Steve Walker
- Listed as
- architect, authorized agent-others, designer
- Firm
- Steve Walker Studio Inc
- Based in
- Oakland
- On San Francisco permits
- Aug 2004 to Sep 2026
71 permits since 2000 (architect on 63 permits, authorized agent-others on 9 permits, designer on 1 permit): 41 completed, 9 in progress, 10 never finaled, 11 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 17, 2026 | In progress filed Sep 2026, not yet issued | 563 02nd St | convert existing restaurant and brewery into office. demo kitchen and alteration of mechanical systems. lighting and controls. new water heater to comply with t24 energy standards. existing restrooms to remain.Details
convert existing restaurant and brewery into office. demo kitchen and alteration of mechanical systems. lighting and controls. new water heater to comply with t24 energy standards. existing restrooms to remain. | $100,000 | |
| Jul 29, 2026 | In progress filed Jul 2026, not yet issued | 563 02nd St | Kells Construction Inc. | renewal of pa 9912819 (ref 202603238054) for inpsection of as-built conditions reviewd, approved and inspected. this permit covers m.e.p work constructed w/o approval, to complete core & shell work to an (e) restaurant & brewery. food service spaces are not part of this permit.Details
renewal of pa 9912819 (ref 202603238054) for inpsection of as-built conditions reviewd, approved and inspected. this permit covers m.e.p work constructed w/o approval, to complete core & shell work to an (e) restaurant & brewery. food service spaces are not part of this permit. | |
| May 4, 2026 | In progress issued Jun 2026 | 1345 Rhode Island St | Barcci Builders Inc | kitchen renovation/alteration. replace rear window in kind. no new plumbing fixtures.Details
kitchen renovation/alteration. replace rear window in kind. no new plumbing fixtures. | $25,000 |
| Mar 6, 2026 | In progress issued Mar 2026 | 163 Jessie St | Bay Structural Iron Works Inc | to comply with accessible business entrance program abe #202207012255. addition of a ramp in the sidewalk area. minor sidewalk encroachment granted. see 24 mse-00195Details
to comply with accessible business entrance program abe #202207012255. addition of a ramp in the sidewalk area. minor sidewalk encroachment granted. see 24 mse-00195 | $5,000 |
| Dec 12, 2025 | Completed final sign-off Mar 2026 | 8 Mint Pz | Eco Systems Heating & Air | to abate nov 202540672- remove (e) type 1 grease hood and install (n) listed type 1 grease hood. install (n) listed ventless electrica cambi oven and (e) make up air and type 1 grease hoodDetails
to abate nov 202540672- remove (e) type 1 grease hood and install (n) listed type 1 grease hood. install (n) listed ventless electrica cambi oven and (e) make up air and type 1 grease hood | $5,000 |
| Oct 2, 2025 | In progress issued Oct 2025 | 333 Fremont St | West End Construction Corp | (n) address sign and armtaureDetails
(n) address sign and armtaure | $50,000 |
| Sep 19, 2025 | In progress issued Oct 2025 | 333 Fremont St | West End Construction Corp | new entrance awningDetails
new entrance awning | $50,000 |
| Jun 13, 2025 | Expired or cancelled withdrawn Sep 2025 | 333 Fremont St | new canopy and building signage.Details
new canopy and building signage. | $150,000 | |
| May 21, 2025 | Completed final sign-off Feb 2026 | 333 Fremont St | West End Construction Corp | alteration to existing lobby and manager's office. new finishes, new electrical fixtures, new ventilation. relocate existing entrance door, add new glass partition.Details
alteration to existing lobby and manager's office. new finishes, new electrical fixtures, new ventilation. relocate existing entrance door, add new glass partition. | $100,000 |
| Dec 27, 2024 | Completed final sign-off Jan 2025 | 235 Columbus Av | abe 202002111993- install of power door operator for tech infeasibility.Details
abe 202002111993- install of power door operator for tech infeasibility. | $1,000 | |
| Dec 27, 2024 | Completed final sign-off Apr 2025 | 217 Columbus Av | abe 202002111996- install of power door operator for tech infeasibility. install larger (36") leaf in (e) storefront.Details
abe 202002111996- install of power door operator for tech infeasibility. install larger (36") leaf in (e) storefront. | $1,000 | |
| Dec 9, 2024 | Completed final sign-off May 2025 | 19 Jordan Av | Teutonic Construction Inc | bathroom alterations to the first and second levels. work includes demo of non structural partitions, new partitions new finishes, cabinetry and plumbing fixtures, lighting and vent fansDetails
bathroom alterations to the first and second levels. work includes demo of non structural partitions, new partitions new finishes, cabinetry and plumbing fixtures, lighting and vent fans | $15,000 |
| Jun 12, 2024 | In progress issued Feb 2025 | 2331 Jackson St | Rod Heisler Construction | 122-sqft horizontal addition @ 2/f within (e) roof outline, lower driveway elevation by excavating 18-cu yards, ground flr bathroom remodel, replace (e) rear deck tile and guardrails, reaplce (e) rear juliet balcony, add new 30x36 roof hatch.Details
122-sqft horizontal addition @ 2/f within (e) roof outline, lower driveway elevation by excavating 18-cu yards, ground flr bathroom remodel, replace (e) rear deck tile and guardrails, reaplce (e) rear juliet balcony, add new 30x36 roof hatch. | $415,000 |
| Jun 12, 2024 | Completed final sign-off Jul 2024 | 25 Burrows St | to comply with accessible business entrance program per ord 51-16. ref abe202406110150 - technical infeasibility. installation of signage and doorbell and door operatorDetails
to comply with accessible business entrance program per ord 51-16. ref abe202406110150 - technical infeasibility. installation of signage and doorbell and door operator | $50 | |
| May 22, 2024 | In progress filed May 2024, not yet issued | 213 Upper Tr | Teutonic Construction Inc | erect a 4 story, type -va, two family residential structure. f/s deffered.Details
erect a 4 story, type -va, two family residential structure. f/s deffered. | $1,000,000 |
| May 22, 2024 | In progress filed May 2024, not yet issued | 213 Upper Tr | Teutonic Construction Inc | demolish a 3-story, type-vb, single family home.Details
demolish a 3-story, type-vb, single family home. | $10,000 |
| Mar 13, 2024 | Expired or cancelled withdrawn Sep 2025 | 163 Jessie St | to comply with accessible business entrance program abe #202207012255. addition of a ramp in the sidewalk area. request technical infeasibility for landing. minor sidewalk encroachment permit.Details
to comply with accessible business entrance program abe #202207012255. addition of a ramp in the sidewalk area. request technical infeasibility for landing. minor sidewalk encroachment permit. | $5,000 | |
| Feb 28, 2024 | Completed final sign-off May 2024 | 414 20th Av | to comply with the accessible business entry program. abe# 201810162292. request determination of technical infeasibility. provide signage and doorbell.Details
to comply with the accessible business entry program. abe# 201810162292. request determination of technical infeasibility. provide signage and doorbell. | $20 | |
| Feb 28, 2024 | Completed final sign-off May 2025 | 292 Divisadero St | to comply with accessible business entrance program (abe #201901234620) request determination of technical infeasability. add signage, doorbell, and handrail on one side.Details
to comply with accessible business entrance program (abe #201901234620) request determination of technical infeasability. add signage, doorbell, and handrail on one side. | $20 | |
| Mar 15, 2023 | Completed final sign-off Jun 2023 | 3801 24th St | Teutonic Construction Inc | to comply with abe program per ord 51-16. ref abe 202205251040. provide signage at (e) doorbell to provide disabled assistance. provide contrasting stripe at step. request determination of technical infeasibility.Details
to comply with abe program per ord 51-16. ref abe 202205251040. provide signage at (e) doorbell to provide disabled assistance. provide contrasting stripe at step. request determination of technical infeasibility. | $100 |
| Mar 15, 2023 | Completed final sign-off Jun 2023 | 3807 24th St | Teutonic Construction Inc | to comply with abe program per ord 51-16. ref abe 202205251043. provide signage at (e) doorbell to provide disabled assistance. provide contrasting stripe at step. request determination of technical infeasibility.Details
to comply with abe program per ord 51-16. ref abe 202205251043. provide signage at (e) doorbell to provide disabled assistance. provide contrasting stripe at step. request determination of technical infeasibility. | $100 |
| Mar 7, 2023 | Completed final sign-off Apr 2023 | 1546 Guerrero St | abe compliance #202109213043. provide signage at (e) doorbell to provide disabled assistance. provide contrasting stripe on step. request determination of technical infeasibility.Details
abe compliance #202109213043. provide signage at (e) doorbell to provide disabled assistance. provide contrasting stripe on step. request determination of technical infeasibility. | $100 | |
| Jan 12, 2023 | Expired or cancelled withdrawn Aug 2023 | 525 07th St | Tamalpais Construction Company | revision to pa# 202201316970, add urinal into previously approved bathroomDetails
revision to pa# 202201316970, add urinal into previously approved bathroom | $1,000 |
| Oct 25, 2022 | Completed final sign-off Sep 2024 | 511 Laguna Honda Bl | Teutonic Construction Inc | revision to permits 202009103845 and 202111102197. add 4 burner stove/oven.Details
revision to permits 202009103845 and 202111102197. add 4 burner stove/oven. | |
| Jul 15, 2022 | Completed final sign-off Mar 2023 | 531 Commercial St | Teutonic Construction Inc | alteration to existing restaurant/bar including accessibility upgrades to (e) restrooms, replacing (e) equipment and reparing finishes in-kind.Details
alteration to existing restaurant/bar including accessibility upgrades to (e) restrooms, replacing (e) equipment and reparing finishes in-kind. | $26,000 |
| Jul 1, 2022 | Never finaled issued Jul 2022, no final | 2 Locust St | Teutonic Construction Inc | in kind window replacement with new dbl glazed units in kind kitchen remodel. in kind bath remodel.Details
in kind window replacement with new dbl glazed units in kind kitchen remodel. in kind bath remodel. | $50,000 |
| Feb 10, 2022 | Never finaled issued Apr 2022, no final | 1425 Folsom St | Teutonic Construction Inc | art gallery/event space w/bar, widening of egress components (doors, stairs, partitions) to allow for increase in allowable occupants. structural reinforcement & new equipment pad on lower roof for future equipment under separate permit. future kitchen remodel under separate permit.Details
art gallery/event space w/bar, widening of egress components (doors, stairs, partitions) to allow for increase in allowable occupants. structural reinforcement & new equipment pad on lower roof for future equipment under separate permit. future kitchen remodel under separate permit. | $50,000 |
| Sep 10, 2020 | Completed final sign-off Sep 2024 | 511 Laguna Honda Bl | Teutonic Construction Inc | alteration of an unimproved residential storage area (1500 sq ft) to a residentil daycare for less than 6 preschool age children including new bathrooms, new partitions, electrical, mechanical, & plumbing work. replace garage door with window & door. new patio @ rear yard.Details
alteration of an unimproved residential storage area (1500 sq ft) to a residentil daycare for less than 6 preschool age children including new bathrooms, new partitions, electrical, mechanical, & plumbing work. replace garage door with window & door. new patio @ rear yard. | $50,000 |
| Aug 22, 2020 | Expired or cancelled withdrawn Sep 2024 | 18 Palm Av | Teutonic Construction Inc | alteration/addition to an existing 3-story single family residence including new walls, stair, roof and electrical, plumbing and mechanical systems.Details
alteration/addition to an existing 3-story single family residence including new walls, stair, roof and electrical, plumbing and mechanical systems. | $360,000 |
| Jun 26, 2020 | Never finaled issued Aug 2020, no final | 20 Woodside Av | minor alteration of (e) child care facility, demo of (e) partitons, addition of new parttions, interior doors, and replacing one window with doorDetails
minor alteration of (e) child care facility, demo of (e) partitons, addition of new parttions, interior doors, and replacing one window with door | $5,000 | |
| Sep 26, 2019 | Completed final sign-off Dec 2020 | 3410 Judah St | Home Improvement Company | change of use from office to restaurant/bar - interior rmeoval to include ada retroom upgrade, non-structural partitions & fixtures & finishes.Details
change of use from office to restaurant/bar - interior rmeoval to include ada retroom upgrade, non-structural partitions & fixtures & finishes. | $60,000 |
| May 22, 2019 | Completed final sign-off Feb 2020 | 1518 09th Av | Gentry Stanley | 3/f only -demo of (e) 3rd flr bathroom, fixtures & finishes, and non structural partitionsDetails
3/f only -demo of (e) 3rd flr bathroom, fixtures & finishes, and non structural partitions | $75,000 |
| Apr 18, 2019 | Completed final sign-off Mar 2022 | 2757 Harrison St | this is as-built drawings submitted in response to comply with nov #201932881. roof deck completed in aug 2017, per permit #201509157031/s2 was built larger than shown in permit drawings. deck and parapets meet variance guidelines as issued for project. reduce to 499 sfDetails
this is as-built drawings submitted in response to comply with nov #201932881. roof deck completed in aug 2017, per permit #201509157031/s2 was built larger than shown in permit drawings. deck and parapets meet variance guidelines as issued for project. reduce to 499 sf | $2,200 | |
| Mar 18, 2019 | Completed final sign-off Dec 2022 | 1542 24th Av | Kuality Constructions | addition of new rear yard deck. replace (e) windows on 2nd floor.Details
addition of new rear yard deck. replace (e) windows on 2nd floor. | $50,000 |
| Apr 21, 2017 | Expired or cancelled cancelled Jan 2026 | 2422 Mission St | addition of plumbing and electrical work for future ada restroom. ref app#201611303780Details
addition of plumbing and electrical work for future ada restroom. ref app#201611303780 | $20,000 | |
| Nov 30, 2016 | Completed final sign-off May 2017 | 1123 Folsom St | D N S Construction | space 1: demo of non load bearing partitions. rebuild existing bar area, no change of occupancy load and new ada restroom under separate permit. no additional square footage. 2017.0131.8321 (different lot)Details
space 1: demo of non load bearing partitions. rebuild existing bar area, no change of occupancy load and new ada restroom under separate permit. no additional square footage. 2017.0131.8321 (different lot) | $60,000 |
| Nov 30, 2016 | Completed final sign-off Sep 2017 | 2422 Mission St | Teutonic Construction Inc | demo of non load bearing partitions, new ada entry, new offices, removal of interior platformDetails
demo of non load bearing partitions, new ada entry, new offices, removal of interior platform | $32,000 |
| Jun 30, 2015 | Completed final sign-off Nov 2015 | 125 Stillman St | Thomas Kessenich | tenant improvement in an (e) space, demolition of (e) bathroom & ceilings, construction of new partitions,new restrooms & finishes. electrical & mech work by separate permit. no change of occupancy; maher n/aDetails
tenant improvement in an (e) space, demolition of (e) bathroom & ceilings, construction of new partitions,new restrooms & finishes. electrical & mech work by separate permit. no change of occupancy; maher n/a | $100,000 |
| May 7, 2015 | Completed final sign-off Jun 2017 | 600 Van Ness Av | Evans Brothers Inc | demolish two story restaurant building.Details
demolish two story restaurant building. | $30,000 |
| May 1, 2015 | Completed final sign-off Aug 2016 | 115 Sansome St | Teutonic Construction Inc | ground floor tenant improvement in (e) vacant space. construction of new bar including finishes, millwork, equipment lighting & plumbing. no exterior work.Details
ground floor tenant improvement in (e) vacant space. construction of new bar including finishes, millwork, equipment lighting & plumbing. no exterior work. | $500,000 |
| May 27, 2014 | Completed final sign-off Jun 2014 | 1695 Polk St | letter to document site conditions of rebuilt mezzanine stairDetails
letter to document site conditions of rebuilt mezzanine stair | ||
| Apr 3, 2014 | Completed final sign-off Jun 2014 | 1695 Polk St | revision to appl #2013.1210.3827 - removal of proposed windows in north exterior wall & structural revisions. compliance with ordinance #155-13 not requiredDetails
revision to appl #2013.1210.3827 - removal of proposed windows in north exterior wall & structural revisions. compliance with ordinance #155-13 not required | ||
| Mar 18, 2014 | Completed final sign-off Sep 2014 | 281 Ellis St | Fox Brothers Construction Inc | new storefroint and entry and mep. refer to pa#201312124064Details
new storefroint and entry and mep. refer to pa#201312124064 | $85,000 |
| Feb 10, 2014 | Expired or cancelled cancelled Jan 2026 | 558 Castro St | legalization of (e) rear patio area, outdoor seating at (e) patio, new stair with minor deck repairs.Details
legalization of (e) rear patio area, outdoor seating at (e) patio, new stair with minor deck repairs. | $8,500 | |
| Dec 12, 2013 | Completed final sign-off Sep 2014 | 281 Ellis St | Fox Brothers Construction Inc | tenant improvements, no structural partitions, ada restrooms.Details
tenant improvements, no structural partitions, ada restrooms. | $98,000 |
| Dec 10, 2013 | Completed final sign-off Jun 2014 | 1695 Polk St | new ada restrooms, mezzanine partial removal, new ada ramp, new windows, facade alterations to plans dated 12/06/13. all work at ground level. revised occupant load 103Details
new ada restrooms, mezzanine partial removal, new ada ramp, new windows, facade alterations to plans dated 12/06/13. all work at ground level. revised occupant load 103 | $98,000 | |
| Oct 15, 2013 | Never finaled issued Nov 2013, no final | 2349 Market St | Hcg Associates Inc | install new infill wall located 75" from front door to reduce depth of space. smaller space will temporarily remove sprinkler requirement for tco unti water meter can be installed and sprinklers activated. ti under 201303142233Details
install new infill wall located 75" from front door to reduce depth of space. smaller space will temporarily remove sprinkler requirement for tco unti water meter can be installed and sprinklers activated. ti under 201303142233 | $800 |
| Aug 19, 2013 | Expired or cancelled withdrawn Aug 2013 | 2349 Market St | Hcg Associates Inc | interior demo permit to remove non-structural casework & debris on advance of t.i under separate permit. all other work under sep pa.Details
interior demo permit to remove non-structural casework & debris on advance of t.i under separate permit. all other work under sep pa. | $1,000 |
| Jul 17, 2013 | Expired or cancelled withdrawn Mar 2015 | 835 Larkin St | new retail tenant improvement - ada bathroom upgrade, addition of coffee service, new finishes.Details
new retail tenant improvement - ada bathroom upgrade, addition of coffee service, new finishes. | $50,000 | |
| Jun 5, 2013 | Never finaled issued Jun 2013, no final | 309 Cortland Av | relocation of restrooms, storage, new lighting, new windows change to storefront to conform to adaDetails
relocation of restrooms, storage, new lighting, new windows change to storefront to conform to ada | $50,000 | |
| Jun 5, 2013 | Completed final sign-off Dec 2013 | 360 Ritch St | Huff Construction Company Inc | relocation of bar, new lighting & finishes.Details
relocation of bar, new lighting & finishes. | $88,000 |
| May 30, 2013 | Completed final sign-off Feb 2014 | 348 Columbus Av | revision to appl #2013.05.01.5887- removal of mezzanine, relocated wood oven, reconfigured restroom.Details
revision to appl #2013.05.01.5887- removal of mezzanine, relocated wood oven, reconfigured restroom. | $500 | |
| May 21, 2013 | Completed final sign-off Nov 2013 | 684 King St | Teutonic Construction Inc | revision to app#201304295648. relocate restroom for access to customers. fire alarm and sprinklesr separte permitDetails
revision to app#201304295648. relocate restroom for access to customers. fire alarm and sprinklesr separte permit | $5,000 |
| Apr 29, 2013 | Never finaled issued May 2013, no final | 684 King St | Teutonic Construction Inc | interior t.i to an (e) retail/cafe space. new work includes installation of new partitions, equipment, fixtures and furnishings, electrical and plumbing work.Details
interior t.i to an (e) retail/cafe space. new work includes installation of new partitions, equipment, fixtures and furnishings, electrical and plumbing work. | $100,000 |
| Mar 14, 2013 | Completed final sign-off Apr 2014 | 2349 Market St | Hcg Associates Inc | change of use. from (e) retail store to (n) cafe. work will incl remodel for a cafe. fire sprinklers & mechanical under separate p.a.Details
change of use. from (e) retail store to (n) cafe. work will incl remodel for a cafe. fire sprinklers & mechanical under separate p.a. | |
| Jun 22, 2012 | Completed final sign-off Nov 2012 | 690 Van Ness Av | Teutonic Construction Inc | interior tenant improvement to finish fire repair under 201109164816. new partitions, equipment, mechanical, plumbing and electric work.Details
interior tenant improvement to finish fire repair under 201109164816. new partitions, equipment, mechanical, plumbing and electric work. | $180,000 |
| Dec 20, 2011 | Completed final sign-off Jan 2012 | 1131 Polk St | re-calculation of occupant load per fire inspectorDetails
re-calculation of occupant load per fire inspector | ||
| Nov 1, 2011 | Completed final sign-off Apr 2012 | 550 Valencia St | Greentree Design/Build | change of use from retail to full service restaurant use approved under appl.#201106097763. build-out of interior restaurant. mep under separate permit.Details
change of use from retail to full service restaurant use approved under appl.#201106097763. build-out of interior restaurant. mep under separate permit. | $60,000 |
| Jun 9, 2011 | Completed final sign-off Apr 2012 | 550 Valencia St | Greentree Design/Build | building shell renovation, seismic upgrade, ada restrooms sprinklers, store front replacement, removal of atms from storefront.Details
building shell renovation, seismic upgrade, ada restrooms sprinklers, store front replacement, removal of atms from storefront. | $60,000 |
| May 25, 2011 | Expired or cancelled cancelled Jan 2026 | 548 Valencia St | seismic upgrade, fire protection, ada upgradeDetails
seismic upgrade, fire protection, ada upgrade | $128,411 | |
| Jun 11, 2010 | Never finaled issued Jun 2010, no final | 2727 Mariposa St | Cas Construction | unit #103 revision to pa# 2009-0429-7324-per highlighted areas: new partition head detail, deleted wall to changing area & reversed door swing to bathroom shown as delta '1'Details
unit #103 revision to pa# 2009-0429-7324-per highlighted areas: new partition head detail, deleted wall to changing area & reversed door swing to bathroom shown as delta '1' | $10,000 |
| Oct 16, 2009 | Completed final sign-off Apr 2010 | 555 Florida St | to obtain final inspection for work approved under 9913575. all work is complete.Details
to obtain final inspection for work approved under 9913575. all work is complete. | ||
| Oct 16, 2009 | Never finaled issued Oct 2009, no final | 555 Florida St | to obtain final inspection for work approved under 9900926. all work is complete.Details
to obtain final inspection for work approved under 9900926. all work is complete. | ||
| Oct 16, 2009 | Never finaled issued Oct 2009, no final | 555 Florida St | to obtain final inspection for work approved under 9702706. all work is complete.Details
to obtain final inspection for work approved under 9702706. all work is complete. | ||
| Oct 16, 2009 | Never finaled issued Oct 2009, no final | 555 Florida St | to obtain final inspection for work approved under 9712790. all work is complete.Details
to obtain final inspection for work approved under 9712790. all work is complete. | ||
| Aug 6, 2009 | Completed final sign-off Jun 2010 | 555 Pacific Av | West Builders Inc. | renovation of existing 2nd. floor office space including removal of existing demishing walls and addition of accessible bathrooms. exterior work is limited to replacement of existing skylight. reference application #2006/0118/5390 for shearwalls and lateral upgrades.Details
renovation of existing 2nd. floor office space including removal of existing demishing walls and addition of accessible bathrooms. exterior work is limited to replacement of existing skylight. reference application #2006/0118/5390 for shearwalls and lateral upgrades. | $145,000 |
| Jun 8, 2009 | Completed final sign-off Aug 2009 | 886 30th Av | remodel downstairs. add 1 full bathroom, 1 game room and replace window for french door. all worj on garage floorDetails
remodel downstairs. add 1 full bathroom, 1 game room and replace window for french door. all worj on garage floor | $15,000 | |
| Apr 29, 2009 | Expired or cancelled expired Jul 2010 | 2727 Mariposa St | Cas Construction | t.i. for new pilates studio on ground floor. work includes minor demo new partitions, doors, finishes, carpet. minor bathroom upgrade. no exterior work lighting and mechanical to remain unchanged. fire protection under seperate permit.Details
t.i. for new pilates studio on ground floor. work includes minor demo new partitions, doors, finishes, carpet. minor bathroom upgrade. no exterior work lighting and mechanical to remain unchanged. fire protection under seperate permit. | $20,000 |
| Mar 9, 2007 | Completed final sign-off Dec 2007 | 1576 Sanchez St | Ryan C Hu | 2nd & 3rd floor kitchens and bathrooms to be renovated. add a new bathroom to each of the 2 floor levels. a non code compliant stair will be replaced with a comforming one connecting the 3rd level with the attic.Details
2nd & 3rd floor kitchens and bathrooms to be renovated. add a new bathroom to each of the 2 floor levels. a non code compliant stair will be replaced with a comforming one connecting the 3rd level with the attic. | $200,000 |
| Mar 1, 2007 | Expired or cancelled expired Jul 2010 | 2727 Mariposa St | renew pa#200006193044,#200210310497,#200212052889.Details
renew pa#200006193044,#200210310497,#200212052889. | ||
| Aug 27, 2004 | Completed final sign-off Mar 2005 | 3401 California St | non structural demo in advance of t.i for (n) restaurant. demo includes removal of 3 windows on laurDetails
non structural demo in advance of t.i for (n) restaurant. demo includes removal of 3 windows on laur | $4,500 |