Juan Aleman-Hernandez
- Listed as
- engineer
- Firm
- Tangobuilder
- Based in
- San Francisco
- On San Francisco permits
- Dec 2021 to Feb 2025
18 permits since 2000 (engineer on 18 permits): 10 completed, 3 in progress, 1 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 21, 2025 | In progress issued Mar 2025 | 1033 Green St | Boaz Mor Design & Construction, Barton Builders | replace beam in kitchen. reframe rear kitchen wall kind for kind. ref permit 2023-0911-6290Details
replace beam in kitchen. reframe rear kitchen wall kind for kind. ref permit 2023-0911-6290 | $12,000 |
| Jan 14, 2025 | Expired or cancelled expired Feb 2026 | 583 Mangels Av | Mission Home Remodeling Inc | revision remove existing concrete area and rear stairs and provide new stairs and concrete slab revision to 2023-1122-1308Details
revision remove existing concrete area and rear stairs and provide new stairs and concrete slab revision to 2023-1122-1308 | |
| Aug 9, 2024 | In progress filed Aug 2024, not yet issued | 583 Mangels Av | Mission Home Remodeling Inc | revision to pa #202311221308 rretrofiting existing foundation wall with a sister new retaining wall.Details
revision to pa #202311221308 rretrofiting existing foundation wall with a sister new retaining wall. | $20,000 |
| Jan 29, 2024 | Completed final sign-off Jun 2024 | 712 Foerster St | Mission Home Remodeling Inc | revision to 202311221343. floor joist h oles for toilet pipeDetails
revision to 202311221343. floor joist h oles for toilet pipe | |
| Dec 8, 2023 | Expired or cancelled expired Feb 2026 | 65 Joost Av | Almega Building | no work to existing bldg. add/construct 2 level deck for multi-residential home.add 2 entry doors,centered on interior hallway,add exterior wall sconce lighting,wiring and switches.Details
no work to existing bldg. add/construct 2 level deck for multi-residential home.add 2 entry doors,centered on interior hallway,add exterior wall sconce lighting,wiring and switches. | $35,000 |
| Nov 22, 2023 | Completed final sign-off Feb 2026 | 583 Mangels Av | Mission Home Remodeling Inc | 1/f: remove (e)garage & bathrm, create new garage, laundry rm, vestibule, bedrm, bathrm, walk-in closet, new utility area; remove (e)stairs, install new prefab spiral stairs; 2/f: remove (e)kitchen/dining room, closet, create new kitchen & closet for (e) bedroom. remodel (e) bathroom. new skylight.Details
1/f: remove (e)garage & bathrm, create new garage, laundry rm, vestibule, bedrm, bathrm, walk-in closet, new utility area; remove (e)stairs, install new prefab spiral stairs; 2/f: remove (e)kitchen/dining room, closet, create new kitchen & closet for (e) bedroom. remodel (e) bathroom. new skylight. | $250,000 |
| Nov 22, 2023 | Completed final sign-off Jun 2024 | 712 Foerster St | Mission Home Remodeling Inc | remodel e kitchen. remodel existing bath. provide new skylightDetails
remodel e kitchen. remodel existing bath. provide new skylight | $100,000 |
| Sep 11, 2023 | In progress issued Nov 2023 | 1033 Green St | Mission Home Remodeling Inc, Boaz Mor Design & Construction, Barton Builders | basement level, remove e laundry, create new bath, new laundry/laundry chute. remove e bath, spiral stairs. create new stairs/closet. replace all rear windows like for like. replace e deck finishes only 1st/2nd fl. remove and replace existing roofing above the stair. new stairs. replace rear sidingDetails
basement level, remove e laundry, create new bath, new laundry/laundry chute. remove e bath, spiral stairs. create new stairs/closet. replace all rear windows like for like. replace e deck finishes only 1st/2nd fl. remove and replace existing roofing above the stair. new stairs. replace rear siding | $200,000 |
| Aug 4, 2023 | Completed final sign-off Jul 2024 | 290 Monticello St | Mission Home Remodeling Inc | revision to bpa#202305318919, underpinningn for strip footing, 1/f framing as shown on original plan.Details
revision to bpa#202305318919, underpinningn for strip footing, 1/f framing as shown on original plan. | |
| May 31, 2023 | Completed final sign-off Jul 2024 | 290 Monticello St | Mission Home Remodeling Inc | relocate (e)washer/dryer, water heater and furnance to (e) garage. create new master bedroom and bathroom. hallway and under stairs storage in the rear (e)garage. remodel existing bathroom, remodel (e) kitchen, remove and replace (e) stairs to lower floor with new guardrail/handrail. replace (e)woodDetails
relocate (e)washer/dryer, water heater and furnance to (e) garage. create new master bedroom and bathroom. hallway and under stairs storage in the rear (e)garage. remodel existing bathroom, remodel (e) kitchen, remove and replace (e) stairs to lower floor with new guardrail/handrail. replace (e)wood | $150,000 |
| Apr 18, 2023 | Expired or cancelled cancelled Jan 2026 | 417 27th St | Donny Chu Construction Inc Dba D C Cons | revision to pa# 202112305232, new foundation details per field conditions.Details
revision to pa# 202112305232, new foundation details per field conditions. | |
| Mar 21, 2023 | Completed final sign-off Jan 2024 | 417 27th St | Donny Chu Construction Inc Dba D C Cons | structural revision to permit 202112305232. new foundation detail per field conditions; add detail 3/s403 to not undermine (e) structure's foundationDetails
structural revision to permit 202112305232. new foundation detail per field conditions; add detail 3/s403 to not undermine (e) structure's foundation | |
| Feb 24, 2023 | Completed final sign-off Sep 2023 | 4333 19th St | Mission Home Remodeling Inc | guest bathroom addition - main bathroom remodel. wall framing in closet main bathroom. partial kitchen remodel & laundryDetails
guest bathroom addition - main bathroom remodel. wall framing in closet main bathroom. partial kitchen remodel & laundry | $70,000 |
| Oct 31, 2022 | Expired or cancelled withdrawn Dec 2022 | 606 Mississippi St | Sunset Remodeling And Design Inc | 1/f: convert part of (e) garage & utility room to new kitchen, living & powder rooms, new staircsae to 2/f; 2/f: (e) staircase to 3/f to be removed/relocated, new primary bedroom, primary bathroom, new full bathroom @ hallway; 3/f: install (2) new dormers, new full bathroomDetails
1/f: convert part of (e) garage & utility room to new kitchen, living & powder rooms, new staircsae to 2/f; 2/f: (e) staircase to 3/f to be removed/relocated, new primary bedroom, primary bathroom, new full bathroom @ hallway; 3/f: install (2) new dormers, new full bathroom | $20,000 |
| Aug 17, 2022 | Completed final sign-off Oct 2024 | 2015 Sacramento St | Aligned Technologies Llc Dba Aligned Dev | unit 104: remodel of (e) ground floor unit 104. excavate 7in at g/f unit.Details
unit 104: remodel of (e) ground floor unit 104. excavate 7in at g/f unit. | $60,000 |
| Jul 11, 2022 | Completed final sign-off Jul 2023 | 1 Twin Peaks Bl | Sunset Remodeling And Design Inc | interior stairs and work by plans. new roof deck. skylights, replace garage door within (e) opening.Details
interior stairs and work by plans. new roof deck. skylights, replace garage door within (e) opening. | $12,500 |
| May 27, 2022 | Never finaled issued Sep 2023, no final | 66 Gladstone Dr | Excelsior Building Group | (n) 1 bedrm, 1 bath adu at lower level. main home remodel & addition. upper level work includes (n) bathroom, office/bedroom, & stairs. lower level work includes (n) laundry area. front yard work, (n) patio & entryway for adu, replace (e) driveway w/ permeable paving.Details
(n) 1 bedrm, 1 bath adu at lower level. main home remodel & addition. upper level work includes (n) bathroom, office/bedroom, & stairs. lower level work includes (n) laundry area. front yard work, (n) patio & entryway for adu, replace (e) driveway w/ permeable paving. | $180,000 |
| Dec 30, 2021 | Completed final sign-off Jan 2024 | 417 27th St | Donny Chu Construction Inc Dba D C Cons | demolish (e) wood deck & stair in rear yard & replace w/rebuilt wood deck & stair in similar configuration. rebuilt deck is slightly larger & stair is reconfigured closer to house. rebuilt deck requires rear yard variance & will extend no farther than adjacent resident deck. 2021-009274var pcl.Details
demolish (e) wood deck & stair in rear yard & replace w/rebuilt wood deck & stair in similar configuration. rebuilt deck is slightly larger & stair is reconfigured closer to house. rebuilt deck requires rear yard variance & will extend no farther than adjacent resident deck. 2021-009274var pcl. | $35,000 |