Back to bathroom remodel contractors
Velox Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2015 to Nov 2019
- Last 24 months
- 0 permits filed
71 permits since 2000: 56 completed, 12 never finaled, 3 expired or cancelled.
Of the 12 never-finaled permits, 9 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
26 bathroom remodel permits: 21 completed, 4 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 100 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 21, 2019 | Completed final sign-off Apr 2022 | 775 Haight St | work to be done at 777 haight street apt 3: new kitchen layout, no framing modification-non-structural only. replace receptacles,/lights with like in-kind. new otilet, new vanity &* paint only for bathroom.Details
work to be done at 777 haight street apt 3: new kitchen layout, no framing modification-non-structural only. replace receptacles,/lights with like in-kind. new otilet, new vanity &* paint only for bathroom. | $15,000 |
| Jul 3, 2019 | Completed final sign-off Oct 2019 | 790 California St | unit 44: kitchen and bath remodel: new lights to be ledDetails
unit 44: kitchen and bath remodel: new lights to be led | $25,000 |
| Jun 12, 2019 | Completed final sign-off Sep 2019 | 4158 25th St | remodel two (e) bathrooms(half bath, approx 3x7/full bath 5x8). install (1) new shower pan in full bath. install (2) new light fixturesDetails
remodel two (e) bathrooms(half bath, approx 3x7/full bath 5x8). install (1) new shower pan in full bath. install (2) new light fixtures | $18,000 |
| May 17, 2019 | Never finaled issued May 2019, no final | 81 Santa Marina St | no change to use, egress, or occupancy. bathroom & kitchen renovation in (e) location. elec panel upgrade, removal of gravity furnace and replacement w/ hi efficiency heat pump. remove/replace water heater w/tankless. new skylightDetails
no change to use, egress, or occupancy. bathroom & kitchen renovation in (e) location. elec panel upgrade, removal of gravity furnace and replacement w/ hi efficiency heat pump. remove/replace water heater w/tankless. new skylight | $98,500 |
| Dec 14, 2018 | Completed final sign-off Oct 2019 | 911 Divisadero St | renovation 3rd floor, add dormer, relocate bath, relocate skylight, replace rear windows.Details
renovation 3rd floor, add dormer, relocate bath, relocate skylight, replace rear windows. | $100,000 |
| Dec 4, 2018 | Completed final sign-off Feb 2019 | 718 Shrader St | bath remodel, replace bathtub, repalce wall tile, replace vanity, replace light fixture.Details
bath remodel, replace bathtub, repalce wall tile, replace vanity, replace light fixture. | $28,000 |
| Sep 27, 2018 | Never finaled issued Sep 2018, no final | 2575 Washington St | unit 1: kitchen and bathroom remodel w/like kind, no structoral work no wall modification (framing)Details
unit 1: kitchen and bathroom remodel w/like kind, no structoral work no wall modification (framing) | $15,000 |
| Apr 26, 2018 | Completed final sign-off Sep 2018 | 292 14th St | unit 6: kitchen & bathroom remodel with like-kind. maher ord 155-13 naDetails
unit 6: kitchen & bathroom remodel with like-kind. maher ord 155-13 na | $15,000 |
| Apr 18, 2018 | Completed final sign-off Nov 2018 | 3800 Scott St | unit 3. kitchen and bath remodel. closet wall to be removed and new 12 foot header to be installed. calcs for the design of the new 8 x 4 x 5/16 hss steel header & 2 new posts in living room areaDetails
unit 3. kitchen and bath remodel. closet wall to be removed and new 12 foot header to be installed. calcs for the design of the new 8 x 4 x 5/16 hss steel header & 2 new posts in living room area | $25,000 |
| Feb 2, 2018 | Completed final sign-off Dec 2020 | 306 Pope St | alterations to ground floor: add afull bathroom conditioned space.Details
alterations to ground floor: add afull bathroom conditioned space. | $60,000 |
| Feb 1, 2018 | Completed final sign-off Apr 2021 | 159 Castro St | installation of 1 new dwelling unit (adu) per ordinance 162-16. convert one storage space, add bath, one bedroom.Details
installation of 1 new dwelling unit (adu) per ordinance 162-16. convert one storage space, add bath, one bedroom. | $42,000 |
| Jan 3, 2018 | Completed final sign-off Feb 2018 | 645 44th Av | revision to bpa #201712075861, remodel bathroom, install shower panDetails
revision to bpa #201712075861, remodel bathroom, install shower pan | $8,000 |
| Jun 26, 2017 | Completed final sign-off Oct 2017 | 575 Pierce St | unit #201: remodel kitchen and bathroom like kind. expand kitchen "removal of non-structural walls" upgrade electrical and plumbing. maher naDetails
unit #201: remodel kitchen and bathroom like kind. expand kitchen "removal of non-structural walls" upgrade electrical and plumbing. maher na | $68,000 |
| May 10, 2017 | Completed final sign-off Jan 2018 | 1369 Hyde St | unit #71: upgrade plumbing and electrical. remodel 2 bathrooms and 1 kitchen. in kind.Details
unit #71: upgrade plumbing and electrical. remodel 2 bathrooms and 1 kitchen. in kind. | $62,000 |
| Apr 28, 2017 | Completed final sign-off Aug 2017 | 575 Pierce St | unit #306: remodel kitchen and bathroom. expand kitchen by removing a non-structural wall. construction of new wall. upgrade electrical and plumbing. new cabinets, appliances, plumbing fixtures and finishes. maher n/a.Details
unit #306: remodel kitchen and bathroom. expand kitchen by removing a non-structural wall. construction of new wall. upgrade electrical and plumbing. new cabinets, appliances, plumbing fixtures and finishes. maher n/a. | $52,000 |
| Apr 12, 2017 | Never finaled issued Apr 2017, no final | 390 Bartlett St | unit #5: kitchen and bathroom remodel. no windows. no load bearing walls.Details
unit #5: kitchen and bathroom remodel. no windows. no load bearing walls. | $27,000 |
| Nov 1, 2016 | Completed final sign-off Nov 2016 | 2430 Lake St | unit #3: remodel one existing kitchen and two full bathrooms for job evaluation correction of $30,000. revision to app. #2016-08-30-6404. no alteration of wall, window or door.Details
unit #3: remodel one existing kitchen and two full bathrooms for job evaluation correction of $30,000. revision to app. #2016-08-30-6404. no alteration of wall, window or door. | $30,000 |
| Aug 30, 2016 | Completed final sign-off Nov 2016 | 2430 Lake St | #3- remove all damaged drywell, open up walls between kitchen and living room, install new 5/8th fire rated type x drywall fasten with 2-1/4" type s drywall screw 7" on center through out unit, trench additional wall for electrical upgrade. no structural work. kitchen and bathroom only.Details
#3- remove all damaged drywell, open up walls between kitchen and living room, install new 5/8th fire rated type x drywall fasten with 2-1/4" type s drywall screw 7" on center through out unit, trench additional wall for electrical upgrade. no structural work. kitchen and bathroom only. | $12,000 |
| Aug 8, 2016 | Completed final sign-off Sep 2016 | 3571 16th St | apt 3: rebuild fire damanged unit, insulate open wall cavites. repalce p-traps in bathroom and angle stops.Details
apt 3: rebuild fire damanged unit, insulate open wall cavites. repalce p-traps in bathroom and angle stops. | $5,000 |
| Jun 16, 2016 | Completed final sign-off Aug 2016 | 7630 Geary Bl | unit #305: bathroom and kitchen remodel, in kind.Details
unit #305: bathroom and kitchen remodel, in kind. | $30,000 |
| Mar 17, 2016 | Completed final sign-off Jun 2016 | 48 Sumner St | addition of (n) bathroom, remodel (e) kitchen and (e) bathroom - change of layoutDetails
addition of (n) bathroom, remodel (e) kitchen and (e) bathroom - change of layout | $10,000 |
| Mar 16, 2016 | Completed final sign-off Mar 2016 | 115 Haight St | add to perviously issued permit # 201601157270, install small bathroom , window, replacing old with like in kind, 5 feet above finsihed floor, unit # 14Details
add to perviously issued permit # 201601157270, install small bathroom , window, replacing old with like in kind, 5 feet above finsihed floor, unit # 14 | $500 |
| Mar 11, 2016 | Never finaled issued Mar 2016, no final | 308 Turk St | additional work for pa# 201512034102 renovate unit #5 kitchen&bathroom upgrade electrical & plumbing,install living room window (not facing the street)t meet current code requirements.renovate bathroon in unit #3 upgrade plumbing&electrical upgrade shower pan,replace kitchen cabinets all new lightsDetails
additional work for pa# 201512034102 renovate unit #5 kitchen&bathroom upgrade electrical & plumbing,install living room window (not facing the street)t meet current code requirements.renovate bathroon in unit #3 upgrade plumbing&electrical upgrade shower pan,replace kitchen cabinets all new lights | $48,950 |
| Feb 1, 2016 | Expired or cancelled cancelled May 2016 | 42 Sumner St | remodel kitchen with like kind, upgrade electrical & plumbing. install counter top, appliances, cabinets etc. no wall modification. remodel bathroom with like kind upgrade electricalk, plumbing, new toilet, sink tile & general patch & paint throughout.Details
remodel kitchen with like kind, upgrade electrical & plumbing. install counter top, appliances, cabinets etc. no wall modification. remodel bathroom with like kind upgrade electricalk, plumbing, new toilet, sink tile & general patch & paint throughout. | $20,000 |
| Jan 15, 2016 | Completed final sign-off Mar 2016 | 115 Haight St | apt 14: remodelingkitchen & bathroom with like kind. upgrade plumbig & electrical. kitchen: install new counter top, appliances, cabinets etc upgrade. bathroom: install celing exhaust fan, vanity, sink, bathtub.Details
apt 14: remodelingkitchen & bathroom with like kind. upgrade plumbig & electrical. kitchen: install new counter top, appliances, cabinets etc upgrade. bathroom: install celing exhaust fan, vanity, sink, bathtub. | $20,000 |
| Apr 3, 2015 | Completed final sign-off Jan 2017 | 7630 Geary Bl | legalization of unwarranted unit for a total of 19. unit is on the ground floor and includes (2) bed and (2) bath. per ordinance no 43-14. sprinklers under separate permit.Details
legalization of unwarranted unit for a total of 19. unit is on the ground floor and includes (2) bed and (2) bath. per ordinance no 43-14. sprinklers under separate permit. | $60,000 |