Will Beyerbach Construction
- Based in
- Petaluma
- On San Francisco permits
- May 2023 to Jul 2025
- Last 24 months
- 2 permits filed
5 permits since 2000: 3 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 18, 2025 | Completed final sign-off Apr 2026 | 1777 Vallejo St | replace all existing kitchen cabinets, counters and appliancesDetails
replace all existing kitchen cabinets, counters and appliances | $59,000 |
| Apr 14, 2025 | In progress issued Apr 2025 | 1727 45th Av | replace (6) windows in rear of building in kind. not visible from street. same size, same location, same operation, same opening, no structural work. maintain eero per cbc 1031 as required. u factor 0.30 maxDetails
replace (6) windows in rear of building in kind. not visible from street. same size, same location, same operation, same opening, no structural work. maintain eero per cbc 1031 as required. u factor 0.30 max | $9,500 |
| May 24, 2024 | In progress issued Aug 2024 | 3514 Geary Bl | to comply with awning amnesty program abate 2022-012400enfDetails
to comply with awning amnesty program abate 2022-012400enf | |
| May 6, 2024 | Completed final sign-off Dec 2024 | 1750 North Point St | convert (e) one bath/one half bath into two full bath each with a shower, toilet and lavatoroyDetails
convert (e) one bath/one half bath into two full bath each with a shower, toilet and lavatoroy | $25,000 |
| May 3, 2023 | Completed final sign-off Oct 2023 | 173 27th St | bathroom remodel. no change in footprint. replace 2 total windows in-kind at the 2nd floor lightwell (same size, same location). dryrot repair in-kind at 2nd floor bathroom exterior wall to match existing. no work visible from street.Details
bathroom remodel. no change in footprint. replace 2 total windows in-kind at the 2nd floor lightwell (same size, same location). dryrot repair in-kind at 2nd floor bathroom exterior wall to match existing. no work visible from street. | $25,000 |