36 permits since 2000 (engineer on 33 permits, architect on 3 permits): 17 completed, 18 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 18, 2026 | In progress filed Sep 2026, not yet issued | 65 Joost Av | Almega Building | no work in existing building . add/construct 2 level deck for multi-resident home. add 2 entry doors, at (e) previously permitted headers and framing centered in interior hallway.Details
no work in existing building . add/construct 2 level deck for multi-resident home. add 2 entry doors, at (e) previously permitted headers and framing centered in interior hallway. | $35,000 |
| Aug 25, 2026 | In progress filed Aug 2026, not yet issued | 734 Elizabeth St | full interior remodel for entre house per plan. new garage at front yard with roll-up door and new driveway. rear horizontal addition at 2/f and 3/f.Details
full interior remodel for entre house per plan. new garage at front yard with roll-up door and new driveway. rear horizontal addition at 2/f and 3/f. | $350,000 | |
| Jun 24, 2026 | In progress issued Jul 2026 | 1874 09th Av | G&C Construction Services Inc. | replace front windows(9) same in kind. (2) 42 x 60, (2) 36x60, (1) 47 x 40, (2) 18 x 40, (2) 36 x 60. upgrade electrical panel 100amps to 2000. front repair stucco 60 sq ft. install/replace heat pump. correct nov#202653671Details
replace front windows(9) same in kind. (2) 42 x 60, (2) 36x60, (1) 47 x 40, (2) 18 x 40, (2) 36 x 60. upgrade electrical panel 100amps to 2000. front repair stucco 60 sq ft. install/replace heat pump. correct nov#202653671 | $50,000 |
| Apr 22, 2026 | In progress issued May 2026 | 1256 Stanyan St | re surface portal stucco and steps and planter in front of house raised height. traditional step and flooring material should be use on front stair and entry, such as wood/redbrick/concrete/terrazo. (per michelle langlie and jeff speirs, jeffrey.speirs@sfgov.org)Details
re surface portal stucco and steps and planter in front of house raised height. traditional step and flooring material should be use on front stair and entry, such as wood/redbrick/concrete/terrazo. (per michelle langlie and jeff speirs, jeffrey.speirs@sfgov.org) | $18,000 | |
| Dec 3, 2025 | In progress issued May 2026 | 280 Monterey Bl | Dreamprint Home Remodeling Inc | load bearing wall removal between two bedroom on ground fl. remove (e) door at bedroom one.Details
load bearing wall removal between two bedroom on ground fl. remove (e) door at bedroom one. | $5,980 |
| Nov 24, 2025 | Completed final sign-off Mar 2026 | 354 Douglass St | G&C Construction Services Inc. | revision to permit 202212148284. re-bar garage floor, #4. retrofit existing foundation. 2500 psi cement.Details
revision to permit 202212148284. re-bar garage floor, #4. retrofit existing foundation. 2500 psi cement. | $25,000 |
| Sep 18, 2025 | Completed final sign-off Jan 2026 | 955 Grove St | rear bldg - revision to pa 202305177965 & 202305177961 to update drawings to include window on 2nd storyDetails
rear bldg - revision to pa 202305177965 & 202305177961 to update drawings to include window on 2nd story | ||
| Sep 12, 2025 | In progress issued Oct 2025 | 261 Waller St | Amador General Construction Inc | install interior staircase. lower level buildout bathroom, bedroom, laundry room and flex space. add exterior deck upstairs. add new skylights.Details
install interior staircase. lower level buildout bathroom, bedroom, laundry room and flex space. add exterior deck upstairs. add new skylights. | $100,000 |
| Sep 3, 2025 | Completed final sign-off Feb 2026 | 323 Eureka St | Eas Solutions Inc | revision to 202410152932: change to roof hatchDetails
revision to 202410152932: change to roof hatch | |
| Jun 27, 2025 | In progress issued Apr 2026 | 558 Mississippi St | convert existing lower level to adu 545 sqft with a bedroom added to the rear side below deck. adu includes 1-bedroom, 1-bath, a kitchen, a living room and a dining room.Details
convert existing lower level to adu 545 sqft with a bedroom added to the rear side below deck. adu includes 1-bedroom, 1-bath, a kitchen, a living room and a dining room. | $150,000 | |
| Jun 24, 2025 | In progress filed Jun 2025, not yet issued | 2038 Mcallister St | Urban Nest Inc, White Construction Builders Inc | construction of new one (1) detached 1-story, type v-b, adu with 2 bedrooms & 2 bathrooms. pv & f/a under sep permit(s). exist main building is 3-story, 5 units residential r-2 occupancy. adding accessory (1) unit.Details
construction of new one (1) detached 1-story, type v-b, adu with 2 bedrooms & 2 bathrooms. pv & f/a under sep permit(s). exist main building is 3-story, 5 units residential r-2 occupancy. adding accessory (1) unit. | $80,000 |
| Jun 5, 2025 | In progress filed Jun 2025, not yet issued | 853 Rhode Island St | limited to: (n) 4" concrete slab on grade; (n) wood 2nd level with (n) stair to rear yard; (n) 2 panel sliding door and fixed window on rear facade of 2nd levelDetails
limited to: (n) 4" concrete slab on grade; (n) wood 2nd level with (n) stair to rear yard; (n) 2 panel sliding door and fixed window on rear facade of 2nd level | $60,000 | |
| Apr 22, 2025 | Completed final sign-off Aug 2026 | 160 Ulloa St | Mission Home Remodeling Inc | revision to 202408158777; 1) reconfigure detail of three footing. 2) change detail of existing metal beam correction to post in garage header. 3) resizing psl beam bellow kitchen.Details
revision to 202408158777; 1) reconfigure detail of three footing. 2) change detail of existing metal beam correction to post in garage header. 3) resizing psl beam bellow kitchen. | |
| Mar 27, 2025 | In progress issued May 2025 | 332 Douglass St | Kieran Collins Construction | renovation of roughly 940 conditioned sf. remodel of kitchen; 2 full batthrooms, (e) staircase; adding (1) half bath & stair to garage; all new like for like windows; converting (e) living room into a bedroom; work room in garageDetails
renovation of roughly 940 conditioned sf. remodel of kitchen; 2 full batthrooms, (e) staircase; adding (1) half bath & stair to garage; all new like for like windows; converting (e) living room into a bedroom; work room in garage | $520,000 |
| Feb 27, 2025 | In progress issued Feb 2026 | 1449 Hyde St | Vizcon Construction, Urban Nest Inc | conversion of (e) unconditioned storage space into (n) 775sf adu with 1 bed & 1 bath,storage room, trash toter enclosure & 1hr hallway connecting the adu to building foyer. (n)wood framed steps on (e) sloped concrete floor.replace rear yard deck with new.Details
conversion of (e) unconditioned storage space into (n) 775sf adu with 1 bed & 1 bath,storage room, trash toter enclosure & 1hr hallway connecting the adu to building foyer. (n)wood framed steps on (e) sloped concrete floor.replace rear yard deck with new. | $150,000 |
| Feb 21, 2025 | In progress issued Mar 2025 | 1033 Green St | Boaz Mor Design & Construction, Barton Builders | replace beam in kitchen. reframe rear kitchen wall kind for kind. ref permit 2023-0911-6290Details
replace beam in kitchen. reframe rear kitchen wall kind for kind. ref permit 2023-0911-6290 | $12,000 |
| Feb 11, 2025 | In progress issued Mar 2025 | 160 Ulloa St | Mission Home Remodeling Inc | revision to 202408158777, install 4 skylights and 3 footings, 2 new windows openings. remove wall in kitchen, add metal beam, structural work. (original kitchen remodel no plans)Details
revision to 202408158777, install 4 skylights and 3 footings, 2 new windows openings. remove wall in kitchen, add metal beam, structural work. (original kitchen remodel no plans) | $45,000 |
| Dec 10, 2024 | Completed final sign-off Jan 2026 | 955 Grove St | Eas Solutions Inc | rear bldg: removal of roof deck and stairs to comply with nov 202184738 for work at roof.Details
rear bldg: removal of roof deck and stairs to comply with nov 202184738 for work at roof. | $10,000 |
| Dec 10, 2024 | Completed final sign-off Jan 2026 | 955 Grove St | Eas Solutions Inc | rear bldg: raise roof 44 inches at the rear of building, restore altered windows with wood windows per coa motion #486 and var nsr 2024078357. to comply with nov 202184738.Details
rear bldg: raise roof 44 inches at the rear of building, restore altered windows with wood windows per coa motion #486 and var nsr 2024078357. to comply with nov 202184738. | $20,000 |
| Oct 15, 2024 | Completed final sign-off Feb 2026 | 323 Eureka St | Eas Solutions Inc | revision to pa #2023-1122-1311 & 2024-0418-0230 add (n) roof deck & (n) staircase for the roof deck. to comply w/nov 202424283Details
revision to pa #2023-1122-1311 & 2024-0418-0230 add (n) roof deck & (n) staircase for the roof deck. to comply w/nov 202424283 | $50,000 |
| Oct 3, 2024 | In progress issued Oct 2024 | 64 Sanchez St | Mars Construction And Remodeling | addition of staircase, raise ceiling with 2 new skylights, and bathroom additionDetails
addition of staircase, raise ceiling with 2 new skylights, and bathroom addition | $50,000 |
| Jun 11, 2024 | Completed final sign-off Apr 2025 | 344 Bocana St | Sunset Remodeling And Design Inc | revision to pa 202404190319 1st fl - enlarge bedroom, relocate bathroom, relocate laundry; 2nd fl - enlarge kitchen, relocate bathroom, move bedroom 2 smallerDetails
revision to pa 202404190319 1st fl - enlarge bedroom, relocate bathroom, relocate laundry; 2nd fl - enlarge kitchen, relocate bathroom, move bedroom 2 smaller | $5,000 |
| May 21, 2024 | Completed final sign-off Apr 2025 | 344 Bocana St | Sunset Remodeling And Design Inc | second fl. new rear deck and staricase less than 10'-00" from groundDetails
second fl. new rear deck and staricase less than 10'-00" from ground | $10,000 |
| May 20, 2024 | Completed final sign-off Feb 2026 | 323 Eureka St | Eas Solutions Inc | revison to pa# 2023-1122-1311- 2nd floor addition at side yard. interior remodeling of second floor including kitchen and bath. add new half bath. add new rear deck at second floor. in kind replacement of all windows. new foldable door at rear deck.Details
revison to pa# 2023-1122-1311- 2nd floor addition at side yard. interior remodeling of second floor including kitchen and bath. add new half bath. add new rear deck at second floor. in kind replacement of all windows. new foldable door at rear deck. | $80,000 |
| May 7, 2024 | Completed final sign-off Oct 2024 | 2015 Sacramento St | Aligned Technologies Llc Dba Aligned Dev | revision to 202208170711. install 2 new steps at side yard rather than 3, install 1 step at unit 104 entry. coordinate with revised structural design.Details
revision to 202208170711. install 2 new steps at side yard rather than 3, install 1 step at unit 104 entry. coordinate with revised structural design. | |
| Apr 19, 2024 | Completed final sign-off Apr 2025 | 344 Bocana St | Sunset Remodeling And Design Inc | 1st fl -(n) bedrm, (n) full bathrm, (n) laundry; 2nd fl - convert (e) rear bedrm to kitchen to living rm; 3rd fl - add 2 (n) full bathrms; add 2 skylights; replace (e) skylilght in-kind; roof repair as necessary; front stairs tileDetails
1st fl -(n) bedrm, (n) full bathrm, (n) laundry; 2nd fl - convert (e) rear bedrm to kitchen to living rm; 3rd fl - add 2 (n) full bathrms; add 2 skylights; replace (e) skylilght in-kind; roof repair as necessary; front stairs tile | $40,000 |
| Apr 4, 2024 | In progress issued Jul 2024 | 116 San Aleso Av | Bay Remodels | voluntary structural strengthening with minor alterations. remove kitchen wall & remodel kitchenDetails
voluntary structural strengthening with minor alterations. remove kitchen wall & remodel kitchen | $30,000 |
| Feb 5, 2024 | Completed final sign-off Apr 2025 | 21 Prospect Av | Superb Builders & Custom Made Cabinetry | revision to 202311271364 to eliminate psl beams for new plan. all othere areas keep per previous plans and permits approved.Details
revision to 202311271364 to eliminate psl beams for new plan. all othere areas keep per previous plans and permits approved. | $8,000 |
| Dec 8, 2023 | Expired or cancelled expired Feb 2026 | 65 Joost Av | Almega Building | no work to existing bldg. add/construct 2 level deck for multi-residential home.add 2 entry doors,centered on interior hallway,add exterior wall sconce lighting,wiring and switches.Details
no work to existing bldg. add/construct 2 level deck for multi-residential home.add 2 entry doors,centered on interior hallway,add exterior wall sconce lighting,wiring and switches. | $35,000 |
| Nov 27, 2023 | Completed final sign-off Apr 2025 | 23 Prospect Av | Superb Builders & Custom Made Cabinetry | interior alteration on the 2nd and 3rd fl. on 2nd fl kitchen and bathroom will be remodeled; 3rd fl - 2 bedrooms will be combined as a primary bedroom; 3rd fl - 2 bathrooms will be combined as primary bathroomDetails
interior alteration on the 2nd and 3rd fl. on 2nd fl kitchen and bathroom will be remodeled; 3rd fl - 2 bedrooms will be combined as a primary bedroom; 3rd fl - 2 bathrooms will be combined as primary bathroom | $66,000 |
| Nov 22, 2023 | Completed final sign-off Feb 2026 | 323 Eureka St | Eas Solutions Inc | interior alteration @ 1/f (no change on the exterior envelope), infill courtyard, convert 162 sqft of existing garage to living area, addition of 1 bedroom and 2 bathrooms in 1/f, seismic retrofit of 1/f.Details
interior alteration @ 1/f (no change on the exterior envelope), infill courtyard, convert 162 sqft of existing garage to living area, addition of 1 bedroom and 2 bathrooms in 1/f, seismic retrofit of 1/f. | $150,000 |
| Nov 8, 2023 | In progress issued Aug 2024 | 46 Cresta Vista Dr | 457sf unconditioned into conditioned space on basement. new rear yard deck on grade on basement lv. new deck & stairs on the lower lv connecting main lv to basement lv. addition to (e) deck on main lv. new powder room & convert (e) powder room into pantry on main lv. 2 new tankless gas water heatersDetails
457sf unconditioned into conditioned space on basement. new rear yard deck on grade on basement lv. new deck & stairs on the lower lv connecting main lv to basement lv. addition to (e) deck on main lv. new powder room & convert (e) powder room into pantry on main lv. 2 new tankless gas water heaters | $100,000 | |
| Nov 6, 2023 | Completed final sign-off Apr 2024 | 77 Hoff St | Kanupriya Arora | replacement of a kind of a staircase at the rear side of the property.Details
replacement of a kind of a staircase at the rear side of the property. | $20,000 |
| Nov 2, 2023 | In progress filed Nov 2023, not yet issued | 328 Lawton St | Gadi Construction Inc | kitchen alteration - (e) wall between kitchen and dining room could be removed. the (e) chimney should be removed.Details
kitchen alteration - (e) wall between kitchen and dining room could be removed. the (e) chimney should be removed. | $50,000 |
| Oct 3, 2023 | In progress issued Oct 2023 | 5155 Diamond Heights Bl | Kanupriya Arora | revision to bpa#202306230697, (e) stair to remain as-is. no change at level 2.Details
revision to bpa#202306230697, (e) stair to remain as-is. no change at level 2. | |
| Dec 14, 2022 | Completed final sign-off Apr 2026 | 354 Douglass St | G&C Construction Services Inc. | this project involves a 44 sf addition (26 sf "fill-in" on the main fl and a 18 sf lightwell infill on the 2/f). roughly, 1100 sf interior remodel. 180 sf 30" rear deck like for like wood window replacement, widen garage door to 8'.Details
this project involves a 44 sf addition (26 sf "fill-in" on the main fl and a 18 sf lightwell infill on the 2/f). roughly, 1100 sf interior remodel. 180 sf 30" rear deck like for like wood window replacement, widen garage door to 8'. | $410,000 |