pa# 2013-0221-0664-as built condition-delete 2 treads & non structural postsDetails
revision to pa# 2013-0221-0664-as built condition-delete 2 treads & non structural posts | |
| Mar 7, 2013 | Completed final sign-off Oct 2013 | 622 Paris St | Frank Walley Construction | underpin approx 40ft of (e) souty footing & lower to proposed adjacent north footing depthDetails
underpin approx 40ft of (e) souty footing & lower to proposed adjacent north footing depth | $15,000 |
| Mar 5, 2013 | Never finaled issued Oct 2013, no final | 4326 Cesar Chavez St | remodel & addition to single family residence rear & vertical addition, converting (e) attic and basement to habitable use, and add (n) 3rd floor.Details
remodel & addition to single family residence rear & vertical addition, converting (e) attic and basement to habitable use, and add (n) 3rd floor. | $300,000 | |
| Feb 27, 2013 | Completed final sign-off Oct 2014 | 2110 Vallejo St | P 3 Construction & Remodeling Inc | construct retaining wall utilizing 3 cycle sections.Details
construct retaining wall utilizing 3 cycle sections. | $10,000 |
| Feb 26, 2013 | Expired or cancelled expired Aug 2019 | 10 De Soto St | add a two story addition at the rear (horizontal addition), fire sprinklers for addition only under seperate permit.Details
add a two story addition at the rear (horizontal addition), fire sprinklers for addition only under seperate permit. | $150,000 | |
| Feb 21, 2013 | Completed final sign-off Oct 2014 | 2870 Washington St | Maverick Builders | revision to previous issued pa# 200611147701. delete vehicle elev and install conc ramp. delete metal decking, add beams to support ext. walk way at 2nd floor, support 2 interior chimneys, support 4 steel col at 2876 washington st, revise beam spans along line c.Details
revision to previous issued pa# 200611147701. delete vehicle elev and install conc ramp. delete metal decking, add beams to support ext. walk way at 2nd floor, support 2 interior chimneys, support 4 steel col at 2876 washington st, revise beam spans along line c. | $30,000 |
| Feb 21, 2013 | Expired or cancelled expired Jul 2014 | 1824 Jackson St | P 3 Construction & Remodeling Inc | remove non bearing walls in apt h. renovate living room, lobby and study areaDetails
remove non bearing walls in apt h. renovate living room, lobby and study area | $20,000 |
| Feb 13, 2013 | Completed final sign-off Sep 2013 | 156 Cresta Vista Dr | renew expired permit 200807217200; add lower floor within building envelopeDetails
renew expired permit 200807217200; add lower floor within building envelope | $145,000 | |
| Feb 13, 2013 | Expired or cancelled cancelled Jul 2015 | 1427 Grant Av | facade alteration to allow on(n) ramp door & power assisted door opened. new accessible bathrm at g/f level. add moment frame @ interior front of bldg; basement to ceiling of g/f. to comply w/ nov 201250231 & 201283276.Details
facade alteration to allow on(n) ramp door & power assisted door opened. new accessible bathrm at g/f level. add moment frame @ interior front of bldg; basement to ceiling of g/f. to comply w/ nov 201250231 & 201283276. | $60,000 | |
| Feb 4, 2013 | Completed final sign-off Oct 2014 | 2110 Vallejo St | P 3 Construction & Remodeling Inc | install temporary shoring soldier beams & lagging; construct retaining wall @ front of property.Details
install temporary shoring soldier beams & lagging; construct retaining wall @ front of property. | $30,000 |
| Jan 24, 2013 | Completed final sign-off Nov 2015 | 616 Baker St | Lotus Construction Dba Ironvine Construc | ground floor (n) habitable space: (n) one master bedroom, (n) one bathroom, (n) storage & (n) laundry room. 2nd fl renovate (e) bathroom, closets & rear deck. remove (e) lightwell from (e) 2nd & 3rd fls. 3rd fl renovate (e) kitchen, bathroom & closets. remove (e) lightwell from (e) w/in (e) space.Details
ground floor (n) habitable space: (n) one master bedroom, (n) one bathroom, (n) storage & (n) laundry room. 2nd fl renovate (e) bathroom, closets & rear deck. remove (e) lightwell from (e) 2nd & 3rd fls. 3rd fl renovate (e) kitchen, bathroom & closets. remove (e) lightwell from (e) w/in (e) space. | $150,000 |
| Jan 2, 2013 | Completed final sign-off Nov 2014 | 16 Powers Av | Fox Brothers Construction Inc | no modification to exterior. remodel unit interiors, replace kitchens, replace baths, new plumbing & electrical, insulation & drywall, new foundation, replace roof singles.Details
no modification to exterior. remodel unit interiors, replace kitchens, replace baths, new plumbing & electrical, insulation & drywall, new foundation, replace roof singles. | $135,000 |
| Dec 26, 2012 | Completed final sign-off Aug 2013 | 507 Arkansas St | Cal C A D E Construction Inc | new (1) bedroom, (1) family room, (1) full bathroom & laundry room on ground floor.Details
new (1) bedroom, (1) family room, (1) full bathroom & laundry room on ground floor. | $25,000 |
| Dec 3, 2012 | Completed final sign-off Aug 2013 | 673 Geary St | Lotus Construction Dba Ironvine Construc | alterations to (e) bar & restaurant. remodel (e) 4 bathrooms. raise (e) mechanical soffit to accomodate (n) facade design. raise ceiling of (e) exit corridor & install 3/4 hr. rated glass block openings.Details
alterations to (e) bar & restaurant. remodel (e) 4 bathrooms. raise (e) mechanical soffit to accomodate (n) facade design. raise ceiling of (e) exit corridor & install 3/4 hr. rated glass block openings. | $100,000 |
| Nov 20, 2012 | Completed final sign-off Feb 2014 | 906 Rhode Island St | Greg Livy, Inc. | interior alteration throughout (kitchens & baths). remove (e) rear stairs & install new cantilevered decks & spiral stair. new skylights in (e) roof. 2 dormers (less than 20% roof area).Details
interior alteration throughout (kitchens & baths). remove (e) rear stairs & install new cantilevered decks & spiral stair. new skylights in (e) roof. 2 dormers (less than 20% roof area). | $100,000 |
| Oct 19, 2012 | Completed final sign-off Jul 2014 | 616 Baker St | Lotus Construction Dba Ironvine Construc | 1)remove extg portion of brick foundation and replace with new reinforced conc. footing. 2)install 4'-6" sunken patio with ret. walls in rear yard.Details
1)remove extg portion of brick foundation and replace with new reinforced conc. footing. 2)install 4'-6" sunken patio with ret. walls in rear yard. | $20,000 |
| Oct 10, 2012 | Completed final sign-off Mar 2013 | 715 Cole St | Madden Construction | revision to pa#2012-0830-8603. reframe stair from 2nd fl to 1st fl.Details
revision to pa#2012-0830-8603. reframe stair from 2nd fl to 1st fl. | $1,500 |
| Aug 30, 2012 | Completed final sign-off Mar 2013 | 715 Cole St | Madden Construction | remove (e) & install (n) centerline footing at garage level. install plywood walls & holdowns at garage level. add one window at rear. remove chimney.Details
remove (e) & install (n) centerline footing at garage level. install plywood walls & holdowns at garage level. add one window at rear. remove chimney. | $30,000 |
| Aug 29, 2012 | Completed final sign-off Aug 2015 | 49 Clairview Ct | New Bay Construction Co. | new fence and retaining walls at side and rear yardDetails
new fence and retaining walls at side and rear yard | $15,000 |
| Aug 20, 2012 | Completed final sign-off Oct 2014 | 2100 Vallejo St | Ace Drilling & Excavation, P 3 Construction & Remodeling Inc | excavate in crawl space to create (n) storage area & install (n) footings & retaining walls.Details
excavate in crawl space to create (n) storage area & install (n) footings & retaining walls. | $50,000 |
| Aug 20, 2012 | Completed final sign-off Sep 2012 | 99 Jefferson St | Josmari Builders | revision to pa #2012.0222.4663 - existing exterior coil up door ti be replaced with (n) sliding glass door.Details
revision to pa #2012.0222.4663 - existing exterior coil up door ti be replaced with (n) sliding glass door. | |
| Aug 20, 2012 | Never finaled issued Sep 2012, no final | 2148 Pine St | Lotus Construction Dba Ironvine Construc | waterproof & cap (e) gravity retaining wall in storage room (utility) of 1st floor @ rear.Details
waterproof & cap (e) gravity retaining wall in storage room (utility) of 1st floor @ rear. | $6,000 |