Christopher Roach
- Listed as
- architect
- Firm
- Studio Vara Architecute
- Based in
- San Francisco
- On San Francisco permits
- Jun 2015 to Feb 2026
36 permits since 2000 (architect on 36 permits): 25 completed, 5 in progress, 4 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 12, 2026 | In progress filed Feb 2026, not yet issued | 601 Laguna St | W E Lyons Construction Co | pacifica sfo is renovating an existing residential care facility for the elderly into an adult residential facility for sf dph as part of a purchase agreement with ccsf. the scope of work includes repair, replacement & or restoration of finishes, replacement of hvac equipment, accessibility upgradesDetails
pacifica sfo is renovating an existing residential care facility for the elderly into an adult residential facility for sf dph as part of a purchase agreement with ccsf. the scope of work includes repair, replacement & or restoration of finishes, replacement of hvac equipment, accessibility upgrades | $1,264,297 |
| May 5, 2025 | In progress issued Nov 2025 | 3355 Pacific Av | Fma Builders | revision 202108236937 and ref 202404059401- changes to interior layout infill enclose under (e) deck, in kind replacment of windows, doors, siding, and roof deck add rooftop mechanical screening, reconfigure side yard walkway mech for future battery storage systemDetails
revision 202108236937 and ref 202404059401- changes to interior layout infill enclose under (e) deck, in kind replacment of windows, doors, siding, and roof deck add rooftop mechanical screening, reconfigure side yard walkway mech for future battery storage system | $100,001 |
| Jun 26, 2024 | Completed final sign-off Oct 2024 | 535 Pacific Av | Plant Construction Co, Lp | basement, 1st, 2nd, & 4th level demo only. no structural. ab 017Details
basement, 1st, 2nd, & 4th level demo only. no structural. ab 017 | $50,000 |
| Apr 22, 2024 | In progress issued Feb 2025 | 3355 Pacific Av | Fma Builders, Partners Contracting Inc. | revision to pa 202108236937. change media and gym rooms to new natatorium. expand scope of work to include new interior swimming pool, subterranean mechanical, electrical, and pool equipment vault beneath rear yard. no change to building exterior or conditioned area. add new fire sprinkler system thDetails
revision to pa 202108236937. change media and gym rooms to new natatorium. expand scope of work to include new interior swimming pool, subterranean mechanical, electrical, and pool equipment vault beneath rear yard. no change to building exterior or conditioned area. add new fire sprinkler system th | $850,000 |
| Apr 11, 2024 | Completed final sign-off Jun 2024 | 843 Montgomery St | Acosta And Sons Inc | partition of finishes & fixtures. change of occupancy from m to b ab-017. ref de pa 2024-03188020. level 1 & mezzanine fire sprinkler referredDetails
partition of finishes & fixtures. change of occupancy from m to b ab-017. ref de pa 2024-03188020. level 1 & mezzanine fire sprinkler referred | $20,000 |
| Mar 18, 2024 | Completed final sign-off Jun 2024 | 843 Montgomery St | Acosta And Sons Inc | demo only for future ti ab-017 common amenitiesDetails
demo only for future ti ab-017 common amenities | $15,000 |
| Jan 29, 2024 | Completed final sign-off Apr 2024 | 2724 Pacific Av | J & A General Construction | replace less than 50% of (e) deck located at rear on top of roof carriage house from wood surface to stone paving. all framing to remain .Details
replace less than 50% of (e) deck located at rear on top of roof carriage house from wood surface to stone paving. all framing to remain . | $9,185 |
| Jul 26, 2023 | Completed final sign-off Nov 2023 | 470 Pacific Av | Plant Construction Co, Lp | revision to pa# 202212239073 & 202112234962, relocate service bar to anteroom, new partitions, update mep per plan.Details
revision to pa# 202212239073 & 202112234962, relocate service bar to anteroom, new partitions, update mep per plan. | $30,000 |
| Dec 23, 2022 | Completed final sign-off Nov 2023 | 470 Pacific Av | Plant Construction Co, Lp | rev to pa# 2021-1223-4962 to incorporate misc design changes by new aorDetails
rev to pa# 2021-1223-4962 to incorporate misc design changes by new aor | |
| Dec 20, 2022 | Completed final sign-off Feb 2024 | 4930 17th St | Aaron Gordon Construction Inc | renovation of e 2 unit residence at 1st, 2nd, and 3rd levels. no change to the height, exterior envelope, square footage, street facade proposed. kitchen and bathsDetails
renovation of e 2 unit residence at 1st, 2nd, and 3rd levels. no change to the height, exterior envelope, square footage, street facade proposed. kitchen and baths | $100,000 |
| Dec 20, 2022 | In progress issued Feb 2025 | 596 Pacific Av | Ravizza Design And Construction Inc | prop h. renovation of former cafe to build-out new gelato & espresso cafe, creating production room bars, displays, and finishesDetails
prop h. renovation of former cafe to build-out new gelato & espresso cafe, creating production room bars, displays, and finishes | $146,538 |
| Dec 19, 2022 | In progress issued Feb 2025 | 228 Jersey St | 415 Remodeling Inc, Aaron Gordon Construction Inc | renovation of an (e) 2-story single family home, including: (1) demo (e) rear yard porch, (2) new single story addition at rear, (3) new interior wall layout, (4) replacing existing foundation w/ associated excavation work, (5) repair/replace exterior finishes, (6) replacing exterior windows & doorsDetails
renovation of an (e) 2-story single family home, including: (1) demo (e) rear yard porch, (2) new single story addition at rear, (3) new interior wall layout, (4) replacing existing foundation w/ associated excavation work, (5) repair/replace exterior finishes, (6) replacing exterior windows & doors | $400,000 |
| Jun 6, 2022 | Completed final sign-off Nov 2023 | 470 Pacific Av | Plant Construction Co, Lp | replacement of existing storefront. demolish and replace storefront with new in existing opening.Details
replacement of existing storefront. demolish and replace storefront with new in existing opening. | $60,000 |
| Oct 19, 2021 | Never finaled filed Oct 2021, never issued | 2724 Pacific Av | removal of an existing, attached, unconditioned greenhouse and replacement with a new, attached, unconditioned greenhouse. work includes a new water closet, landscape improvements, a new patio, outdoor kitchen, and in-grade spa.Details
removal of an existing, attached, unconditioned greenhouse and replacement with a new, attached, unconditioned greenhouse. work includes a new water closet, landscape improvements, a new patio, outdoor kitchen, and in-grade spa. | $450,000 | |
| Oct 15, 2020 | Completed final sign-off Apr 2026 | 10 05th Av | Kenneally Construction, Eastwood Development Incorporated | replace (e) foundation, excavate partial building footprint for (n) mat slab. interior remodel basement and 1st floor. new mud room, bedroom, living room with wet bar and full bath at bsmt level. partial window replacement, side and rear.Details
replace (e) foundation, excavate partial building footprint for (n) mat slab. interior remodel basement and 1st floor. new mud room, bedroom, living room with wet bar and full bath at bsmt level. partial window replacement, side and rear. | $1,000,000 |
| Oct 15, 2020 | Completed final sign-off Apr 2026 | 10 05th Av | Eastwood Development Incorporated | horizontal addition at rear of building. general interior remodel at floors 2 & 3. window replacement throughout.Details
horizontal addition at rear of building. general interior remodel at floors 2 & 3. window replacement throughout. | $1,000,000 |
| Sep 27, 2020 | Completed final sign-off Feb 2023 | 2724 Pacific Av | Cello & Maudru Construction Co Inc | demo of (e) pedestriant gate and construction of a new pedestrian gate.Details
demo of (e) pedestriant gate and construction of a new pedestrian gate. | $10,000 |
| Jun 19, 2019 | Completed final sign-off Jan 2021 | 2724 Pacific Av | Cello & Maudru Construction Co Inc | structural upgrades to (e) deck and conditioning of (e) garage house. no changes to building envelope. new deck guard railing to meet current building standards. existing deck surface surface to be replaced in-kind. reinforcement of (e) stairs. re-grading of garden rrof area for correct drainage.Details
structural upgrades to (e) deck and conditioning of (e) garage house. no changes to building envelope. new deck guard railing to meet current building standards. existing deck surface surface to be replaced in-kind. reinforcement of (e) stairs. re-grading of garden rrof area for correct drainage. | $45,000 |
| Jun 18, 2019 | Never finaled issued Aug 2021, no final | 760 Dolores St | residential renovation to historic 2-unit building. horizontal expansion @ rear of property. work includes remodel & relocate kitchen, (2) remodeled bathrooms. no work proposed at lower unitDetails
residential renovation to historic 2-unit building. horizontal expansion @ rear of property. work includes remodel & relocate kitchen, (2) remodeled bathrooms. no work proposed at lower unit | $390,100 | |
| Jun 14, 2019 | Expired or cancelled expired Oct 2019 | 150 Parker Av | Beyond Basics Construction | barrier removal only for an existing bathroom that does consist of child water closet and adult water closet per 2016 iib202,4 exception 4Details
barrier removal only for an existing bathroom that does consist of child water closet and adult water closet per 2016 iib202,4 exception 4 | $40,000 |
| May 15, 2019 | Completed final sign-off Oct 2019 | 117 Diamond St | Cahill Contractors Llc. | structural strengthening of 2 basement walls & associated footings. 2 proposed nonstructural 1 hour rated partitions to replace extg non-structural partitions. re-roofing. new skylight. accessibility upgrades including parking lot accessible stall restriping & path. nw exterior stair.Details
structural strengthening of 2 basement walls & associated footings. 2 proposed nonstructural 1 hour rated partitions to replace extg non-structural partitions. re-roofing. new skylight. accessibility upgrades including parking lot accessible stall restriping & path. nw exterior stair. | $274,317 |
| May 7, 2019 | Completed final sign-off Aug 2019 | 117 Diamond St | Cahill Contractors Llc. | abatement of asbestos per haz mat report dated 8/30/88. includes removal of contaminated materiasl and replacement where asbestos is present in basement level and the stairwellsDetails
abatement of asbestos per haz mat report dated 8/30/88. includes removal of contaminated materiasl and replacement where asbestos is present in basement level and the stairwells | $7,500 |
| Jan 30, 2019 | Completed final sign-off Jan 2021 | 2716 Pacific Av | Cello & Maudru Construction Co Inc | removal of failing, free standing, unreinforced brick landscape wall. infill w/ grade to match (e0 grade.Details
removal of failing, free standing, unreinforced brick landscape wall. infill w/ grade to match (e0 grade. | $2,500 |
| Nov 1, 2018 | Completed final sign-off Mar 2022 | 2260 Washington St | Upscale Construction Inc. | horizontal addition of 406 sf & interior remodel. work @ basement. limited to structural work. work @ level 1 & 2 include structural, interior reconfiguration. new windows, new railing on (e) deck. roof work to match new addition to (e) claytile roof & use (e) drainage. new exterior to match (e).Details
horizontal addition of 406 sf & interior remodel. work @ basement. limited to structural work. work @ level 1 & 2 include structural, interior reconfiguration. new windows, new railing on (e) deck. roof work to match new addition to (e) claytile roof & use (e) drainage. new exterior to match (e). | $360,000 |
| Aug 1, 2018 | Completed final sign-off Jan 2021 | 2724 Pacific Av | Cello & Maudru Construction Co Inc | clarification providing structural drawings & details for equipment pad permit, ref pa# 201707192389.Details
clarification providing structural drawings & details for equipment pad permit, ref pa# 201707192389. | |
| Jul 18, 2018 | Completed final sign-off Jan 2021 | 2724 Pacific Av | Cello & Maudru Construction Co Inc | revision to app#2017 0719 2389 & #2016 0428 5993 to remediate dryrot. work includes interior garage column and slab replacement, framing replacement, water proofing of bldg envelpoe and inkind reconstruction of gutters and downspouts.Details
revision to app#2017 0719 2389 & #2016 0428 5993 to remediate dryrot. work includes interior garage column and slab replacement, framing replacement, water proofing of bldg envelpoe and inkind reconstruction of gutters and downspouts. | $150,000 |
| Jul 19, 2017 | Completed final sign-off Jan 2021 | 2724 Pacific Av | Cello & Maudru Construction Co Inc | supersedes #2016-0428-5993 to reduce basement level expansion, remove pool and renovate floors 1-3Details
supersedes #2016-0428-5993 to reduce basement level expansion, remove pool and renovate floors 1-3 | |
| May 2, 2016 | Never finaled issued May 2016, no final | 2974 Pacific Av | new skylight on roof. no other work. maher naDetails
new skylight on roof. no other work. maher na | $5,000 | |
| Apr 28, 2016 | Completed final sign-off Feb 2021 | 2724 Pacific Av | Barcewski Inc Dba Sunshine Construction, Cello & Maudru Construction Co Inc, Van Acker Const Assoc Inc | horizontal addition. replace foundation & rooms down addition(1680sf of(n) occupied space).bsmt fl reconfiguration, incl (n)rooms lightwell, stairs, pool(under separate permit). excavation of 1620 cubic yards of soil. no work @ (e) carriage house & attached garage.Details
horizontal addition. replace foundation & rooms down addition(1680sf of(n) occupied space).bsmt fl reconfiguration, incl (n)rooms lightwell, stairs, pool(under separate permit). excavation of 1620 cubic yards of soil. no work @ (e) carriage house & attached garage. | $250,000 |
| Mar 18, 2016 | Never finaled issued Apr 2016, no final | 2974 Pacific Av | Van Acker Const Assoc Inc | interior remodel, demo non bearing wall, (n) kitchen, (n) bath, enlarge (e) 1st floor laundry for (n) boiler & (n) h20 storage tank. voluntary seismic upgrade.Details
interior remodel, demo non bearing wall, (n) kitchen, (n) bath, enlarge (e) 1st floor laundry for (n) boiler & (n) h20 storage tank. voluntary seismic upgrade. | $95,000 |
| Jan 29, 2016 | Completed final sign-off Feb 2017 | 2288 Broadway | Moroso Construction Inc | unit #4: all existing exterior windows to be replaced in kind. remodel kitchen: appliances and plumbing fixtures to remain in extg locations. remodel bathrooms, minor partition work at non-bearing walls in living room, bedroom 1,bedroom 2, and master bedroom new lighting.Details
unit #4: all existing exterior windows to be replaced in kind. remodel kitchen: appliances and plumbing fixtures to remain in extg locations. remodel bathrooms, minor partition work at non-bearing walls in living room, bedroom 1,bedroom 2, and master bedroom new lighting. | $450,000 |
| Jan 8, 2016 | Expired or cancelled cancelled May 2018 | 312 Baker St | per ordinance no 30-15, const 4 new dwelling units in basement including new rear exterior patio, interior patitions, floor, ceiling, elect & plumb work. 2 new windows will be addedto front facade; 2 windows and 2 doors to rear facade, a soft story seismic retrofit unde be done permit 201512225771.Details
per ordinance no 30-15, const 4 new dwelling units in basement including new rear exterior patio, interior patitions, floor, ceiling, elect & plumb work. 2 new windows will be addedto front facade; 2 windows and 2 doors to rear facade, a soft story seismic retrofit unde be done permit 201512225771. | $727,560 | |
| Oct 30, 2015 | Completed final sign-off Mar 2017 | 200 Brannan St | Upscale Construction Inc., Justin Farrelly Incorporated | #436 - interior - kitchen & bath remodel of existing condominium. n/a maher ordinanceDetails
#436 - interior - kitchen & bath remodel of existing condominium. n/a maher ordinance | $185,000 |
| Jul 2, 2015 | Completed final sign-off Nov 2016 | 1001 Chestnut St | Dijeau Poage Construction Inc. | interior work -partial interior renovation at 1st & 2nd floors including full kitchen & baths remodel. no structural work proposed.Details
interior work -partial interior renovation at 1st & 2nd floors including full kitchen & baths remodel. no structural work proposed. | $35,000 |
| Jun 23, 2015 | Completed final sign-off Sep 2016 | 760 Church St | legalize windows installed beyond scope of permit by previous owner. new windows to return 2nd fl facade to original historic intent. new windows to meet title 24Details
legalize windows installed beyond scope of permit by previous owner. new windows to return 2nd fl facade to original historic intent. new windows to meet title 24 | $15,000 | |
| Jun 12, 2015 | Completed final sign-off Apr 2016 | 4930 17th St | Dijeau Poage Construction Inc. | renovation of e 2 units residential at 1st, 2nd fl. 25 % reallocation of 1st fl unit 4932, new kitchen and interior stair. removal of exterior statirs, new terrace at rear, replace doors and windows at 1st flDetails
renovation of e 2 units residential at 1st, 2nd fl. 25 % reallocation of 1st fl unit 4932, new kitchen and interior stair. removal of exterior statirs, new terrace at rear, replace doors and windows at 1st fl | $150,000 |