37 permits since 2000 (architect on 37 permits): 25 completed, 2 in progress, 9 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 14, 2026 | In progress issued Aug 2026 | 1569 Sloat Bl | Oak Park Construction | proposed warm dark shell renovations to demise existing retail space of approximately 8,731 sf into two (2) new retail spaces suite a300 (1694 sf) and suite a302 (7,037 sf) and provide landlord improvements in suite a300. future tenant in suite a300 to be a pilates studio (under separete permit).Details
proposed warm dark shell renovations to demise existing retail space of approximately 8,731 sf into two (2) new retail spaces suite a300 (1694 sf) and suite a302 (7,037 sf) and provide landlord improvements in suite a300. future tenant in suite a300 to be a pilates studio (under separete permit). | $100,000 |
| Apr 6, 2026 | In progress issued Jul 2026 | 5260 Diamond Heights Bl | T J Nisbet Construction Incorporated | add new elevator and machine room to replace exiting elements along the side of an existing 2 story shopping center. gross sf is 19,322. overall footprint remains generally unchanged as the elevator will replace an existing kiosk. upgrades to mep as req. addition of mech unit on the roof.Details
add new elevator and machine room to replace exiting elements along the side of an existing 2 story shopping center. gross sf is 19,322. overall footprint remains generally unchanged as the elevator will replace an existing kiosk. upgrades to mep as req. addition of mech unit on the roof. | $500,000 |
| Nov 10, 2022 | Completed final sign-off Jan 2023 | 711 Eddy St | Branagh Incorporation | revision to pa# 201808086727, 201804025235, & 202106152499. revision of t-24 report. removal of indoor lighting requirement based on.Details
revision to pa# 201808086727, 201804025235, & 202106152499. revision of t-24 report. removal of indoor lighting requirement based on. | |
| Sep 2, 2022 | Completed final sign-off Oct 2023 | 711 Eddy St | Branagh Incorporation | selective demo & new construction required to connect an (e) electrical fire pump at garage level. selective demo removal of (e) diesel fire pump + some walls, doors, mechanical and electrical equipment. new electrical equipment: a new switchgear to be located in switchboard room at garage level.Details
selective demo & new construction required to connect an (e) electrical fire pump at garage level. selective demo removal of (e) diesel fire pump + some walls, doors, mechanical and electrical equipment. new electrical equipment: a new switchgear to be located in switchboard room at garage level. | $50,000 |
| Feb 17, 2022 | Never finaled issued Feb 2022, no final | 711 Eddy St | Branagh Incorporation | ref fire alarm permit 202010307891. installation of 2 hr rated, enclosure around. fire alarm conduit to supplement fire alarm permit 202010307891.Details
ref fire alarm permit 202010307891. installation of 2 hr rated, enclosure around. fire alarm conduit to supplement fire alarm permit 202010307891. | $5,000 |
| Jun 15, 2021 | Completed final sign-off Jan 2023 | 711 Eddy St | Branagh Incorporation | revision to pa #201808086727 due to changes in the associated permit changes in the field.Details
revision to pa #201808086727 due to changes in the associated permit changes in the field. | |
| Sep 14, 2020 | Never finaled filed Sep 2020, never issued | 425 Mission St | tjpa-ti. suite# 145. revision to issued pa# 201912230294, to add additional partitions. ** maher: n/a **Details
tjpa-ti. suite# 145. revision to issued pa# 201912230294, to add additional partitions. ** maher: n/a ** | ||
| Jan 9, 2020 | Completed final sign-off Sep 2022 | 711 Eddy St | Aegis Enterprises Inc | garage: relocate/add sprinklers to accomodate for plan revs & replace all bracing on (e) 4" bulk main. 1st-13th flrs: relocate/add sprinklers to accomodate for plan revs & replace all (e) copper pipe w/ cvc pipe post fcv @each combination stp. roof: replace (e) copper pipe w/ black sched 40 pipe.Details
garage: relocate/add sprinklers to accomodate for plan revs & replace all bracing on (e) 4" bulk main. 1st-13th flrs: relocate/add sprinklers to accomodate for plan revs & replace all (e) copper pipe w/ cvc pipe post fcv @each combination stp. roof: replace (e) copper pipe w/ black sched 40 pipe. | $950,000 |
| Dec 23, 2019 | Never finaled filed Dec 2019, never issued | 425 Mission St | tjpa-ti. suite 145. demolition for trenching of existing slab. construction of non-bearing partitions, finishes, millwork and fixtures.Details
tjpa-ti. suite 145. demolition for trenching of existing slab. construction of non-bearing partitions, finishes, millwork and fixtures. | $170,000 | |
| Feb 19, 2019 | Completed final sign-off Dec 2022 | 711 Eddy St | Branagh Incorporation | replacement of (e) generator, includes selective demo and assoc plumbing, ducting & electrical work. (n) fuel pump & associated architectural. mep included (ref pa 2018-0808-6727) sffd required. submitted separately cost was paid under ref permitDetails
replacement of (e) generator, includes selective demo and assoc plumbing, ducting & electrical work. (n) fuel pump & associated architectural. mep included (ref pa 2018-0808-6727) sffd required. submitted separately cost was paid under ref permit | |
| Feb 15, 2019 | Completed final sign-off Jul 2019 | 1503 Sloat Bl | Gold Medallion Inc. | installation of a wheelchair lift at an existing exterior stair. n/a for maherDetails
installation of a wheelchair lift at an existing exterior stair. n/a for maher | $15,000 |
| Aug 8, 2018 | Completed final sign-off Dec 2022 | 711 Eddy St | Branagh Incorporation | window replacement. main entrance, int. finish, kitchen & lobby casework, various accessibility upgrades including voluntary accessibility upgrade in 12% of dwelling units, renovation of (e) roof deck, expansion of entry vestibule, new paving entrance, (n) roof, plumbing & electrical upgradesDetails
window replacement. main entrance, int. finish, kitchen & lobby casework, various accessibility upgrades including voluntary accessibility upgrade in 12% of dwelling units, renovation of (e) roof deck, expansion of entry vestibule, new paving entrance, (n) roof, plumbing & electrical upgrades | $27,000,000 |
| May 31, 2018 | Never finaled issued Sep 2018, no final | 199 Pine St | Reeve-Knight Construction Inc. | remove (e) sign box and installation of flush perforated metal panel to support future tenant signage. relocation of blade pangel signage to match adjacent neighbor heights relocation of junction box within new perforated panel. sign permit deferred. **maher n/a**Details
remove (e) sign box and installation of flush perforated metal panel to support future tenant signage. relocation of blade pangel signage to match adjacent neighbor heights relocation of junction box within new perforated panel. sign permit deferred. **maher n/a** | $28,000 |
| Apr 2, 2018 | Never finaled issued Apr 2020, no final | 711 Eddy St | Branagh Incorporation | selective demo of non-bearing partitions, doors, plumbing & lighting fixtures & finishes. proposed work includes new partitions, doors, soffits, finishes & lighting & plumbing fixtures. work includes limited pluming & mechanical. ** maher: n/a **Details
selective demo of non-bearing partitions, doors, plumbing & lighting fixtures & finishes. proposed work includes new partitions, doors, soffits, finishes & lighting & plumbing fixtures. work includes limited pluming & mechanical. ** maher: n/a ** | $148,281 |
| Mar 28, 2017 | Completed final sign-off Jul 2018 | 240 Shotwell St | Roebuck Construction | selective demolition & new construction of non-bearing partitions, finishes & various accessibility upgrades. n ochange to exisitng building square footage. design/build mep. n/a maher ordinanceDetails
selective demolition & new construction of non-bearing partitions, finishes & various accessibility upgrades. n ochange to exisitng building square footage. design/build mep. n/a maher ordinance | $454,290 |
| Aug 17, 2016 | Completed final sign-off May 2017 | 1441 Powell St | Priority Architectural Graphics Dba Prio | 20 evac maps to be reviewed by floor b, 1, 2, 3, 4, 5, 6 sffd onlyDetails
20 evac maps to be reviewed by floor b, 1, 2, 3, 4, 5, 6 sffd only | $4,000 |
| Mar 16, 2016 | Never finaled issued Jul 2017, no final | 40 Dedman Ct | erect 1 story, type v-b, office building.Details
erect 1 story, type v-b, office building. | $108,000 | |
| Mar 1, 2016 | Expired or cancelled cancelled Jan 2026 | 1441 Powell St | revision to 201406259440; plumbing sheets for reviewDetails
revision to 201406259440; plumbing sheets for review | ||
| Nov 10, 2015 | Completed final sign-off Sep 2018 | 603 Keith St | K C K Builders Inc | bldg 13. seismic retrofit soft story mandatory ordinance chapter 34b. 2012 iebc appendix a-4. ** maher: n/a **Details
bldg 13. seismic retrofit soft story mandatory ordinance chapter 34b. 2012 iebc appendix a-4. ** maher: n/a ** | $60,000 |
| Jul 13, 2015 | Completed final sign-off Sep 2016 | 1 Reuel Ct | trash enclosure for the site 9 total.Details
trash enclosure for the site 9 total. | $198,000 | |
| Jul 13, 2015 | Completed final sign-off Sep 2018 | 10 Cashmere St | K C K Builders Inc | trash enclosure for the site 8 total.Details
trash enclosure for the site 8 total. | $176,000 |
| Jun 1, 2015 | Completed final sign-off Sep 2018 | 5 Cashmere St | K C K Builders Inc | building #2. seismic retrofit exsiting building. no work interiors.Details
building #2. seismic retrofit exsiting building. no work interiors. | $3,300 |
| Jun 1, 2015 | Never finaled issued May 2016, no final | 55 Cashmere St | K C K Builders Inc | building #1. seismic retrofit exsiting building. no work interiaors. trash enclosures.Details
building #1. seismic retrofit exsiting building. no work interiaors. trash enclosures. | $3,300 |
| Jun 1, 2015 | Completed final sign-off Sep 2016 | 65 Reuel Ct | K C K Builders Inc | soft story retrofit per sfbc ch34b. building #5. seismic retrofit exsiting building. no work interiaors. iebc a4 used for retrofit.Details
soft story retrofit per sfbc ch34b. building #5. seismic retrofit exsiting building. no work interiaors. iebc a4 used for retrofit. | $3,300 |
| Jun 1, 2015 | Completed final sign-off Sep 2016 | 1 Reuel Ct | K C K Builders Inc | building #7. seismic retrofit exsiting building. no work interiaors. ** maher: n/a **Details
building #7. seismic retrofit exsiting building. no work interiaors. ** maher: n/a ** | $3,300 |
| Jun 1, 2015 | Completed final sign-off Sep 2016 | 15 Reuel Ct | K C K Builders Inc | building #6. soft story retrofit per sfbc chapter 34b & 2012 iebc appendix a-4.Details
building #6. soft story retrofit per sfbc chapter 34b & 2012 iebc appendix a-4. | $3,300 |
| Jun 25, 2014 | Completed final sign-off Apr 2017 | 1441 Powell St | Ncr Construction Inc | b/f & 1/f - work @ health services project includes interior partition relocation, ada upgrade to one bathroom, & replacement of (e) accoustic ceiling tile, selected areas of resilient flooring & base, selected doors, including ada hardware, & all existing lighting.Details
b/f & 1/f - work @ health services project includes interior partition relocation, ada upgrade to one bathroom, & replacement of (e) accoustic ceiling tile, selected areas of resilient flooring & base, selected doors, including ada hardware, & all existing lighting. | $50,000 |
| Jun 25, 2014 | Completed final sign-off Apr 2017 | 1441 Powell St | Ncr Construction Inc | replace window, skylight, sliding door thru-out, new ext paint, int finish upgrades, kitchen casework, shower head, valve & bath lavatory replace @ all units, various ada upgrades incl (5) baths, new roofing & guardrails thru-out,limited mech, plbg upgrades incl ventilation,backup boiler, generatorDetails
replace window, skylight, sliding door thru-out, new ext paint, int finish upgrades, kitchen casework, shower head, valve & bath lavatory replace @ all units, various ada upgrades incl (5) baths, new roofing & guardrails thru-out,limited mech, plbg upgrades incl ventilation,backup boiler, generator | $2,500,000 |
| Nov 26, 2013 | Completed final sign-off Jan 2014 | 1581 Sloat Bl | The Ambrose Group Inc. | removal of existing tenant improvements, demising interior walls. (replacement of existing hvac units under separate mechanical permit).Details
removal of existing tenant improvements, demising interior walls. (replacement of existing hvac units under separate mechanical permit). | $65,000 |
| Oct 2, 2013 | Completed final sign-off Dec 2013 | 1503 Sloat Bl | The Ambrose Group Inc. | removal of existing tenant fixtures and acoustic ceiling. separation of existing electrical distribution, insallation of demising wall. disable access will be complied under separete t.i. permits as allowed by sfbc, ab-017Details
removal of existing tenant fixtures and acoustic ceiling. separation of existing electrical distribution, insallation of demising wall. disable access will be complied under separete t.i. permits as allowed by sfbc, ab-017 | $120,000 |
| Aug 8, 2012 | Completed final sign-off Oct 2013 | 140 Cashmere St | D & H Construction | renov & addition to (e) apt hsg develp-community bldg; (n) furance, walls, coffee bar, ada bathrm, plumb, light, & finish. office addition approx 400 sf. note-work includes (n) trash encls/screen, grading, drainage & landscape work that spans lots 001/002/003/005.Details
renov & addition to (e) apt hsg develp-community bldg; (n) furance, walls, coffee bar, ada bathrm, plumb, light, & finish. office addition approx 400 sf. note-work includes (n) trash encls/screen, grading, drainage & landscape work that spans lots 001/002/003/005. | $175,000 |
| Dec 23, 2011 | Never finaled issued Oct 2012, no final | 120 Cashmere St | D & H Construction | interior & exterior renovation & replacement inkind & to comply w/ nov 200842131 includes siding, doors & windows, interior finishes, appliances, cabinets, plumbing & electrical fixtures. at 120a,b,c,d,e,f cashmere st and 130a,b,c,d,e,f cashmere st.Details
interior & exterior renovation & replacement inkind & to comply w/ nov 200842131 includes siding, doors & windows, interior finishes, appliances, cabinets, plumbing & electrical fixtures. at 120a,b,c,d,e,f cashmere st and 130a,b,c,d,e,f cashmere st. | $286,320 |
| Dec 23, 2011 | Completed final sign-off Oct 2013 | 140 Cashmere St | D & H Construction | interior & exterior renovation, replacement inkind includes siding, roofing, doors, windows, interior finishes, cabinets, appliances, plumbing, electrical fxtures. also includes site work for whole project. at 140 cashmere st.Details
interior & exterior renovation, replacement inkind includes siding, roofing, doors, windows, interior finishes, cabinets, appliances, plumbing, electrical fxtures. also includes site work for whole project. at 140 cashmere st. | $132,000 |
| Dec 23, 2011 | Completed final sign-off Sep 2013 | 1 Dedman Ct | D & H Construction | interior & exterior renovation & replacement inkind & to comply w/ nov 201143102 includes siding, windows, doors,interior finishes, cabinets, appliances, plumb & elec. at 1,3,5,7,9,11,15,17,19,21,23,25,27,29,31 deeman ct. reroofing under separate permit. accessible features per 11a shall be maintainDetails
interior & exterior renovation & replacement inkind & to comply w/ nov 201143102 includes siding, windows, doors,interior finishes, cabinets, appliances, plumb & elec. at 1,3,5,7,9,11,15,17,19,21,23,25,27,29,31 deeman ct. reroofing under separate permit. accessible features per 11a shall be maintain | $451,360 |
| Dec 23, 2011 | Completed final sign-off Oct 2013 | 100 Cashmere St | D & H Construction | interior & exterior renovation & replacement in-kind includes siding, doors, windows & interior finishes, appliances, cabinets, plumbing & electrical fixtures. at 100a,b,c,d,e,f cashmere st and 110a,b,c,d,e,f cashmere st.Details
interior & exterior renovation & replacement in-kind includes siding, doors, windows & interior finishes, appliances, cabinets, plumbing & electrical fixtures. at 100a,b,c,d,e,f cashmere st and 110a,b,c,d,e,f cashmere st. | $285,600 |
| Dec 23, 2011 | Never finaled issued Oct 2012, no final | 150 Cashmere St | D & H Construction | interior & exterior renovation & replacement inkind including siding, roofing, doors, windows, interior finishes, appliances, cabinets, plumbing & electrical fixtures. at 150a,b,c,d,e,f cashmere st and 160a,b,c,d,e,f cashmere st.Details
interior & exterior renovation & replacement inkind including siding, roofing, doors, windows, interior finishes, appliances, cabinets, plumbing & electrical fixtures. at 150a,b,c,d,e,f cashmere st and 160a,b,c,d,e,f cashmere st. | $286,320 |
| Dec 23, 2011 | Completed final sign-off Oct 2013 | 170 Cashmere St | D & H Construction | interior & exterior renovation,replacement inkind including siding, roofing, doors, windows, interior finishes, cabinets, appliances, plumbing & electrical fixtures. at 170a,b,c,d,e,f cashmere st and 180a,b,c,d,e,f cashmere st.Details
interior & exterior renovation,replacement inkind including siding, roofing, doors, windows, interior finishes, cabinets, appliances, plumbing & electrical fixtures. at 170a,b,c,d,e,f cashmere st and 180a,b,c,d,e,f cashmere st. | $222,120 |