Matt Nichols
- Listed as
- authorized agent-others, contractor
- Firm
- Deep Elm Construction Llc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2016 to Sep 2026
83 permits since 2000 (contractor on 83 permits, authorized agent-others on 6 permits): 49 completed, 14 in progress, 11 never finaled, 9 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 23, 2026 | In progress issued Sep 2026 | 501 Holly Park Cr | Deep Elm Construction Llc | administrative permit - change of address; update address for application no. 202608257126; change 297-299 richland ave to 501 holly park circle.Details
administrative permit - change of address; update address for application no. 202608257126; change 297-299 richland ave to 501 holly park circle. | |
| Sep 1, 2026 | Completed final sign-off Sep 2026 | 506 Divisadero St | Deep Elm Construction Llc | recommencement and completion of work approved under 200003013233 and 200202199463Details
recommencement and completion of work approved under 200003013233 and 200202199463 | $2,000 |
| Aug 25, 2026 | In progress issued Aug 2026 | 297 Richland Av | Deep Elm Construction Llc | rear building remodel, (1) kitchen and (2) bathrooms in kind. exploratory demolition approx 10'x20' to repair dry rot and water damage, patch in-kind. replace (6) windows in existing historic details. update plumbing and electrical as needed.Details
rear building remodel, (1) kitchen and (2) bathrooms in kind. exploratory demolition approx 10'x20' to repair dry rot and water damage, patch in-kind. replace (6) windows in existing historic details. update plumbing and electrical as needed. | $20,000 |
| Aug 24, 2026 | In progress issued Aug 2026 | 297 Richland Av | Deep Elm Construction Llc | replace 1 kitchen and 1 bathroom in kind. exploratory demo approx 15'x20' for dry rot and water damage repairs. replace 8 windows in kind with wood sash windows to match existing historic detail. add 3 new skulights approx 24"x48" each, 5 feet from property line. update plumb. & elec as needed.Details
replace 1 kitchen and 1 bathroom in kind. exploratory demo approx 15'x20' for dry rot and water damage repairs. replace 8 windows in kind with wood sash windows to match existing historic detail. add 3 new skulights approx 24"x48" each, 5 feet from property line. update plumb. & elec as needed. | $30,000 |
| Aug 24, 2026 | In progress issued Aug 2026 | 299 Richland Av | Deep Elm Construction Llc | comply with nov complaint #202650892. repair weather proofing & paint at existing siding. repair existing stairs. dry rot repari less then 50 %. repair windows at unit 299 richland ave.exploratory demo. approx. 8'x8' in 299 to determinate source of water intrusion.Details
comply with nov complaint #202650892. repair weather proofing & paint at existing siding. repair existing stairs. dry rot repari less then 50 %. repair windows at unit 299 richland ave.exploratory demo. approx. 8'x8' in 299 to determinate source of water intrusion. | $5,000 |
| Aug 10, 2026 | In progress issued Aug 2026 | 942 Clayton St | Deep Elm Construction Llc | bathroom remodel, replace in kind, no fixture move.Details
bathroom remodel, replace in kind, no fixture move. | $20,000 |
| Aug 6, 2026 | In progress filed Aug 2026, not yet issued | 1526 Broderick St | Deep Elm Construction Llc | excavate ground floor to create new adu.Details
excavate ground floor to create new adu. | $75,000 |
| Jun 26, 2026 | In progress filed Jun 2026, not yet issued | 3819 17th St | Deep Elm Construction Llc | bathroom remodel. approximately 24sf. replace 3 windows in kind at lightwell. windows not visible from street. no slab replacement, no exploratory excavation. 6/26/26 azDetails
bathroom remodel. approximately 24sf. replace 3 windows in kind at lightwell. windows not visible from street. no slab replacement, no exploratory excavation. 6/26/26 az | $25,000 |
| Jun 15, 2026 | Completed final sign-off Jul 2026 | 991 Oak St | Deep Elm Construction Llc | deferred submittal mep reference 202601023180.Details
deferred submittal mep reference 202601023180. | |
| Jun 3, 2026 | In progress issued Jun 2026 | 3819 17th St | Deep Elm Construction Llc | ground floor unit - replace kitchen in kind, upgrade electrical and plumbing as needed. dry rot repair at ground floor rear wall of building.Details
ground floor unit - replace kitchen in kind, upgrade electrical and plumbing as needed. dry rot repair at ground floor rear wall of building. | $25,000 |
| Jun 3, 2026 | Completed final sign-off Jul 2026 | 245 Webster St | Deep Elm Construction Llc | bathroom remodel, replace in kind. add shower in (e) bathroom, no change to walls.Details
bathroom remodel, replace in kind. add shower in (e) bathroom, no change to walls. | $15,000 |
| Apr 10, 2026 | Completed final sign-off Jun 2026 | 1266 York St | Deep Elm Construction Llc | revision to bpa#202601063271, omit new retaining wall at front of property, omit the addition of trash enclosure at front.Details
revision to bpa#202601063271, omit new retaining wall at front of property, omit the addition of trash enclosure at front. | |
| Mar 30, 2026 | Completed final sign-off Apr 2026 | 4754 17th St | Deep Elm Construction Llc | to obtain final inspection for work approved under pa# 202011189203. all work is approved.Details
to obtain final inspection for work approved under pa# 202011189203. all work is approved. | |
| Mar 18, 2026 | In progress issued Mar 2026 | 172 Arguello Bl | Deep Elm Construction Llc | bathroom remodel in kind. no wall removal.Details
bathroom remodel in kind. no wall removal. | $50,000 |
| Mar 9, 2026 | Completed final sign-off Aug 2026 | 3824 21st St | Deep Elm Construction Llc | revision to pa# 202312192726: removal of dumbwaiter. skylight product change. back window type change, upper back window slight size change. removal of 2nd fl hvac & replacement w/ whole house on demand boiler on 2nd fl. deck shape change, interior loft railing change from glass to cable.Details
revision to pa# 202312192726: removal of dumbwaiter. skylight product change. back window type change, upper back window slight size change. removal of 2nd fl hvac & replacement w/ whole house on demand boiler on 2nd fl. deck shape change, interior loft railing change from glass to cable. | |
| Jan 6, 2026 | Completed final sign-off Jun 2026 | 1266 York St | Deep Elm Construction Llc | revision to pa #2025-0429-5472 & 2025-0819-3359. replace retaining wall at front of the property. add new trash enclosure and mailbox. unit 1266: add new closets, relocate (e) bedroom to front of the property. omit (n) grade beam at rear.Details
revision to pa #2025-0429-5472 & 2025-0819-3359. replace retaining wall at front of the property. add new trash enclosure and mailbox. unit 1266: add new closets, relocate (e) bedroom to front of the property. omit (n) grade beam at rear. | $5,000 |
| Jan 2, 2026 | Completed final sign-off Jul 2026 | 991 Oak St | Deep Elm Construction Llc | change of use from laundry mat to limited restaurant (cafe). casework at service/sales area. covebase at service area. washable paint at ceiling over service area. minor work at existing at gender neutral restroom. no exterior or structural work. mep under separate permit.Details
change of use from laundry mat to limited restaurant (cafe). casework at service/sales area. covebase at service area. washable paint at ceiling over service area. minor work at existing at gender neutral restroom. no exterior or structural work. mep under separate permit. | $35,000 |
| Dec 16, 2025 | In progress issued Apr 2026 | 1348 Vermont St | Deep Elm Construction Llc | kithcen remodel incorporating (e) enclosed habitable space at rear porch . remove and replace framing for roof.Details
kithcen remodel incorporating (e) enclosed habitable space at rear porch . remove and replace framing for roof. | $100,000 |
| Dec 16, 2025 | Completed final sign-off Mar 2026 | 480 Sanchez St | Deep Elm Construction Llc | remodel of two full bathroom. no fixture moved.Details
remodel of two full bathroom. no fixture moved. | $40,000 |
| Sep 11, 2025 | In progress issued Sep 2025 | 640 Gennessee St | Deep Elm Construction Llc | interior remodel to upstairs kitchen 7 sunroom, changing layout & partially remove a wall, replace windows at rear in-kind, re-face fireplace, replace upstairs living room & hallway flooring to match (e) bedrooms, smooth walls.Details
interior remodel to upstairs kitchen 7 sunroom, changing layout & partially remove a wall, replace windows at rear in-kind, re-face fireplace, replace upstairs living room & hallway flooring to match (e) bedrooms, smooth walls. | $150,000 |
| Sep 8, 2025 | Completed final sign-off Nov 2025 | 506 Divisadero St | Deep Elm Construction Llc | unit 506 and 510: revision to bpa 202405283118, remodel 1 kitchen and 1 bath in unit 506, remodel 1 kitchen and 1 bath in unit 510.Details
unit 506 and 510: revision to bpa 202405283118, remodel 1 kitchen and 1 bath in unit 506, remodel 1 kitchen and 1 bath in unit 510. | |
| Aug 19, 2025 | Completed final sign-off Apr 2026 | 1266 York St | Deep Elm Construction Llc | add new roof deck & fire rated parapet/guard rail at 2nd floor side lightwell.Details
add new roof deck & fire rated parapet/guard rail at 2nd floor side lightwell. | $10,000 |
| Aug 12, 2025 | Expired or cancelled withdrawn Mar 2026 | 3824 21st St | Deep Elm Construction Llc | revision to 201203196276 s1; include - removal of full house dumbwaiter and shaft, removal of hvac from the 2nd flr, 2nd replaced by radiant in walls, removal of house water heater and replaced by whole house on demand boiler on 2nd flr, skylight model changes, back window change.Details
revision to 201203196276 s1; include - removal of full house dumbwaiter and shaft, removal of hvac from the 2nd flr, 2nd replaced by radiant in walls, removal of house water heater and replaced by whole house on demand boiler on 2nd flr, skylight model changes, back window change. | $100 |
| Aug 11, 2025 | Completed final sign-off Jan 2026 | 190 Noe St | Deep Elm Construction Llc, Daaron Builders | bathroom remodel, new tub, sink vanity, floor and wall tiles.Details
bathroom remodel, new tub, sink vanity, floor and wall tiles. | $30,000 |
| Apr 29, 2025 | Completed final sign-off Apr 2026 | 1266 York St | Deep Elm Construction Llc | comply/w nov 202429997. remodel 3 (e) apartments: remodel 3 kitchens, 3 bathrooms, add new laundry in each unit. add n) heating equipment to each unit.new framing & finishes to create n) bedroom & bathroom. repair/replace missing/damaged interior finishes. demo unpermitted deck & replace w/ (n) deckDetails
comply/w nov 202429997. remodel 3 (e) apartments: remodel 3 kitchens, 3 bathrooms, add new laundry in each unit. add n) heating equipment to each unit.new framing & finishes to create n) bedroom & bathroom. repair/replace missing/damaged interior finishes. demo unpermitted deck & replace w/ (n) deck | $170,000 |
| Nov 15, 2024 | In progress issued Nov 2024 | 1400 La Playa | Deep Elm Construction Llc | unit 9: remodel 1 bathroom & 1 kitchen in kind.Details
unit 9: remodel 1 bathroom & 1 kitchen in kind. | $50,000 |
| Nov 15, 2024 | Completed final sign-off May 2025 | 1871 Bush St | Deep Elm Construction Llc | unit #1871: remodel 1 bathroom in kind. unit 1873: remodel 1 bathroom in kind, remodel 1 kitchen in kind. unit #1871 & 1873: remodel laundry room in kind both units.Details
unit #1871: remodel 1 bathroom in kind. unit 1873: remodel 1 bathroom in kind, remodel 1 kitchen in kind. unit #1871 & 1873: remodel laundry room in kind both units. | $90,000 |
| Oct 2, 2024 | Completed final sign-off Mar 2026 | 3824 21st St | Deep Elm Construction Llc | remodel 1 bathroom in kind.Details
remodel 1 bathroom in kind. | $20,000 |
| Jul 22, 2024 | In progress filed Jul 2024, not yet issued | 506 Divisadero St | Deep Elm Construction Llc | unit 506: remodel 1 kitchen & 2 bathrooms in kind. unit 510 remodel 1 kitchen & 2 bathrooms in kind. upgrade gas lines & water supply lines throughout as needed.Details
unit 506: remodel 1 kitchen & 2 bathrooms in kind. unit 510 remodel 1 kitchen & 2 bathrooms in kind. upgrade gas lines & water supply lines throughout as needed. | $100,000 |
| May 28, 2024 | Completed final sign-off Nov 2025 | 506 Divisadero St | Deep Elm Construction Llc | unit 506 and unint 510: remodle 2 kitchens 4 baths in kindDetails
unit 506 and unint 510: remodle 2 kitchens 4 baths in kind | $100,000 |
| Apr 12, 2024 | Completed final sign-off Aug 2024 | 2504 Leavenworth St | Deep Elm Construction Llc | dryrot repair at rear deck. replace cedar shingles as neededd. patch roof as needed. replace e) 2x 6 decking material in kind less than 50%Details
dryrot repair at rear deck. replace cedar shingles as neededd. patch roof as needed. replace e) 2x 6 decking material in kind less than 50% | $10,000 |
| Mar 27, 2024 | Completed final sign-off Nov 2024 | 715 Ashbury St | Deep Elm Construction Llc | revision to 202302101835: revision to size of new elevated rear yard deck, stair and firewall. deck elevation less than 10ft from grade. no work visible from street.Details
revision to 202302101835: revision to size of new elevated rear yard deck, stair and firewall. deck elevation less than 10ft from grade. no work visible from street. | $10,000 |
| Mar 15, 2024 | Completed final sign-off Feb 2025 | 168 16th Av | Deep Elm Construction Llc | interior remodel and structural upgrade. general interior remodel including kitchen and bath. remove/replace doors and windows to deck at 2/f, rear yard (not visible from prow)Details
interior remodel and structural upgrade. general interior remodel including kitchen and bath. remove/replace doors and windows to deck at 2/f, rear yard (not visible from prow) | $30,000 |
| Feb 14, 2024 | In progress filed Feb 2024, not yet issued | 1847 Mcallister St | Deep Elm Construction Llc | to obtain final inspection for work approved under pa# 201806202391 & 201806202401 all work is completeDetails
to obtain final inspection for work approved under pa# 201806202391 & 201806202401 all work is complete | |
| Jan 12, 2024 | Completed final sign-off Jul 2024 | 1998 Vallejo St | Deep Elm Construction Llc | revision to permit# 202310199066: for same work but to provide plans. (kitchen and bath remodel, electrical upgrades)Details
revision to permit# 202310199066: for same work but to provide plans. (kitchen and bath remodel, electrical upgrades) | $1,000 |
| Jan 11, 2024 | Completed final sign-off Dec 2024 | 1348 Vermont St | Deep Elm Construction Llc | remodel 1 bathrooms, in-kind. no fixtures changes. change new fan, lighting. replace sink in toilet room.Details
remodel 1 bathrooms, in-kind. no fixtures changes. change new fan, lighting. replace sink in toilet room. | $20,000 |
| Jan 11, 2024 | Completed final sign-off Jul 2024 | 1998 Vallejo St | Deep Elm Construction Llc | apt 9: remodel 2 bathrooms, in-kind.Details
apt 9: remodel 2 bathrooms, in-kind. | $80,000 |
| Dec 19, 2023 | Completed final sign-off Aug 2026 | 3824 21st St | Deep Elm Construction Llc | renovation of (e) sfh includes reconfiguration of upper level, adding windows to rear exterior of bldg, and addition of a rear upper level deck to rear of home.Details
renovation of (e) sfh includes reconfiguration of upper level, adding windows to rear exterior of bldg, and addition of a rear upper level deck to rear of home. | $200,000 |
| Oct 19, 2023 | Completed final sign-off Jul 2024 | 1998 Vallejo St | Deep Elm Construction Llc | remodel kitchen in kind, remodel 3 bathrooms in kind. replace all radiators in kind. upgrade electrical throughoutDetails
remodel kitchen in kind, remodel 3 bathrooms in kind. replace all radiators in kind. upgrade electrical throughout | $40,000 |
| Aug 14, 2023 | Completed final sign-off Jan 2024 | 624 Fillmore St | Deep Elm Construction Llc | unit 3: revision to permit 202211216941. unforeseen field condition required modification to roof framing. add plywood sheathing to property line wallDetails
unit 3: revision to permit 202211216941. unforeseen field condition required modification to roof framing. add plywood sheathing to property line wall | |
| Jul 24, 2023 | Completed final sign-off Mar 2026 | 715 Ashbury St | Deep Elm Construction Llc | temp building & sequenced excavation plan to accommodate foundation installation.Details
temp building & sequenced excavation plan to accommodate foundation installation. | $10,000 |
| Jun 30, 2023 | Completed final sign-off Nov 2024 | 715 Ashbury St | Deep Elm Construction Llc | revision to bpa#202302101835, relocate proposed new 3/f bathroom to new location on 3/f. convert one bedroom into office (on 3rd flr).Details
revision to bpa#202302101835, relocate proposed new 3/f bathroom to new location on 3/f. convert one bedroom into office (on 3rd flr). | |
| Apr 20, 2023 | Completed final sign-off Dec 2023 | 1386 Thomas Av | Deep Elm Construction Llc | insulate and sheetrock ground floor approx 1600 sq ft. replace (3) alum windows w/ wood to match (e) wood windows - street facing.Details
insulate and sheetrock ground floor approx 1600 sq ft. replace (3) alum windows w/ wood to match (e) wood windows - street facing. | $8,000 |
| Feb 17, 2023 | Expired or cancelled cancelled Jan 2026 | 59 Cumberland St | Deep Elm Construction Llc | alter (e) deck in rear yardDetails
alter (e) deck in rear yard | $21,000 |
| Feb 10, 2023 | Completed final sign-off Nov 2024 | 715 Ashbury St | Deep Elm Construction Llc | 1/f: in-fill under 2-st0ry cantilever on north side, in-fill under 1-story cantilever on west side, remove e deck & construct n deck & spiral convenience stairs to grade. interior - restore lower unit - change from 562 sf. ground fl apartment to 630 sf; replace brick foundation. 2nd fl remodel ofDetails
1/f: in-fill under 2-st0ry cantilever on north side, in-fill under 1-story cantilever on west side, remove e deck & construct n deck & spiral convenience stairs to grade. interior - restore lower unit - change from 562 sf. ground fl apartment to 630 sf; replace brick foundation. 2nd fl remodel of | $400,000 |
| Jan 10, 2023 | Expired or cancelled withdrawn Feb 2023 | 59 Cumberland St | Deep Elm Construction Llc | revision to permit 202204111963. change replacement stair layout. replace sliding door in (e) opening at 3/f deck. create 3' deep landing at deck at grade. change window openings at interior stair. replace windows in (e) windows at 2/f den. no work visible from street or public row.Details
revision to permit 202204111963. change replacement stair layout. replace sliding door in (e) opening at 3/f deck. create 3' deep landing at deck at grade. change window openings at interior stair. replace windows in (e) windows at 2/f den. no work visible from street or public row. | $9,750 |
| Sep 13, 2022 | Never finaled issued Sep 2022, no final | 1201 California St | Deep Elm Construction Llc | unit #303: bathrom remodel. replace in kind. no opening change. sand floors. replace countertops.Details
unit #303: bathrom remodel. replace in kind. no opening change. sand floors. replace countertops. | $11,000 |
| Apr 22, 2022 | Never finaled issued Apr 2022, no final | 355 Hermann St | Deep Elm Construction Llc | kitchen remodel - generate plans for otc permit pa# 202203280972. to reflect structural changes. new kitchen skylight. opening some exist. walls and add kitchen islandDetails
kitchen remodel - generate plans for otc permit pa# 202203280972. to reflect structural changes. new kitchen skylight. opening some exist. walls and add kitchen island | |
| Apr 11, 2022 | Never finaled issued Aug 2022, no final | 59 Cumberland St | Deep Elm Construction Llc, Macken Construction | no change to (change) facade. interior work only 2nd and 3rd fl. reconfigure (e) bedroom and kitchen configuration.Details
no change to (change) facade. interior work only 2nd and 3rd fl. reconfigure (e) bedroom and kitchen configuration. | $160,000 |
| Mar 28, 2022 | Never finaled issued Mar 2022, no final | 355 Hermann St | Deep Elm Construction Llc | kitchen remodel in kind. replace new cabinets, (e) skylight at kitchen, new lighting. no removal of wallsDetails
kitchen remodel in kind. replace new cabinets, (e) skylight at kitchen, new lighting. no removal of walls | $30,000 |
| Dec 7, 2021 | Never finaled issued Dec 2021, no final | 1400 La Playa | Deep Elm Construction Llc | unit #2: remodel kitchen & bathroom in kind.Details
unit #2: remodel kitchen & bathroom in kind. | $20,000 |
| Sep 29, 2021 | Expired or cancelled cancelled Jan 2026 | 1386 Thomas Av | Deep Elm Construction Llc | provide a boiler system for hydronic heatingDetails
provide a boiler system for hydronic heating | $2,000 |
| Sep 17, 2021 | Completed final sign-off Jan 2024 | 1552 Fulton St | Deep Elm Construction Llc | at the existing front building on the lot, per california government code 65852.2, add a new a.d.u. in existing garage and storage space at ground floor.Details
at the existing front building on the lot, per california government code 65852.2, add a new a.d.u. in existing garage and storage space at ground floor. | $100,000 |
| Aug 19, 2021 | Completed final sign-off Dec 2023 | 1554 Fulton St | Deep Elm Construction Llc | foundation replacement and excavate to increase ceiling height; estimated excavation 222 cubic yards. 2nd floor remodel, 3rd floor remodel. new hydronic heating. repair rear stair (lower portion); second means of egress. rogelio.baeza@sfgov.orgDetails
foundation replacement and excavate to increase ceiling height; estimated excavation 222 cubic yards. 2nd floor remodel, 3rd floor remodel. new hydronic heating. repair rear stair (lower portion); second means of egress. rogelio.baeza@sfgov.org | $145,000 |
| Jul 20, 2021 | Never finaled issued Jul 2021, no final | 1552 Fulton St | Deep Elm Construction Llc | remodel 2 kitchens and 4 baths in kindDetails
remodel 2 kitchens and 4 baths in kind | $102,700 |
| Jul 19, 2021 | Completed final sign-off Jan 2022 | 4754 17th St | Deep Elm Construction Llc | install hydo heat in floor on ground floor. approx. 300 sq ft/clean up mold remediation. connect to existing boiler.Details
install hydo heat in floor on ground floor. approx. 300 sq ft/clean up mold remediation. connect to existing boiler. | $2,500 |
| May 18, 2021 | Completed final sign-off Dec 2023 | 1180 Fulton St | Deep Elm Construction Llc, Kitchen King Inc | replace one window about sink, not facing public. one in kind kitchen & 2 bath update: materials & appliances update in kind non structural.Details
replace one window about sink, not facing public. one in kind kitchen & 2 bath update: materials & appliances update in kind non structural. | $150,000 |
| Apr 15, 2021 | Never finaled issued Apr 2021, no final | 327 Divisadero St | Deep Elm Construction Llc | exploratry demo for removal of sheetrock. approx 400sq ft in different areas. patch & repair in kind after exploratory demo.Details
exploratry demo for removal of sheetrock. approx 400sq ft in different areas. patch & repair in kind after exploratory demo. | $2,500 |
| Mar 12, 2021 | Completed final sign-off Jun 2021 | 204 03rd Av | Deep Elm Construction Llc, John O'donovan | to comply with physical inspection report # cc-8442.Details
to comply with physical inspection report # cc-8442. | $20,000 |
| Jan 8, 2021 | Expired or cancelled expired Jan 2024 | 148 29th St | Deep Elm Construction Llc | remodel in kind of 1 bathroom remodel and main electrcial panel upgrade. no cnage to wall & opening, layout (maintain 1 hr separation between units at area of work).Details
remodel in kind of 1 bathroom remodel and main electrcial panel upgrade. no cnage to wall & opening, layout (maintain 1 hr separation between units at area of work). | $30,000 |
| Nov 18, 2020 | Expired or cancelled expired Apr 2026 | 4754 17th St | Deep Elm Construction Llc | interior kitchen and pantry remodel at 2nd floor. install new windows at 3rd floor. sprinkler under sep permit.Details
interior kitchen and pantry remodel at 2nd floor. install new windows at 3rd floor. sprinkler under sep permit. | $100,000 |
| Nov 18, 2020 | Completed final sign-off Sep 2024 | 943 Ashbury St | Deep Elm Construction Llc | vertical addition at rear/side of house to add a residentail elevator serving all (4) stories. relocate existing egress ladder to opposite rear corner of house, create outdoor access balconyDetails
vertical addition at rear/side of house to add a residentail elevator serving all (4) stories. relocate existing egress ladder to opposite rear corner of house, create outdoor access balcony | $35,000 |
| Nov 10, 2020 | Never finaled issued Mar 2021, no final | 2381 Bush St | Deep Elm Construction Llc | excavate & replace 1st fl brick foundation. partial excavation of rear yard to 1st fl. add new bathroom on 1st fl. add new stair from 1st to 2nd fl. partial removal of rear deck and reconfigure stair access to rear yard. legalize 698 habitable sq ft.Details
excavate & replace 1st fl brick foundation. partial excavation of rear yard to 1st fl. add new bathroom on 1st fl. add new stair from 1st to 2nd fl. partial removal of rear deck and reconfigure stair access to rear yard. legalize 698 habitable sq ft. | $78,000 |
| Oct 22, 2020 | Completed final sign-off Jan 2021 | 114 Clarendon Av | Deep Elm Construction Llc | cosmetic bathroom remodel. change mediciene cabinet, and tiles. no structural work.Details
cosmetic bathroom remodel. change mediciene cabinet, and tiles. no structural work. | $10,000 |
| Oct 19, 2020 | Completed final sign-off Jan 2023 | 209 Sanchez St | Deep Elm Construction Llc | recommencement and completion of work under pa #20180808680 & #201509157037: commercial - soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4. pa #201808086805: revision to approved pa #201509157037 to adjust seismic design (delete moment frame)Details
recommencement and completion of work under pa #20180808680 & #201509157037: commercial - soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4. pa #201808086805: revision to approved pa #201509157037 to adjust seismic design (delete moment frame) | $60,000 |
| Aug 11, 2020 | Completed final sign-off Jun 2021 | 209 Sanchez St | Deep Elm Construction Llc | unit# a: remodel kitchen in kind remove/ replace all cabinet, fixtrue, appliances, ligthing and electrical to code. remodel bathoom in kind. remove/replace all cabinets, fixtures, finishes-dryrot repair as needed.Details
unit# a: remodel kitchen in kind remove/ replace all cabinet, fixtrue, appliances, ligthing and electrical to code. remodel bathoom in kind. remove/replace all cabinets, fixtures, finishes-dryrot repair as needed. | $100,000 |
| Feb 28, 2020 | Expired or cancelled cancelled Mar 2020 | 2130 Leavenworth St | Deep Elm Construction Llc | apt 11. plumbing - bath remodel, toilet, sink, shower electrical - rewire bathroom for remodel.Details
apt 11. plumbing - bath remodel, toilet, sink, shower electrical - rewire bathroom for remodel. | $20,000 |
| Jan 10, 2020 | Completed final sign-off Sep 2024 | 942 Clayton St | Deep Elm Construction Llc | kitchen remodel, replace in kind existing kitchen. new counter tops, new cabinets, electrical and plumbing upgrades as needed. all high efficiency lighting. no structral work. no change in walls, openings.Details
kitchen remodel, replace in kind existing kitchen. new counter tops, new cabinets, electrical and plumbing upgrades as needed. all high efficiency lighting. no structral work. no change in walls, openings. | $50,000 |
| Jan 10, 2020 | Completed final sign-off Sep 2020 | 1386 Thomas Av | Deep Elm Construction Llc | replace 26' section of brick foundation with new concrete, 2' deep 1' wide footing #4 rebar, 7" wide stem wall, new 5/8" bolts in sill place 16" oc, new partition walls.Details
replace 26' section of brick foundation with new concrete, 2' deep 1' wide footing #4 rebar, 7" wide stem wall, new 5/8" bolts in sill place 16" oc, new partition walls. | $10,000 |
| Jan 10, 2020 | Completed final sign-off Nov 2021 | 2130 Leavenworth St | Deep Elm Construction Llc | unit #11: bath remodel, replace in kind existing bathroom. new tile, fixtures and vanity. electrical and plumbing upgrade as needed. all high efficency lighting. no structural work. no layout changes. maintain 1 hour separation between units.Details
unit #11: bath remodel, replace in kind existing bathroom. new tile, fixtures and vanity. electrical and plumbing upgrade as needed. all high efficency lighting. no structural work. no layout changes. maintain 1 hour separation between units. | $20,000 |
| Dec 3, 2019 | Completed final sign-off Oct 2021 | 1400 La Playa | Deep Elm Construction Llc | repair wooden stairs on judah side of building - dry rot and rusted metal brackets to comply with nov # 201996521. in kind, not more than 50% replacement.Details
repair wooden stairs on judah side of building - dry rot and rusted metal brackets to comply with nov # 201996521. in kind, not more than 50% replacement. | $5,000 |
| Jun 20, 2018 | Never finaled issued Jun 2018, no final | 1847 Mcallister St | Deep Elm Construction Llc | full foundation replacement w/mat slab. interior stregthening of 3 out of 4 levels. including 3-story moments frame. structural work to conform to req ab094 and design criteria. new partitions in basement, interior remodel at fl 2 and 3. replace 11 win & (1)dr, remodel (2) baths & (1) kitc per flrDetails
full foundation replacement w/mat slab. interior stregthening of 3 out of 4 levels. including 3-story moments frame. structural work to conform to req ab094 and design criteria. new partitions in basement, interior remodel at fl 2 and 3. replace 11 win & (1)dr, remodel (2) baths & (1) kitc per flr | $200,000 |
| Jun 20, 2018 | Never finaled issued Dec 2018, no final | 1847 Mcallister St | Deep Elm Construction Llc | additional dwelling per ord #162-17. add (1) studio dwelling unit @ 1st fl, add (1) bathroom, (1) kitchen. add doors & windows to rear elevation; add half bath in garage. sprinkler under separate permitDetails
additional dwelling per ord #162-17. add (1) studio dwelling unit @ 1st fl, add (1) bathroom, (1) kitchen. add doors & windows to rear elevation; add half bath in garage. sprinkler under separate permit | $75,000 |
| May 10, 2018 | Never finaled issued May 2018, no final | 4118 20th St | Deep Elm Construction Llc | street spaceDetails
street space | |
| Apr 4, 2018 | Completed final sign-off Jun 2018 | 233 Liberty St | Deep Elm Construction Llc | remodel 1 bath new fixtures provide smoke & carbon monoxide hard wired, approx 5 recessed lights in hallway, all luminaries hi effeciency per cec 150.0k approx 70 sq ftDetails
remodel 1 bath new fixtures provide smoke & carbon monoxide hard wired, approx 5 recessed lights in hallway, all luminaries hi effeciency per cec 150.0k approx 70 sq ft | $15,000 |
| Apr 4, 2018 | Expired or cancelled cancelled Jan 2020 | 1851 Mcallister St | Deep Elm Construction Llc | remodel 1 kitchen,(approx 200 sq ft) 1.5 bath ( 100 sq ft & 30 sq ft) add recessed lighting new hyronic heat, all luminaries high effeciency, provide smoke detectors & carbon menoxide hard wired lighitn per cec 150.kDetails
remodel 1 kitchen,(approx 200 sq ft) 1.5 bath ( 100 sq ft & 30 sq ft) add recessed lighting new hyronic heat, all luminaries high effeciency, provide smoke detectors & carbon menoxide hard wired lighitn per cec 150.k | $40,000 |
| Mar 8, 2018 | Completed final sign-off Mar 2018 | 3831 17th St | Deep Elm Construction Llc | to obtain final inspection for work approved under pa# 201611233497. all work is completeDetails
to obtain final inspection for work approved under pa# 201611233497. all work is complete | |
| Jun 5, 2017 | Completed final sign-off Feb 2018 | 3833 17th St | Deep Elm Construction Llc | kitchen and bath remodel. replace inkind. dry rot repair.Details
kitchen and bath remodel. replace inkind. dry rot repair. | $40,000 |
| Jun 22, 2016 | Completed final sign-off Apr 2017 | 152 29th St | Deep Elm Construction Llc | remodel 2 baths and 1 kitchen, upgrade plumbing & electrical as needed. all high efficacy lighting. dryrot repair at westside of bldg, replace approx 100 sq ft siding, not visible from street.Details
remodel 2 baths and 1 kitchen, upgrade plumbing & electrical as needed. all high efficacy lighting. dryrot repair at westside of bldg, replace approx 100 sq ft siding, not visible from street. | $25,000 |
| Apr 14, 2016 | Completed final sign-off Feb 2017 | 2130 Leavenworth St | Deep Elm Construction Llc | unit #11 - kitchen remodel. replace cabinets in kind, upgrade plumbing & electrical as needed. provide smoke/carbon mox . all high efficacy lighting. no structural work, same config.Details
unit #11 - kitchen remodel. replace cabinets in kind, upgrade plumbing & electrical as needed. provide smoke/carbon mox . all high efficacy lighting. no structural work, same config. | $25,000 |
| Apr 14, 2016 | Expired or cancelled expired Sep 2018 | 56 Yukon St | Deep Elm Construction Llc | dryrot repair at north of bldg. replace approx 100 sq ft of siding. not visible to street.Details
dryrot repair at north of bldg. replace approx 100 sq ft of siding. not visible to street. | $3,000 |
| Jan 25, 2016 | Completed final sign-off Aug 2018 | 36 Whitney St | Deep Elm Construction Llc | exterior: at rear, add dormer in (e) roof, enlarge bathroom. deck: at rear, add w.p. roof deck & open railing @ roof. stair (interior): add new stair to garage @ front living level.Details
exterior: at rear, add dormer in (e) roof, enlarge bathroom. deck: at rear, add w.p. roof deck & open railing @ roof. stair (interior): add new stair to garage @ front living level. | $17,000 |
| Jan 11, 2016 | Completed final sign-off Dec 2016 | 3729 17th St | Deep Elm Construction Llc | remodel (e) half bath in middle level unit, no change in wall & openings. replace toilet & vanity in kind. upgrade plumbing and electrical as needed by bldg codes. provide smoke/carbon monoxide and lighting in hallway. all high efficacy lighting.Details
remodel (e) half bath in middle level unit, no change in wall & openings. replace toilet & vanity in kind. upgrade plumbing and electrical as needed by bldg codes. provide smoke/carbon monoxide and lighting in hallway. all high efficacy lighting. | $15,000 |