364 permits since 2000: 255 completed, 61 never finaled, 48 expired or cancelled.
Of the 61 never-finaled permits, 1 is 3 to 5 years old, 23 are 5 to 10 years old, 37 are over 10 years old. 7 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
22 stairs permits: 17 completed, 4 never finaled, 1 expired or cancelled. Typically 43 days from filing to permit and 199 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 12, 2020 | Completed final sign-off May 2022 | 139 Townsend St | 4th & 5th floor: commercial ti including partitions, flooring, and new conevenience stairs between 4th/5th floor. mep under separate permit.Details
4th & 5th floor: commercial ti including partitions, flooring, and new conevenience stairs between 4th/5th floor. mep under separate permit. | $1,500,000 |
| Sep 15, 2020 | Expired or cancelled withdrawn Aug 2024 | 468 Jackson St | tenant improvements at all floors to provide showroom, offices & staff amenities. upgrade ada bathrooms. replace stair to basement at #470 and one column at #472. seismic upgrade performed under separate permit. mep deferred.Details
tenant improvements at all floors to provide showroom, offices & staff amenities. upgrade ada bathrooms. replace stair to basement at #470 and one column at #472. seismic upgrade performed under separate permit. mep deferred. | $700,000 |
| Feb 3, 2020 | Never finaled issued Feb 2020, no final | 601 California St | minor changes to ductwork at new stair includes lighting. reference pa #2019-1226-0684.Details
minor changes to ductwork at new stair includes lighting. reference pa #2019-1226-0684. | $18,000 |
| Dec 26, 2019 | Never finaled issued Feb 2020, no final | 601 California St | 20/f: tenant convienience stair be6tween floors 2-21. strutural & architectural only. work is associated with t.i pa20191226. maher n/a.Details
20/f: tenant convienience stair be6tween floors 2-21. strutural & architectural only. work is associated with t.i pa20191226. maher n/a. | $45,000 |
| Jul 10, 2018 | Completed final sign-off Aug 2018 | 222 Stockton St | interior "soft demo" existing retail. ground floor/basement/mezz. all exterior work "storefront and sinage" under seperate permit. stairs /walls and doors under separate permit 201805078329Details
interior "soft demo" existing retail. ground floor/basement/mezz. all exterior work "storefront and sinage" under seperate permit. stairs /walls and doors under separate permit 201805078329 | $150,000 |
| Mar 27, 2018 | Completed final sign-off Sep 2018 | 580 California St | interior work to 23rd fl. remodel of kitchen, restroom vestibule,copy/supply room and small conference room. this scope does not affect existing exit acess, path of egress or exit stairs, exitsting exiting is to remain as is, mep, fire life safety and sprinkler system under separate permit. maher naDetails
interior work to 23rd fl. remodel of kitchen, restroom vestibule,copy/supply room and small conference room. this scope does not affect existing exit acess, path of egress or exit stairs, exitsting exiting is to remain as is, mep, fire life safety and sprinkler system under separate permit. maher na | $250,000 |
| Sep 25, 2017 | Completed final sign-off Apr 2019 | 399 Geary St | revision to pa#201611233479, saell and core remodel, additional of partial enclosed 3/f with open air roof terrace, new elevator, new exit stairs, new storefront, new glass curtain wall facade along geary st. revision to mep. n/a ordinance #155-13Details
revision to pa#201611233479, saell and core remodel, additional of partial enclosed 3/f with open air roof terrace, new elevator, new exit stairs, new storefront, new glass curtain wall facade along geary st. revision to mep. n/a ordinance #155-13 | |
| Jul 7, 2017 | Completed final sign-off Feb 2018 | 800 Presidio Av | revision to addendum 2(s2) of pa #201204168406 issued 1/4/17: install playground in lower yard of non profit owned community center in place of previously approved decomposed granite. project managed by owner under grant from "kaboom", install pre-fab stair (ada compliant).Details
revision to addendum 2(s2) of pa #201204168406 issued 1/4/17: install playground in lower yard of non profit owned community center in place of previously approved decomposed granite. project managed by owner under grant from "kaboom", install pre-fab stair (ada compliant). | $5,000 |
| Dec 14, 2016 | Completed final sign-off Nov 2018 | 399 Geary St | demo of indicated floor slabs for proposed elevator shaft & stair opening. demo of vault & stair cases. demo of (e) ceilings, partitions & the removal of (e) flooring. structural shoring on separate permit. space to remain vacant per sfbc ab-017.Details
demo of indicated floor slabs for proposed elevator shaft & stair opening. demo of vault & stair cases. demo of (e) ceilings, partitions & the removal of (e) flooring. structural shoring on separate permit. space to remain vacant per sfbc ab-017. | $5,000 |
| Nov 23, 2016 | Completed final sign-off Apr 2019 | 399 Geary St | change of occupancy. shell & core remodel & (n)3/f -no final completion until all related ti permits are complete. remodel an "e" 2 story concrete & masonry building. addition of partially enclosed 3rd flr with an open air-roof terrace. new elevation, new exit stairs, new mep.Details
change of occupancy. shell & core remodel & (n)3/f -no final completion until all related ti permits are complete. remodel an "e" 2 story concrete & masonry building. addition of partially enclosed 3rd flr with an open air-roof terrace. new elevation, new exit stairs, new mep. | $2,000,000 |
| Sep 23, 2016 | Completed final sign-off Mar 2017 | 210 Post St | demo of indicated floor slabs for staircase opening. demo of indicated guardrails at mezzanine. demo of selected vaults & stairs ref 2015 0727 2539Details
demo of indicated floor slabs for staircase opening. demo of indicated guardrails at mezzanine. demo of selected vaults & stairs ref 2015 0727 2539 | $5,000 |
| Aug 8, 2016 | Completed final sign-off Mar 2017 | 601 California St | 21st & 22nd floor - stairs between level 21 & 22. this work associated with #201601076559 & 3201601227687.Details
21st & 22nd floor - stairs between level 21 & 22. this work associated with #201601076559 & 3201601227687. | $40,000 |
| Feb 18, 2016 | Completed final sign-off Mar 2016 | 233 Maple St | revision to previously issued permit 201406249281(s2); this revision involves the removal of a glass draft stop at the 2nd level of the building's open stair.Details
revision to previously issued permit 201406249281(s2); this revision involves the removal of a glass draft stop at the 2nd level of the building's open stair. | |
| Oct 8, 2015 | Never finaled issued Nov 2015, no final | 3839 Washington St | new exterior stair with one hour property line wall for comletion at egress path for the 233 maple street shcool building as required under p#201406249281Details
new exterior stair with one hour property line wall for comletion at egress path for the 233 maple street shcool building as required under p#201406249281 | $50,000 |
| May 1, 2014 | Completed final sign-off Jun 2018 | 721 Beach St | revision to pa #201011295645s1/r1, revision scope: new structural system along east property line, new stair configuration at rear of property, new elevator, lobby layout, update occupancy to b, m, & r-3.Details
revision to pa #201011295645s1/r1, revision scope: new structural system along east property line, new stair configuration at rear of property, new elevator, lobby layout, update occupancy to b, m, & r-3. | |
| Aug 27, 2013 | Completed final sign-off Nov 2013 | 901 Market St | defered submittal for the stairs going from 1st to the 2nd floor. permit #2013.0326.3069Details
defered submittal for the stairs going from 1st to the 2nd floor. permit #2013.0326.3069 | |
| Apr 17, 2013 | Completed final sign-off Apr 2014 | 2055 Union St | 3 new skylights (cable). new windows @ 4th floor. fire & smoke sutters @ stairs. future t.i mechanical openings coordate with structural system. fire & smoke shutter @ 3rd floor lightwell.Details
3 new skylights (cable). new windows @ 4th floor. fire & smoke sutters @ stairs. future t.i mechanical openings coordate with structural system. fire & smoke shutter @ 3rd floor lightwell. | $50,000 |
| Mar 26, 2013 | Completed final sign-off Mar 2014 | 901 Market St | struc,arch,mech upgrades on the grd thru 3rd flr. demo of mezzanine, install elevator & a pair of escalators between flrs 1 & 2. infill areas at grd flr where (e) level changes occur & (e) retail entry to basement. add 3rd exit stair from 2nd flr.change use base of atrium from 2nd to 3rd flr.Details
struc,arch,mech upgrades on the grd thru 3rd flr. demo of mezzanine, install elevator & a pair of escalators between flrs 1 & 2. infill areas at grd flr where (e) level changes occur & (e) retail entry to basement. add 3rd exit stair from 2nd flr.change use base of atrium from 2nd to 3rd flr. | $1,500,000 |
| Aug 10, 2012 | Completed final sign-off Nov 2012 | 1928 Fillmore St | new tenant interior t.i. - new fitting room, replace (e) stair to upper level, new drinking fountain, new lighting & finishes.Details
new tenant interior t.i. - new fitting room, replace (e) stair to upper level, new drinking fountain, new lighting & finishes. | $35,000 |
| Aug 1, 2012 | Completed final sign-off Jun 2014 | 2055 Union St | demolition under seperate permit pa# 201212186484. new seismic core & shell retrofit to include new columns, floor & (e) roof reinforecement. (n) foundation & demising walls at ground floor. ((n) elevator/stair & storefront. ab-017Details
demolition under seperate permit pa# 201212186484. new seismic core & shell retrofit to include new columns, floor & (e) roof reinforecement. (n) foundation & demising walls at ground floor. ((n) elevator/stair & storefront. ab-017 | $2,500,000 |
| Jan 11, 2012 | Completed final sign-off Oct 2013 | 240 Post St | install (n) interior stairs & (n) escalators on all floors. no exterior work. fire protection under separate permit. current building is vacant at the remodel area, as allowed per sfbc ab-017, compliance of restrooms will be filed under separate tenant improvement permit.Details
install (n) interior stairs & (n) escalators on all floors. no exterior work. fire protection under separate permit. current building is vacant at the remodel area, as allowed per sfbc ab-017, compliance of restrooms will be filed under separate tenant improvement permit. | $850,000 |
| May 17, 2005 | Never finaled issued May 2005, no final | 400 Sutter St | demo to comply with ab017 2nd floor demo for stairs.Details
demo to comply with ab017 2nd floor demo for stairs. | $30,200 |