Permit GraphShortlistSan Francisco building permits since 2000

Robert S. Connelly

License
C27077
Architect
About the California Architects Board
Look the license up with the state (Architects Board)
Listed as
architect
Firm
Oculus
Based in
San Francisco
On San Francisco permits
Jul 2020 to Jul 2026

13 permits since 2000 (architect on 13 permits): 10 completed, 1 in progress, 1 never finaled, 1 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Cahill Contractors Llc. (3), Aaron Gordon Construction Inc, Black Mountain Development, Field Construction Inc., Malcolm International Llc, Skyline Construction, T P Windows Inc/United Glass & Aluminum
Engineers
Matthew Frantz (2), Loring Willie, Mark Moore

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jul 1, 2026Completed
final sign-off Aug 2026
478 Post StT P Windows Inc/United Glass & Aluminumremove 5-foot section of hollow, clay tile wall between two tenant spaces each with their own exits so as to create a common opening. refer to p/a 2026-0206-5495.
Details
Permit
202607014457
Permit issued
Jul 7, 2026
Final sign-off
Aug 18, 2026

remove 5-foot section of hollow, clay tile wall between two tenant spaces each with their own exits so as to create a common opening. refer to p/a 2026-0206-5495.

Open the permit page

$12,500
May 21, 2026In progress
filed May 2026, not yet issued
1111 Gough Stremodel of (3) existing restrooms.
Details
Permit
202605211680

remodel of (3) existing restrooms.

Open the permit page

$1,500,000
Nov 14, 2025Completed
final sign-off Jul 2026
2350 Turk BlCahill Contractors Llc.ref 202503041492 and 202510248069 to install production rigging equipment at usf theater
Details
Permit
202511149649
Permit issued
Feb 6, 2026
Final sign-off
Jul 28, 2026

ref 202503041492 and 202510248069 to install production rigging equipment at usf theater

Open the permit page

$200,000
Apr 11, 2025Completed
final sign-off Jul 2026
2350 Turk BlCahill Contractors Llc.renovation of (e) theater includng installation of new cat- walk over (e) stage
Details
Permit
202503041492
Permit issued
Oct 6, 2025
Final sign-off
Jul 28, 2026

renovation of (e) theater includng installation of new cat- walk over (e) stage

Open the permit page

$950,000
Nov 4, 2024Completed
final sign-off Aug 2025
1111 Gough StField Construction Inc.ti to include interior barrier removal and code upgrades including (n) lift platform, stair hand and guardrails.
Details
Permit
202411044337
Permit issued
Mar 21, 2025
Final sign-off
Aug 18, 2025

ti to include interior barrier removal and code upgrades including (n) lift platform, stair hand and guardrails.

Open the permit page

$170,000
Apr 21, 2023Expired or cancelled
cancelled Jan 2026
2555 17th Avpriest's bldg: replacement in-kind approx 53 windows units to match extg rehab units, all windows to rear & side elevations.
Details
Permit
202304216208

priest's bldg: replacement in-kind approx 53 windows units to match extg rehab units, all windows to rear & side elevations.

Open the permit page

$100,000
Mar 20, 2023Completed
final sign-off Feb 2024
2350 Turk BlSkyline Constructiontheater/school of education building: life safety & accessibility upgrades. including new platform lift & exit doors.
Details
Permit
202303203972
Permit issued
Jun 13, 2023
Final sign-off
Feb 7, 2024

theater/school of education building: life safety & accessibility upgrades. including new platform lift & exit doors.

Open the permit page

$73,000
Sep 30, 2022Never finaled
issued Oct 2022, no final
1 Steuart LnBlack Mountain Developmentunit #2001: demo of non-structural partitions, new interior lighting, new interior partitions, installation of new finishes, plumbing fixtures, and new cabinetry. no structural work.
Details
Permit
202209303559
Permit issued
Oct 28, 2022

unit #2001: demo of non-structural partitions, new interior lighting, new interior partitions, installation of new finishes, plumbing fixtures, and new cabinetry. no structural work.

Open the permit page

$80,000
Mar 21, 2022Completed
final sign-off Mar 2024
940 Laguna Honda Blvoluntary structural seismic upgrade. accessibility code upgrades
Details
Permit
202203210452
Permit issued
Mar 31, 2023
Final sign-off
Mar 18, 2024

voluntary structural seismic upgrade. accessibility code upgrades

Open the permit page

$2,000,000
Oct 25, 2021Completed
final sign-off Feb 2025
330 Parker AvMalcolm International Llcvoluntary structural remedial work to private elevated roadway/via duct in-kind. all work to be performed out doors
Details
Permit
202110251098
Permit issued
Nov 17, 2021
Final sign-off
Feb 14, 2025

voluntary structural remedial work to private elevated roadway/via duct in-kind. all work to be performed out doors

Open the permit page

$3,000,000
May 21, 2021Completed
final sign-off Nov 2025
2335 Golden Gate AvCahill Contractors Llc.construct (n) approx 15,600 sf addition, 45-ft basketball practice facility on the usf lower campus. 1 full basketball court, 2 partial shooting/drills courts, coaches' offices, conf rms, restrms, & storage room.
Details
Permit
202105210845
Permit issued
Oct 4, 2022
Final sign-off
Nov 7, 2025

construct (n) approx 15,600 sf addition, 45-ft basketball practice facility on the usf lower campus. 1 full basketball court, 2 partial shooting/drills courts, coaches' offices, conf rms, restrms, & storage room.

Open the permit page

$15,000,000
Apr 23, 2021Completed
final sign-off Apr 2023
201 Folsom StAaron Gordon Construction Incunit 38d: interior renovation. new interior lighting. new cabinets, no structural work. no change of use.
Details
Permit
202104239224
Permit issued
May 14, 2021
Final sign-off
Apr 7, 2023

unit 38d: interior renovation. new interior lighting. new cabinets, no structural work. no change of use.

Open the permit page

$20,000
Jul 16, 2020Completed
final sign-off Jul 2023
50 Thomas More Wyinstallation of a new platform lift system assocated with accessibility path of travel upgrdaes deferred under structural seismic upgrade pa201905079955, other works include installation of new casework.
Details
Permit
202007160357
Permit issued
Feb 9, 2021
Final sign-off
Jul 28, 2023

installation of a new platform lift system assocated with accessibility path of travel upgrdaes deferred under structural seismic upgrade pa201905079955, other works include installation of new casework.

Open the permit page

$150,000