Back to bathroom remodel contractors
Will Beyerbach Construction
- Based in
- Petaluma
- On San Francisco permits
- May 2023 to Jul 2025
- Last 24 months
- 2 permits filed
5 permits since 2000: 3 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 26 days from filing to permit and 166 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 6, 2024 | Completed final sign-off Dec 2024 | 1750 North Point St | convert (e) one bath/one half bath into two full bath each with a shower, toilet and lavatoroyDetails
convert (e) one bath/one half bath into two full bath each with a shower, toilet and lavatoroy | $25,000 |
| May 3, 2023 | Completed final sign-off Oct 2023 | 173 27th St | bathroom remodel. no change in footprint. replace 2 total windows in-kind at the 2nd floor lightwell (same size, same location). dryrot repair in-kind at 2nd floor bathroom exterior wall to match existing. no work visible from street.Details
bathroom remodel. no change in footprint. replace 2 total windows in-kind at the 2nd floor lightwell (same size, same location). dryrot repair in-kind at 2nd floor bathroom exterior wall to match existing. no work visible from street. | $25,000 |