Vizcon Construction
- Based in
- Alameda
- On San Francisco permits
- Nov 2016 to Aug 2026
- Last 24 months
- 13 permits filed
19 permits since 2000: 12 completed, 7 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 18, 2026 | In progress issued Aug 2026 | 952 York St | unit #1 & unit #3. bathroom & kitchen remodel. like for like. no exterior change. no change to floor layout. no change to wall layout. no structural work. maintain all (e) fire rating.Details
unit #1 & unit #3. bathroom & kitchen remodel. like for like. no exterior change. no change to floor layout. no change to wall layout. no structural work. maintain all (e) fire rating. | $40,000 |
| Jul 7, 2026 | In progress filed Jul 2026, not yet issued | 1525 Church St | strengthen existing attic. add additional 2x8 ceiling joist/floor joist. install 5/8-3/4" cdx plywood shcathing. install 1/2" drywall.Details
strengthen existing attic. add additional 2x8 ceiling joist/floor joist. install 5/8-3/4" cdx plywood shcathing. install 1/2" drywall. | $5,000 |
| Jul 6, 2026 | In progress issued Jul 2026 | 952 York St | unit# 2 & unit# 4. bathroom & kitchenremodel. like for like. no exterior change.Details
unit# 2 & unit# 4. bathroom & kitchenremodel. like for like. no exterior change. | $40,000 |
| Jun 30, 2026 | In progress filed Jun 2026, not yet issued | 1527 Church St | demolition & removal of illegal basement conversion, case number 201282951. removal of kitchen & bathroomDetails
demolition & removal of illegal basement conversion, case number 201282951. removal of kitchen & bathroom | $2,500 |
| Jun 25, 2026 | In progress issued Jul 2026 | 952 York St | remove non-load bearing wall in garage to convert (e) storage room into parking space. add in-unit laundry by reconfiguring (e) closets in all 4 units (no work affect public right of way)Details
remove non-load bearing wall in garage to convert (e) storage room into parking space. add in-unit laundry by reconfiguring (e) closets in all 4 units (no work affect public right of way) | $40,000 |
| Jun 17, 2026 | Completed final sign-off Oct 2026 | 1527 Church St | 2nd flr only - 1) kitchen and bathroom remodeling like for like; 2) convert closet to (n) laundry room(washer & dryer);3)install new elect sub panel; 4) change patio door to swing door(not visible from street). 5)attic access ladderDetails
2nd flr only - 1) kitchen and bathroom remodeling like for like; 2) convert closet to (n) laundry room(washer & dryer);3)install new elect sub panel; 4) change patio door to swing door(not visible from street). 5)attic access ladder | $45,000 |
| Mar 17, 2026 | In progress issued Apr 2026 | 474 27th Av | remodel of 2nd and 3rd flrs including the addition of a laundry room to each of the seven units, replacement of doors per plans, remodel of (7) kitchens and bathrooms (i.e. in each unit).Details
remodel of 2nd and 3rd flrs including the addition of a laundry room to each of the seven units, replacement of doors per plans, remodel of (7) kitchens and bathrooms (i.e. in each unit). | $30,000 |
| Feb 23, 2026 | Completed final sign-off Apr 2026 | 1449 Hyde St | unit 1- kitchen and bathroom remodel to include convert tub tor shower. (n) laundry room, electrical main panel upgrade from 50amps to 100amps, painting interior and refinish hardwood floor. add dishwasher.Details
unit 1- kitchen and bathroom remodel to include convert tub tor shower. (n) laundry room, electrical main panel upgrade from 50amps to 100amps, painting interior and refinish hardwood floor. add dishwasher. | $50,000 |
| Sep 23, 2025 | Completed final sign-off Nov 2025 | 3711 Market St | address nov#: 202543429; replace decking and guard rail (in-kind)per plan. repair the stair at basement#2 less than 50% only ; (2) replace fence per plans.Details
address nov#: 202543429; replace decking and guard rail (in-kind)per plan. repair the stair at basement#2 less than 50% only ; (2) replace fence per plans. | $20,000 |
| Apr 11, 2025 | Completed final sign-off Nov 2025 | 3711 Market St | unit 1 & 2- soft demo of 2 kitchen cabinets and countertops, 3x bathrooms, and kitchen and dining room ceiling drywall. no wall removal .Details
unit 1 & 2- soft demo of 2 kitchen cabinets and countertops, 3x bathrooms, and kitchen and dining room ceiling drywall. no wall removal . | $10,000 |
| Mar 25, 2025 | Completed final sign-off Nov 2025 | 3711 Market St | unit 1 and 2; 1/f-unit#1: convert closet into laundry; 2/f-unit#2: roof deck to be legalized, convert cloet into laundry; 3/f-unit#3: convert closet into laundry.Details
unit 1 and 2; 1/f-unit#1: convert closet into laundry; 2/f-unit#2: roof deck to be legalized, convert cloet into laundry; 3/f-unit#3: convert closet into laundry. | $50,000 |
| Feb 27, 2025 | In progress issued Feb 2026 | 1449 Hyde St | conversion of (e) unconditioned storage space into (n) 775sf adu with 1 bed & 1 bath,storage room, trash toter enclosure & 1hr hallway connecting the adu to building foyer. (n)wood framed steps on (e) sloped concrete floor.replace rear yard deck with new.Details
conversion of (e) unconditioned storage space into (n) 775sf adu with 1 bed & 1 bath,storage room, trash toter enclosure & 1hr hallway connecting the adu to building foyer. (n)wood framed steps on (e) sloped concrete floor.replace rear yard deck with new. | $150,000 |
| Oct 25, 2024 | Completed final sign-off Aug 2025 | 2239 Bryant St | 1) 1st flr - storage area next to garage convert to parking space (no excavation). 2) 2nd flr - relocate kitchen, living room, and bedroom. add on bathroom and laundry room.Details
1) 1st flr - storage area next to garage convert to parking space (no excavation). 2) 2nd flr - relocate kitchen, living room, and bedroom. add on bathroom and laundry room. | $50,000 |
| Sep 28, 2023 | Completed final sign-off May 2024 | 490 Post St | 1)remove and replace window glazing only in-kind 2)repair/waterproofing of historical facade. (below 2nd flr) 3)painting of historical facade.Details
1)remove and replace window glazing only in-kind 2)repair/waterproofing of historical facade. (below 2nd flr) 3)painting of historical facade. | $150,000 |
| May 8, 2018 | Completed final sign-off Nov 2018 | 4148 23rd St | 1)removing extg hot tub. 2) removing extg stairs. 3)removing extg landscaping. 4) adding new slabes on grade. 5)adding new deck. 6) adding new stairss. 7) adding lighting.Details
1)removing extg hot tub. 2) removing extg stairs. 3)removing extg landscaping. 4) adding new slabes on grade. 5)adding new deck. 6) adding new stairss. 7) adding lighting. | $20,000 |
| Apr 18, 2018 | Completed final sign-off Apr 2018 | 1996 Union St | remove and replace (e) bathroom sink. remove and replace kitchen sink, cabinets and countertops. cutting (2) existing sink pipes and flat cup inside interior wallsDetails
remove and replace (e) bathroom sink. remove and replace kitchen sink, cabinets and countertops. cutting (2) existing sink pipes and flat cup inside interior walls | $3,000 |
| Dec 4, 2017 | Completed final sign-off Dec 2017 | 640 Los Palmos Dr | comply with nov.#201720462. demo and installation of hardie plank siding throughout, in kind.Details
comply with nov.#201720462. demo and installation of hardie plank siding throughout, in kind. | $15,000 |
| Feb 10, 2017 | Completed final sign-off Sep 2017 | 207 Ralston St | demo of interior wall & relocate built new interior wall (garage e - hallway). relocate water heater & mechanical gas furnace. 1st level - addn of new bathrm & one bedrm. legalize (e) bathrm on 1st fl. electrical work in 1st level & sewer line connection. 2nd fl kitchen remodel & recessed lightingDetails
demo of interior wall & relocate built new interior wall (garage e - hallway). relocate water heater & mechanical gas furnace. 1st level - addn of new bathrm & one bedrm. legalize (e) bathrm on 1st fl. electrical work in 1st level & sewer line connection. 2nd fl kitchen remodel & recessed lighting | $50,000 |
| Nov 17, 2016 | Completed final sign-off Feb 2017 | 775 15th Av | 1)demo of partition wall, floor tiles, & bathtub. 2) installation of new toilet and vanity top. 3)installation of new shower base tub and nw floor toilet. 4)installation of new bathroom pocket door.Details
1)demo of partition wall, floor tiles, & bathtub. 2) installation of new toilet and vanity top. 3)installation of new shower base tub and nw floor toilet. 4)installation of new bathroom pocket door. | $15,000 |