Back to kitchen remodel contractors
Velox Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2015 to Nov 2019
- Last 24 months
- 0 permits filed
71 permits since 2000: 56 completed, 12 never finaled, 3 expired or cancelled.
Of the 12 never-finaled permits, 9 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
22 kitchen remodel permits: 16 completed, 5 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 88 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 21, 2019 | Completed final sign-off Apr 2022 | 775 Haight St | work to be done at 777 haight street apt 3: new kitchen layout, no framing modification-non-structural only. replace receptacles,/lights with like in-kind. new otilet, new vanity &* paint only for bathroom.Details
work to be done at 777 haight street apt 3: new kitchen layout, no framing modification-non-structural only. replace receptacles,/lights with like in-kind. new otilet, new vanity &* paint only for bathroom. | $15,000 |
| Aug 15, 2019 | Completed final sign-off Sep 2019 | 1 Lombard St | remodel kitchen in kind 2nd fl, suite 202 new cabinets and countertopsDetails
remodel kitchen in kind 2nd fl, suite 202 new cabinets and countertops | $10,000 |
| Jul 3, 2019 | Completed final sign-off Oct 2019 | 790 California St | unit 44: kitchen and bath remodel: new lights to be ledDetails
unit 44: kitchen and bath remodel: new lights to be led | $25,000 |
| May 17, 2019 | Never finaled issued May 2019, no final | 81 Santa Marina St | no change to use, egress, or occupancy. bathroom & kitchen renovation in (e) location. elec panel upgrade, removal of gravity furnace and replacement w/ hi efficiency heat pump. remove/replace water heater w/tankless. new skylightDetails
no change to use, egress, or occupancy. bathroom & kitchen renovation in (e) location. elec panel upgrade, removal of gravity furnace and replacement w/ hi efficiency heat pump. remove/replace water heater w/tankless. new skylight | $98,500 |
| Dec 4, 2018 | Completed final sign-off Mar 2019 | 260 King St | unit 1009: kitchen remodel, replace countertop w/sink replace floorDetails
unit 1009: kitchen remodel, replace countertop w/sink replace floor | $13,000 |
| Sep 27, 2018 | Never finaled issued Sep 2018, no final | 2575 Washington St | unit 1: kitchen and bathroom remodel w/like kind, no structoral work no wall modification (framing)Details
unit 1: kitchen and bathroom remodel w/like kind, no structoral work no wall modification (framing) | $15,000 |
| Aug 6, 2018 | Completed final sign-off Sep 2018 | 292 14th St | unit #6 -revision to 201804267538 install header across span in kitchen, per plans.Details
unit #6 -revision to 201804267538 install header across span in kitchen, per plans. | |
| Jun 29, 2018 | Never finaled issued Dec 2018, no final | 1086 Fulton St | unit #3. interior remodel. relocate kitchen, relocate bedroom.Details
unit #3. interior remodel. relocate kitchen, relocate bedroom. | $60,000 |
| Apr 26, 2018 | Completed final sign-off Sep 2018 | 292 14th St | unit 6: kitchen & bathroom remodel with like-kind. maher ord 155-13 naDetails
unit 6: kitchen & bathroom remodel with like-kind. maher ord 155-13 na | $15,000 |
| Apr 18, 2018 | Completed final sign-off Nov 2018 | 3800 Scott St | unit 3. kitchen and bath remodel. closet wall to be removed and new 12 foot header to be installed. calcs for the design of the new 8 x 4 x 5/16 hss steel header & 2 new posts in living room areaDetails
unit 3. kitchen and bath remodel. closet wall to be removed and new 12 foot header to be installed. calcs for the design of the new 8 x 4 x 5/16 hss steel header & 2 new posts in living room area | $25,000 |
| Dec 7, 2017 | Completed final sign-off Feb 2018 | 645 44th Av | kitchen remodel: upgade of electical (k&t) & upgrade of plumbing for kitchen area of unit.Details
kitchen remodel: upgade of electical (k&t) & upgrade of plumbing for kitchen area of unit. | $25,000 |
| Jun 26, 2017 | Completed final sign-off Oct 2017 | 575 Pierce St | unit #201: remodel kitchen and bathroom like kind. expand kitchen "removal of non-structural walls" upgrade electrical and plumbing. maher naDetails
unit #201: remodel kitchen and bathroom like kind. expand kitchen "removal of non-structural walls" upgrade electrical and plumbing. maher na | $68,000 |
| May 10, 2017 | Completed final sign-off Jan 2018 | 1369 Hyde St | unit #71: upgrade plumbing and electrical. remodel 2 bathrooms and 1 kitchen. in kind.Details
unit #71: upgrade plumbing and electrical. remodel 2 bathrooms and 1 kitchen. in kind. | $62,000 |
| Apr 28, 2017 | Completed final sign-off Aug 2017 | 575 Pierce St | unit #306: remodel kitchen and bathroom. expand kitchen by removing a non-structural wall. construction of new wall. upgrade electrical and plumbing. new cabinets, appliances, plumbing fixtures and finishes. maher n/a.Details
unit #306: remodel kitchen and bathroom. expand kitchen by removing a non-structural wall. construction of new wall. upgrade electrical and plumbing. new cabinets, appliances, plumbing fixtures and finishes. maher n/a. | $52,000 |
| Apr 12, 2017 | Never finaled issued Apr 2017, no final | 390 Bartlett St | unit #5: kitchen and bathroom remodel. no windows. no load bearing walls.Details
unit #5: kitchen and bathroom remodel. no windows. no load bearing walls. | $27,000 |
| Nov 1, 2016 | Completed final sign-off Nov 2016 | 2430 Lake St | unit #3: remodel one existing kitchen and two full bathrooms for job evaluation correction of $30,000. revision to app. #2016-08-30-6404. no alteration of wall, window or door.Details
unit #3: remodel one existing kitchen and two full bathrooms for job evaluation correction of $30,000. revision to app. #2016-08-30-6404. no alteration of wall, window or door. | $30,000 |
| Aug 30, 2016 | Completed final sign-off Nov 2016 | 2430 Lake St | #3- remove all damaged drywell, open up walls between kitchen and living room, install new 5/8th fire rated type x drywall fasten with 2-1/4" type s drywall screw 7" on center through out unit, trench additional wall for electrical upgrade. no structural work. kitchen and bathroom only.Details
#3- remove all damaged drywell, open up walls between kitchen and living room, install new 5/8th fire rated type x drywall fasten with 2-1/4" type s drywall screw 7" on center through out unit, trench additional wall for electrical upgrade. no structural work. kitchen and bathroom only. | $12,000 |
| Jun 16, 2016 | Completed final sign-off Aug 2016 | 7630 Geary Bl | unit #305: bathroom and kitchen remodel, in kind.Details
unit #305: bathroom and kitchen remodel, in kind. | $30,000 |
| Mar 17, 2016 | Completed final sign-off Jun 2016 | 48 Sumner St | addition of (n) bathroom, remodel (e) kitchen and (e) bathroom - change of layoutDetails
addition of (n) bathroom, remodel (e) kitchen and (e) bathroom - change of layout | $10,000 |
| Mar 11, 2016 | Never finaled issued Mar 2016, no final | 308 Turk St | additional work for pa# 201512034102 renovate unit #5 kitchen&bathroom upgrade electrical & plumbing,install living room window (not facing the street)t meet current code requirements.renovate bathroon in unit #3 upgrade plumbing&electrical upgrade shower pan,replace kitchen cabinets all new lightsDetails
additional work for pa# 201512034102 renovate unit #5 kitchen&bathroom upgrade electrical & plumbing,install living room window (not facing the street)t meet current code requirements.renovate bathroon in unit #3 upgrade plumbing&electrical upgrade shower pan,replace kitchen cabinets all new lights | $48,950 |
| Feb 1, 2016 | Expired or cancelled cancelled May 2016 | 42 Sumner St | remodel kitchen with like kind, upgrade electrical & plumbing. install counter top, appliances, cabinets etc. no wall modification. remodel bathroom with like kind upgrade electricalk, plumbing, new toilet, sink tile & general patch & paint throughout.Details
remodel kitchen with like kind, upgrade electrical & plumbing. install counter top, appliances, cabinets etc. no wall modification. remodel bathroom with like kind upgrade electricalk, plumbing, new toilet, sink tile & general patch & paint throughout. | $20,000 |
| Jan 15, 2016 | Completed final sign-off Mar 2016 | 115 Haight St | apt 14: remodelingkitchen & bathroom with like kind. upgrade plumbig & electrical. kitchen: install new counter top, appliances, cabinets etc upgrade. bathroom: install celing exhaust fan, vanity, sink, bathtub.Details
apt 14: remodelingkitchen & bathroom with like kind. upgrade plumbig & electrical. kitchen: install new counter top, appliances, cabinets etc upgrade. bathroom: install celing exhaust fan, vanity, sink, bathtub. | $20,000 |