Megan Kelly-Sweeney
- License
- C34611
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Aleph-Bau
- Based in
- San Francisco
- On San Francisco permits
- Apr 2014 to Apr 2024
4 permits since 2000 (architect on 4 permits): 4 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Lung Fung Const & Elec Co (2), Pjd Construction Inc (2)
- Engineers
- Andy Forrest, Michael Hom
Where they worked
- Single-family 4
- Multi-family (2-family, apartments) 0
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 10, 2024 | Completed final sign-off Aug 2024 | 893 Clayton St | Pjd Construction Inc | revision to 201404163412 s1. removal of 2 dormers from scope. reduce of window size. clarification of storage/mech area for 4th fl & adding roof deck off of 4th fl within rear setback at rear of property. driveway surface change to paveable paversDetails
revision to 201404163412 s1. removal of 2 dormers from scope. reduce of window size. clarification of storage/mech area for 4th fl & adding roof deck off of 4th fl within rear setback at rear of property. driveway surface change to paveable pavers | |
| Aug 24, 2020 | Completed final sign-off Feb 2021 | 40 Kittredge Tr | Lung Fung Const & Elec Co | revision to 2017-1212-6196 & 202002114132: 2nd fl - remove 3 int. walls at (e) interior court at kitchen. renovate (e) kitchen: new cabinets, countertops, lighting, appliances. (e) skylight in kitchen reduces in size, new parapet. g/f - new exterior door to be removed. fire rated wall enclosureDetails
revision to 2017-1212-6196 & 202002114132: 2nd fl - remove 3 int. walls at (e) interior court at kitchen. renovate (e) kitchen: new cabinets, countertops, lighting, appliances. (e) skylight in kitchen reduces in size, new parapet. g/f - new exterior door to be removed. fire rated wall enclosure | |
| Feb 11, 2020 | Completed final sign-off Feb 2021 | 40 Kittredge Tr | Lung Fung Const & Elec Co | rev to pa201712126196. reduce scope to not include (upper) expansion. modification to ground floor plan.Details
rev to pa201712126196. reduce scope to not include (upper) expansion. modification to ground floor plan. | |
| Apr 16, 2014 | Completed final sign-off Aug 2024 | 893 Clayton St | Pjd Construction Inc | install a garage in the lower 1st floor with new garage door & ramp / driveway. install new spiral stair from 2nd to 1st floor. install play romm / office, bath, closet & low height deck @ 1st floor level behind garage @ rear.Details
install a garage in the lower 1st floor with new garage door & ramp / driveway. install new spiral stair from 2nd to 1st floor. install play romm / office, bath, closet & low height deck @ 1st floor level behind garage @ rear. | $125,000 |