Diamond Bridge Builders
- Based in
- San Pablo
- On San Francisco permits
- May 2026 to Nov 2026
- Last 24 months
- 5 permits filed
5 permits since 2000: 5 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Where they worked
- Single-family 2
- Multi-family (2-family, apartments) 0
- Commercial 0
- Other or unknown 3
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 2, 2026 | In progress issued Nov 2026 | 316 Santa Ana Av | revised plans to include the addition of two (2) back conditioning sections. all other previously approved work remains unchanged. ref plans 202610199628.Details
revised plans to include the addition of two (2) back conditioning sections. all other previously approved work remains unchanged. ref plans 202610199628. | $120,000 |
| Oct 19, 2026 | In progress issued Oct 2026 | 316 Santa Ana Av | foundation retrofit: excavate and install reinforced concrete underpinning beneath portions of (e) foundation. connect new concrete to (e) foundation with adhesive dowels. (e) slab on grade to remain. no change to building use, dweling unit, height or floor area.Details
foundation retrofit: excavate and install reinforced concrete underpinning beneath portions of (e) foundation. connect new concrete to (e) foundation with adhesive dowels. (e) slab on grade to remain. no change to building use, dweling unit, height or floor area. | $10,000 |
| Oct 19, 2026 | In progress issued Oct 2026 | 500 Folsom St | address correction, for 202603187796. the correct address is 500 folsom unit 500 bDetails
address correction, for 202603187796. the correct address is 500 folsom unit 500 b | |
| Oct 19, 2026 | In progress issued Oct 2026 | 500 Folsom St | address correction, for 202606131170. the correct address is 500 folsom unit 500aDetails
address correction, for 202606131170. the correct address is 500 folsom unit 500a | |
| May 13, 2026 | In progress issued Jul 2026 | 510 Folsom St | aka 500 folsom st, unit 116 & 117: mep design for ti project 202603187796 for 2596 wsf space for use as a pilates fitness studion. hvac scope includes reuse of (e) system w/ new ductwork, air terminals as needed. new ventilation. plumbing scope includes water distribution. new water heater and....Details
aka 500 folsom st, unit 116 & 117: mep design for ti project 202603187796 for 2596 wsf space for use as a pilates fitness studion. hvac scope includes reuse of (e) system w/ new ductwork, air terminals as needed. new ventilation. plumbing scope includes water distribution. new water heater and.... | $100,000 |