Fisher Development Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Jun 2022
- Last 24 months
- 0 permits filed
364 permits since 2000: 255 completed, 61 never finaled, 48 expired or cancelled.
Of the 61 never-finaled permits, 1 is 3 to 5 years old, 23 are 5 to 10 years old, 37 are over 10 years old. 7 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 3 completed. Typically 27 days from filing to permit and 136 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 27, 2018 | Completed final sign-off Sep 2018 | 580 California St | interior work to 23rd fl. remodel of kitchen, restroom vestibule,copy/supply room and small conference room. this scope does not affect existing exit acess, path of egress or exit stairs, exitsting exiting is to remain as is, mep, fire life safety and sprinkler system under separate permit. maher naDetails
interior work to 23rd fl. remodel of kitchen, restroom vestibule,copy/supply room and small conference room. this scope does not affect existing exit acess, path of egress or exit stairs, exitsting exiting is to remain as is, mep, fire life safety and sprinkler system under separate permit. maher na | $250,000 |
| Feb 16, 2010 | Completed final sign-off Nov 2010 | 201 Spear St | offfice ti on 2nd floor unit 220. relocate kitchenette and build two partition walls on the 2nd floorDetails
offfice ti on 2nd floor unit 220. relocate kitchenette and build two partition walls on the 2nd floor | $6,000 |
| Jan 22, 2007 | Completed final sign-off Jul 2007 | 2031 Chestnut St | (n) seating, (n) flooring, (n) kitchen and bar equipment, (n) demo non-structural wall, no mep work involved.Details
(n) seating, (n) flooring, (n) kitchen and bar equipment, (n) demo non-structural wall, no mep work involved. | $65,000 |