Cameron Helland
- Listed as
- architect, authorized agent-others
- Firm
- Helland Architecture
- Based in
- San Francisco
- On San Francisco permits
- Sep 2021 to Sep 2026
19 permits since 2000 (architect on 18 permits, authorized agent-others on 1 permit): 11 completed, 4 in progress, 1 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 17, 2026 | In progress filed Sep 2026, not yet issued | 273 Dolores St | Kadon Construction | erect type vb 2-story adu residence in rear of yard.Details
erect type vb 2-story adu residence in rear of yard. | $235,000 |
| May 13, 2026 | In progress filed May 2026, not yet issued | 191 San Felipe Av | Hunter Dale Builders Inc. | attached adu addition @ basement level of (e) rear yard. minor interior remodel at the lower level only, new deck at lower level. construction of new, one-car garage at the rear yard, and new grading and surface improvements to (e) shared access driveway at the alley. demo garage under seperate pa.Details
attached adu addition @ basement level of (e) rear yard. minor interior remodel at the lower level only, new deck at lower level. construction of new, one-car garage at the rear yard, and new grading and surface improvements to (e) shared access driveway at the alley. demo garage under seperate pa. | $390,000 |
| May 13, 2026 | In progress filed May 2026, not yet issued | 191 San Felipe Av | Hunter Dale Builders Inc. | demo type 5b 2-car garage at rear.Details
demo type 5b 2-car garage at rear. | $10,000 |
| Mar 17, 2026 | In progress issued Aug 2026 | 2790 Harrison St | unit a: 1 existing non-structural interior parition wall to be raised, demo 1 existing non-structural wall, 1 new non-structural wall, add convention oven.Details
unit a: 1 existing non-structural interior parition wall to be raised, demo 1 existing non-structural wall, 1 new non-structural wall, add convention oven. | $3,500 | |
| Sep 24, 2025 | Completed final sign-off Mar 2026 | 1696 Hayes St | Xspace Builder | t.i. of an existing food & beverage space on ground floor of an existing residencial building: work to include new full and half height non-load bearing walls; new service counter; new finishes and new fixed/unfixed furniture; mechanical, electrical and plumbing under seperate permit.Details
t.i. of an existing food & beverage space on ground floor of an existing residencial building: work to include new full and half height non-load bearing walls; new service counter; new finishes and new fixed/unfixed furniture; mechanical, electrical and plumbing under seperate permit. | $150,000 |
| Jul 18, 2025 | Completed final sign-off Apr 2026 | 1777 Vallejo St | Will Beyerbach Construction | replace all existing kitchen cabinets, counters and appliancesDetails
replace all existing kitchen cabinets, counters and appliances | $59,000 |
| Jul 18, 2024 | Expired or cancelled cancelled Aug 2024 | 191 San Felipe Av | construction of a(n) attached accessory dwelling unit,addition @ the basement level of the(e)rear yard,minor interior remodel @ lower level only,(n)deck @lower level,construction of a(n) deck @ lower level,construction of a(n) one car garageDetails
construction of a(n) attached accessory dwelling unit,addition @ the basement level of the(e)rear yard,minor interior remodel @ lower level only,(n)deck @lower level,construction of a(n) deck @ lower level,construction of a(n) one car garage | $390,000 | |
| Jul 16, 2024 | Completed final sign-off Nov 2024 | 89 Belgrave Av | Kadon Construction | revision to previous permit# 202211156492: revised mechanical mini-split unit and revised t-24 energy report.Details
revision to previous permit# 202211156492: revised mechanical mini-split unit and revised t-24 energy report. | |
| Mar 28, 2024 | Expired or cancelled cancelled Jul 2024 | 191 San Felipe Av | demo a dettached 2 car garage.Details
demo a dettached 2 car garage. | $10,000 | |
| Mar 28, 2024 | Expired or cancelled cancelled Jul 2024 | 191 San Felipe Av | construction of a(n) attached accessory dwelling unit,addition @ the basement level of the(e)rear yard,minor interior remodel @ lower level only,(n)deck @lower level,construction of a(n) deck @ lower level,construction of a(n) one car garageDetails
construction of a(n) attached accessory dwelling unit,addition @ the basement level of the(e)rear yard,minor interior remodel @ lower level only,(n)deck @lower level,construction of a(n) deck @ lower level,construction of a(n) one car garage | $350,000 | |
| Oct 16, 2023 | Completed final sign-off Dec 2023 | 170 Junipero Serra Bl | Trinity Building Co Llc | revision to pa# 202205164330, revised structural details for deck guardrail per building inspector request.Details
revision to pa# 202205164330, revised structural details for deck guardrail per building inspector request. | $100 |
| Jul 14, 2023 | Never finaled issued Aug 2023, no final | 398 Hayes St | to comply with sffd nov for place of assembly permit for shared outdoor garden space. shared space includes (1) ada compliant exit to ivy street, occupant load is 48. no construction required.Details
to comply with sffd nov for place of assembly permit for shared outdoor garden space. shared space includes (1) ada compliant exit to ivy street, occupant load is 48. no construction required. | ||
| Jan 20, 2023 | Completed final sign-off Nov 2023 | 2182 Green St | Trinity Building Co Llc | kitchen and (2) bathroom remodels. no structural work.Details
kitchen and (2) bathroom remodels. no structural work. | $100,000 |
| Nov 15, 2022 | Completed final sign-off Nov 2024 | 89 Belgrave Av | 5 Elements Design | to erect a 2-story, type vb, 1-unit adu structure at rear.Details
to erect a 2-story, type vb, 1-unit adu structure at rear. | $375,000 |
| Feb 3, 2022 | Completed final sign-off Dec 2022 | 7 Danvers St | Kadon Construction | 7a danvers street: rev to pa202102104427 sheet a-2: side yard stair access revision to have a landingDetails
7a danvers street: rev to pa202102104427 sheet a-2: side yard stair access revision to have a landing | $500 |
| Feb 1, 2022 | Completed final sign-off Jan 2023 | 249 Corbett Av | Kadon Construction | new electrical room in existing mechanical room. addition of rated cabinet around gas meters.Details
new electrical room in existing mechanical room. addition of rated cabinet around gas meters. | $500 |
| Dec 1, 2021 | Completed final sign-off Dec 2023 | 170 Junipero Serra Bl | Trinity Building Co Llc | interior remodel including 4 existing bathroom remodels, 1 new bathroom, new interior finishes, new lighting/electrical fixtures, new radiant heating throughout.Details
interior remodel including 4 existing bathroom remodels, 1 new bathroom, new interior finishes, new lighting/electrical fixtures, new radiant heating throughout. | $500,000 |
| Sep 29, 2021 | Completed final sign-off Aug 2022 | 1001 Minnesota St | Cookline Construction Inc | expansion of (e) restaurant into adj space. (n) bar & bar equip; (n) ada & non-ada unisex washrooms as req; (n) aux kitchen w/ type ii hood; (e) kitchen remodel w/ (n) type 1 hood; (n) non-load bearing walls; (n) finishes, fixtures & equip;(n) unfixed tables & chairs.Details
expansion of (e) restaurant into adj space. (n) bar & bar equip; (n) ada & non-ada unisex washrooms as req; (n) aux kitchen w/ type ii hood; (e) kitchen remodel w/ (n) type 1 hood; (n) non-load bearing walls; (n) finishes, fixtures & equip;(n) unfixed tables & chairs. | $300,000 |
| Sep 23, 2021 | Completed final sign-off Jan 2023 | 7 Danvers St | Kadon Construction | administrative permit to correct scope of work under pa#2021-0210-4427. the corrected scope of work to include "revision to pa#2019-0416-8082".Details
administrative permit to correct scope of work under pa#2021-0210-4427. the corrected scope of work to include "revision to pa#2019-0416-8082". |