Block 1340, lot 001
1 18th Ave
- City’s use
- Multi-Family Residential
- Built
- 1912
- Stories
- 3
- Units
- 2
- Rooms
- 9 bedrooms, 6 bathrooms
- Building
- 5,083 sq ft
- Lot
- 5,789 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 20, 2023 | Completed final sign-off Apr 2024 | 1 18th Av | Bay Area Solar Solutions Dba Your Energy | 1 tesla powerwall 2 battery 13.5 kwh. + 1 tesla powerwall plus 13.5kwh.Details
1 tesla powerwall 2 battery 13.5 kwh. + 1 tesla powerwall plus 13.5kwh. | $48,385 |
| Apr 27, 2018 | Expired or cancelled cancelled Jan 2026 | 1 18th Av | new pre-manuf. elevator to be added inside extg residence. add 2 dormers to extg 3rd floor roof.Details
new pre-manuf. elevator to be added inside extg residence. add 2 dormers to extg 3rd floor roof. | $100,000 | |
| Jul 24, 2012 | Completed final sign-off Jul 2012 | 1 18th Av | Vesta Home Improvements Inc | replace/retrofit 30 windows in back of house, u value=0.40.Details
replace/retrofit 30 windows in back of house, u value=0.40. | $9,000 |
| Mar 13, 2012 | Completed final sign-off Oct 2012 | 1 18th Av | Professional Concrete Work | drilled piers with tiebacks grade beams, shear walls. foundation upgrade, new retaining wall of crawl space.Details
drilled piers with tiebacks grade beams, shear walls. foundation upgrade, new retaining wall of crawl space. | $95,000 |
| Jan 10, 2012 | Completed final sign-off Jan 2012 | 1 18th Av | G R C Roofing Inc. | reroofingDetails
reroofing | $9,900 |
| Dec 23, 2011 | Completed final sign-off Jan 2012 | 1 18th Av | Hakewill Construction Co. Inc. | remove bricks at entry walkway, repair water proofing, reinstall bricks, repair in kind, no structural work.Details
remove bricks at entry walkway, repair water proofing, reinstall bricks, repair in kind, no structural work. | $6,000 |
| Oct 28, 2003 | Completed final sign-off Oct 2003 | 1 18th Av | Armstrong Installation Service | to renew app#2001/01/19/0175 for final inspection.Details
to renew app#2001/01/19/0175 for final inspection. | |
| Jan 19, 2001 | Expired or cancelled expired Feb 2002 | 1 18th Av | Armstrong Installation Service | raise foundation system @ west elevatiion to minimum 6" above (e) grade, repair wall framing @ westDetails
raise foundation system @ west elevatiion to minimum 6" above (e) grade, repair wall framing @ west | $21,000 |
| Sep 8, 2000 | Completed final sign-off Sep 2001 | 1 18th Av | Armstrong Installation Service | remove existing brick, dry rot in kind, 2 new drains, 2 ply bituthane membrane up to walls, new bricDetails
remove existing brick, dry rot in kind, 2 new drains, 2 ply bituthane membrane up to walls, new bric | $26,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Armstrong Installation Service (3), Bay Area Solar Solutions Dba Your Energy, G R C Roofing Inc., Hakewill Construction Co. Inc., Professional Concrete Work, Vesta Home Improvements Inc
- Architects
- Andy Forrest
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.