Michael John Mccall
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Mccall Design Group
- Based in
- San Francisco
- On San Francisco permits
- Jul 2006 to Nov 2017
29 permits since 2000 (architect on 26 permits, authorized agent-others on 1 permit, designer on 1 permit, engineer on 1 permit): 17 completed, 8 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 10, 2017 | Completed final sign-off Jul 2018 | 2 Embarcadero Center | Gray West Construction Inc | ground floor - convert partial stock room into fitting rm/closet, reconfigure cabinet wall in sales area. creat ada fitting rm; 2nd fl - convert closet into pos niche, reconfigure cabinet wall in sales area, install atachere display window, add ada toilet rm sign dual gender. convert w/ada hcfr dimsDetails
ground floor - convert partial stock room into fitting rm/closet, reconfigure cabinet wall in sales area. creat ada fitting rm; 2nd fl - convert closet into pos niche, reconfigure cabinet wall in sales area, install atachere display window, add ada toilet rm sign dual gender. convert w/ada hcfr dims | $185,667 |
| Jun 2, 2017 | Completed final sign-off Sep 2017 | 2083 Union St | Timberwolff Construction Inc | minor ti of (e) retail space to includes update of non load bearing interior partitions, floor finishes, furniture, lighting, electrical work & minor plumbing work. storefront scope includes cosmetic patch, repair, and refresh of (e) finishes, shelving & signage under seperate permit.Details
minor ti of (e) retail space to includes update of non load bearing interior partitions, floor finishes, furniture, lighting, electrical work & minor plumbing work. storefront scope includes cosmetic patch, repair, and refresh of (e) finishes, shelving & signage under seperate permit. | $175,000 |
| May 15, 2017 | Never finaled issued May 2017, no final | 90 New Montgomery St | Angotti & Reilly Inc. | 2/f #250- t.i. for an office space in an existing multi story office bldg. scope includes new gypsum board walls, millwork, minor electrical, plumbing & hvac, paint & finishes. n/a ordinance #155-13Details
2/f #250- t.i. for an office space in an existing multi story office bldg. scope includes new gypsum board walls, millwork, minor electrical, plumbing & hvac, paint & finishes. n/a ordinance #155-13 | $141,000 |
| Jul 11, 2016 | Expired or cancelled cancelled Jan 2026 | 2223 Fillmore St | revision to ref pa 2015 1027 0876: ti of (e) retail space, change of ownership, change from formula retail - black fleese ro formula retail use - intermix. new non bearing partitions, ceilinmg, finishes and hvac. the (e) storefront shall remain.Details
revision to ref pa 2015 1027 0876: ti of (e) retail space, change of ownership, change from formula retail - black fleese ro formula retail use - intermix. new non bearing partitions, ceilinmg, finishes and hvac. the (e) storefront shall remain. | $315,477 | |
| Jul 8, 2016 | Never finaled issued Sep 2016, no final | 256 Grant Av | American Mechanical Inc | revision to 201510220534. add 1 water sourced heat pump.Details
revision to 201510220534. add 1 water sourced heat pump. | $80,000 |
| Nov 12, 2015 | Completed final sign-off Apr 2016 | 3251 20th Av | Del Smith Design Build | ste 138: relocation and expansion of an established massage therapy in ground level, scope includes wall partitions, suspended ceiling, electrical, mechanical and plumbing.Details
ste 138: relocation and expansion of an established massage therapy in ground level, scope includes wall partitions, suspended ceiling, electrical, mechanical and plumbing. | $95,000 |
| Oct 27, 2015 | Never finaled issued Jun 2016, no final | 2223 Fillmore St | Solex Contracting Inc | tenant improvement of an existing retail space including but not limited to the construction of new non-bearing partitions, ceilings, finishes, and hvac. the existing store front shall remain.Details
tenant improvement of an existing retail space including but not limited to the construction of new non-bearing partitions, ceilings, finishes, and hvac. the existing store front shall remain. | $315,477 |
| Sep 2, 2015 | Completed final sign-off Sep 2015 | 415 De Haro St | South Bay Construction | revision to app #201503130835. bathroom relocation to provide as built in order to obain "co" n/a for maherDetails
revision to app #201503130835. bathroom relocation to provide as built in order to obain "co" n/a for maher | |
| Jul 7, 2015 | Completed final sign-off Apr 2016 | 2142 Fillmore St | Doyle Developments | remove 2 (e) counters,rise up toe kick from 4" to 8" & put 2 (e) counters on top of new 8" toe kick,install 4 shelves, paint,floorDetails
remove 2 (e) counters,rise up toe kick from 4" to 8" & put 2 (e) counters on top of new 8" toe kick,install 4 shelves, paint,floor | $12,000 |
| Jul 1, 2015 | Completed final sign-off Aug 2015 | 415 De Haro St | Terra Nova Industries | revision ap# 201503231587 & 201506259877. change of egress per plan. maher n/a.Details
revision ap# 201503231587 & 201506259877. change of egress per plan. maher n/a. | |
| Jun 22, 2015 | Never finaled issued Sep 2015, no final | 300 Folsom St | Trainor Commercial Construction Inc. | t.i.- construction of coffee ship, 1990 sq.ft., install wall partitions, susp. ceiling, plumbing, electrical. installation of food service equipment. modify fire sprinklers, mechanical system. n/a ordinance #155-13Details
t.i.- construction of coffee ship, 1990 sq.ft., install wall partitions, susp. ceiling, plumbing, electrical. installation of food service equipment. modify fire sprinklers, mechanical system. n/a ordinance #155-13 | $250,000 |
| Jan 23, 2015 | Never finaled issued Apr 2015, no final | 549 Castro St | Terra Nova Industries | change from vacant commercial space to coffee shop. tenant mprovement remvoe (e) walls, construct (n) partition walls, (n) storefront window, flooring, electrical, plumbing, mech systems. install food service equip & counters.Details
change from vacant commercial space to coffee shop. tenant mprovement remvoe (e) walls, construct (n) partition walls, (n) storefront window, flooring, electrical, plumbing, mech systems. install food service equip & counters. | $250,000 |
| Dec 16, 2014 | Completed final sign-off Jan 2017 | 1246 Folsom St | install partition with door.Details
install partition with door. | $2,500 | |
| Nov 3, 2014 | Completed final sign-off Apr 2015 | 1258 Minnesota St | Trainor Commercial Construction Inc. | construction of coffee shop in the ground level of an existing 5 story building. scope of work includes installation of wall partitions, cabinets, food service equipment, electrical and plumbing system. n/a ordinance #155-13.Details
construction of coffee shop in the ground level of an existing 5 story building. scope of work includes installation of wall partitions, cabinets, food service equipment, electrical and plumbing system. n/a ordinance #155-13. | $250,000 |
| Nov 3, 2014 | Completed final sign-off Jun 2015 | 1 Front St | Gci, Inc | #100-ti a coffee shop in (e) g/f in a 2 story annex bldg connected to a 38 story office bldg, install of non-load bearing partitions, ceilings, food service equipment, millwork, mechanical duct work, electrical/plumbing systems no work at exterior, signal permitted seperately. n/a ord.#155-13Details
#100-ti a coffee shop in (e) g/f in a 2 story annex bldg connected to a 38 story office bldg, install of non-load bearing partitions, ceilings, food service equipment, millwork, mechanical duct work, electrical/plumbing systems no work at exterior, signal permitted seperately. n/a ord.#155-13 | $200,000 |
| Sep 12, 2014 | Completed final sign-off Mar 2019 | 411 Ofarrell St | Del Smith Design Build | tenant improvement to (e) 759 s.f. enclosed mezzanine space located behind double height lobby in youth hostel - work to include removal of interior partiiton & construction of interior millwork project also includes minor plumbing & electrical alteration. n/a maher ordinanceDetails
tenant improvement to (e) 759 s.f. enclosed mezzanine space located behind double height lobby in youth hostel - work to include removal of interior partiiton & construction of interior millwork project also includes minor plumbing & electrical alteration. n/a maher ordinance | $50,000 |
| Jun 27, 2014 | Expired or cancelled cancelled Jan 2026 | 7 Powell St | 3rd level: renovation tenant improvement work of retail store. new partitions, finishes, fixtures & lighting. mechanical under separate permit. n/a maher ordinance. life safety to be deferred.Details
3rd level: renovation tenant improvement work of retail store. new partitions, finishes, fixtures & lighting. mechanical under separate permit. n/a maher ordinance. life safety to be deferred. | $294,000 | |
| Jun 27, 2014 | Expired or cancelled cancelled Jan 2026 | 7 Powell St | 1st floor renovation tenant improvement work of retail store. new partitions, finishes, lighting & electric. mechanical separate permit. n/a maher ordinanceDetails
1st floor renovation tenant improvement work of retail store. new partitions, finishes, lighting & electric. mechanical separate permit. n/a maher ordinance | $295,000 | |
| Jun 27, 2014 | Expired or cancelled cancelled Jan 2026 | 7 Powell St | second level tenant improvement work of retail store. new floor fixtures, finishes, paint, lighting. mechanical under separate permit. n/a maher ordinanceDetails
second level tenant improvement work of retail store. new floor fixtures, finishes, paint, lighting. mechanical under separate permit. n/a maher ordinance | $205,000 | |
| May 21, 2013 | Completed final sign-off May 2014 | 3936 24th St | Integrity Construction Maintenance Inc | move one office, new carpet, tile, paint, new casework, new non-bearing partition wall.Details
move one office, new carpet, tile, paint, new casework, new non-bearing partition wall. | $40,000 |
| Dec 13, 2012 | Completed final sign-off Mar 2016 | 33 Powell St | The Hatch Group Inc | scope of work includes non-bearing interior partition walls, (n) floor finishes, (n) paint, (n) casework & furniture, electrical work, mechanical work & plumbing work.sprinkler and fire alarm permit on seperate permits. n/a ordinance #155-13Details
scope of work includes non-bearing interior partition walls, (n) floor finishes, (n) paint, (n) casework & furniture, electrical work, mechanical work & plumbing work.sprinkler and fire alarm permit on seperate permits. n/a ordinance #155-13 | $1,070,000 |
| Jul 3, 2012 | Completed final sign-off Nov 2012 | 865 Market St | work @ space# 3320 & s326 only. revision to pa# 2012/05/24/1200. revise storefront by adding additional portal openings. add wall cabinets and displays. relocate mens room and electrical room in stock room- sprinklers and fire alarm separate permit.Details
work @ space# 3320 & s326 only. revision to pa# 2012/05/24/1200. revise storefront by adding additional portal openings. add wall cabinets and displays. relocate mens room and electrical room in stock room- sprinklers and fire alarm separate permit. | $37,000 | |
| Apr 20, 2007 | Completed final sign-off Aug 2007 | 2100 Chestnut St | Pacific Construction & Mfg. | remodel(e)retail space sales area only-include remove portion of (e)wall framing to accept new sales floor fixtures&route (e) elec to new fixture.casewk liteing,refinish (e)wood flooring& storefront finishes,repl (e)trackheads&down lites.repaint interior,repl(e)elec fl boxes.adddisabe toilet room...Details
remodel(e)retail space sales area only-include remove portion of (e)wall framing to accept new sales floor fixtures&route (e) elec to new fixture.casewk liteing,refinish (e)wood flooring& storefront finishes,repl (e)trackheads&down lites.repaint interior,repl(e)elec fl boxes.adddisabe toilet room... | $819,000 |
| Feb 21, 2007 | Never finaled issued Feb 2007, no final | 865 Market St | Pinnacle Construction, Inc. | space #330 - to eliminate note 1 of special inspection on seet s01.1 of permit application 200607318139.Details
space #330 - to eliminate note 1 of special inspection on seet s01.1 of permit application 200607318139. | |
| Feb 7, 2007 | Completed final sign-off Apr 2007 | 301 Sutter St | Shrader & Martinez Const. Inc | removal of awnings. repalce glass. remove transom. repaint exterior.Details
removal of awnings. repalce glass. remove transom. repaint exterior. | $250,000 |
| Dec 12, 2006 | Never finaled issued Dec 2006, no final | 845 Market St | Trainor Commercial Construction Inc. | installation of trasformer detail 2nd floorDetails
installation of trasformer detail 2nd floor | |
| Nov 20, 2006 | Completed final sign-off Mar 2007 | 865 Market St | Rcm Fire Protection Inc. | to relocate 121 sprinklers from existing outlets, delete 22 existing.Details
to relocate 121 sprinklers from existing outlets, delete 22 existing. | $18,000 |
| Aug 30, 2006 | Never finaled issued Sep 2006, no final | 845 Market St | Rcm Fire Protection Inc. | olive oil, space# 227. 2/fl, cti-4, sp.Details
olive oil, space# 227. 2/fl, cti-4, sp. | $10,000 |
| Jul 31, 2006 | Completed final sign-off Mar 2007 | 865 Market St | remodel of (e) retail space @ s.f. center. sales, non sales & storefront area. partitions, door, fixtures, ceiling, etc. minor mep work. all exterior h/c accessibility upgrade under appl#200511077585Details
remodel of (e) retail space @ s.f. center. sales, non sales & storefront area. partitions, door, fixtures, ceiling, etc. minor mep work. all exterior h/c accessibility upgrade under appl#200511077585 | $349,720 |