Una Kinsella
- Listed as
- architect
- Firm
- Umk Architecture
- Based in
- Burlingame
- On San Francisco permits
- May 2005 to Sep 2016
6 permits since 2000 (architect on 6 permits): 4 completed, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 21, 2016 | Never finaled issued Oct 2016, no final | 40 Ord Ct | Mc Glinchey Construction Llc` | infill covered carport with 469 sq ft 1st floor addition to incorporate new internal stair, bedroom and bath. replace 2 windowsDetails
infill covered carport with 469 sq ft 1st floor addition to incorporate new internal stair, bedroom and bath. replace 2 windows | $52,513 |
| Nov 2, 2015 | Expired or cancelled withdrawn Oct 2016 | 123 Yukon St | conversion of rear portion of garage to studio/adu w/ full bath & kitchen sink. (n) slab on grade & foundation repair for seismic upgrade.Details
conversion of rear portion of garage to studio/adu w/ full bath & kitchen sink. (n) slab on grade & foundation repair for seismic upgrade. | $20,000 | |
| Jun 25, 2013 | Completed final sign-off Feb 2014 | 906 Rhode Island St | Greg Livy, Inc. | revision to pa# 2012-1120-4572-revision to add 1 dormer on roof on south side of building, 44 sq ft roof changeDetails
revision to pa# 2012-1120-4572-revision to add 1 dormer on roof on south side of building, 44 sq ft roof change | $200 |
| Nov 20, 2012 | Completed final sign-off Feb 2014 | 906 Rhode Island St | Greg Livy, Inc. | interior alteration throughout (kitchens & baths). remove (e) rear stairs & install new cantilevered decks & spiral stair. new skylights in (e) roof. 2 dormers (less than 20% roof area).Details
interior alteration throughout (kitchens & baths). remove (e) rear stairs & install new cantilevered decks & spiral stair. new skylights in (e) roof. 2 dormers (less than 20% roof area). | $100,000 |
| Jan 31, 2007 | Completed final sign-off Apr 2008 | 251 Hearst Av | Mc Eleney Construction | horizontal addition: to rear of house to extend kitchen on upper level and add bedroom space below, house will be extended to matche design w/existing structure and no alterations will be done no the front facade.Details
horizontal addition: to rear of house to extend kitchen on upper level and add bedroom space below, house will be extended to matche design w/existing structure and no alterations will be done no the front facade. | $200,000 |
| May 13, 2005 | Completed final sign-off Sep 2005 | 3006 Castro St | replacement of (e) deck, structural upgradeDetails
replacement of (e) deck, structural upgrade | $12,000 |