Luis Adalberto Cardoza
- Listed as
- contractor, designer
- Firm
- Handy Construction Team Inc
- Based in
- South San Francisco
- On San Francisco permits
- May 2005 to Oct 2026
222 permits since 2000 (contractor on 221 permits, designer on 1 permit): 179 completed, 2 in progress, 17 never finaled, 24 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. Their ranked record as a contractor is on their contractor page. How to read these records
Worked with
Every other licensed party on the 100 most recent of their permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Baird Development And Construction Inc, Bjlgc Inc, Maguire Inc Dba Lahue And Associates
- Architects
- Mason Kirby (4), Kenneth Wayne Martin, Mark Topetcher, Matthew Hum, Shen Chiou
- Engineers
- George Fong (3), Engin Yagmur (2), David Owen Crestfield, Francisco Duarte, Jeff Tsz Wai Chow, Lawrence Wong, Rodrigo Santos, Stanley Wu, Vitezslav Hanacek, William Wettic
Most recent permits
Showing the 100 most recent of 222.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 8, 2026 | In progress filed Oct 2026, not yet issued | 1727 Newcomb Av | Handy Construction Team Inc | add second mean of egress at ground level install (n) exit door, 3x6'8 nominal at rear wall of (e) room , (n) door opening to swing outward with (n) door framing to include header and trimmer studs per structrual. provide (n) 36 in x 36in landing. no change to building footprint no change toDetails
add second mean of egress at ground level install (n) exit door, 3x6'8 nominal at rear wall of (e) room , (n) door opening to swing outward with (n) door framing to include header and trimmer studs per structrual. provide (n) 36 in x 36in landing. no change to building footprint no change to | $20,000 |
| Sep 28, 2026 | Completed final sign-off Oct 2026 | 9 Claude Ln | Handy Construction Team Inc | prep sink installation, add fridge, sandwich prep table, countertop oven to warm bread onlyDetails
prep sink installation, add fridge, sandwich prep table, countertop oven to warm bread only | $750 |
| Aug 17, 2026 | Completed final sign-off Oct 2026 | 260 Church St | Handy Construction Team Inc | cosmetic renovation of commerical space: coffee counter replacement, like-for-like; replace floor behind counter. replace (e) appliances w/new appliances in same location. non-structural work.Details
cosmetic renovation of commerical space: coffee counter replacement, like-for-like; replace floor behind counter. replace (e) appliances w/new appliances in same location. non-structural work. | $1,500 |
| Jun 3, 2026 | Completed final sign-off Jul 2026 | 1801 Ellis St | Handy Construction Team Inc | repair dryrot damage in corner back wall back of bldg, replace wood same kind and size. 3.6 wide x 24 feet height area. all work is in back of bldg, non street facing.Details
repair dryrot damage in corner back wall back of bldg, replace wood same kind and size. 3.6 wide x 24 feet height area. all work is in back of bldg, non street facing. | $19,000 |
| Jan 22, 2026 | Completed final sign-off Jun 2026 | 245 Dorado Tr | Handy Construction Team Inc | abate nov#202545796. enlarge 1/2 bathroom, add a shower. new wet bar, cabinets, refridgerator. fill in existing door detween garage and libing space. convert laundry to storage, move laundry equipment to garage.Details
abate nov#202545796. enlarge 1/2 bathroom, add a shower. new wet bar, cabinets, refridgerator. fill in existing door detween garage and libing space. convert laundry to storage, move laundry equipment to garage. | $8,000 |
| Dec 23, 2025 | Completed final sign-off Feb 2026 | 209 Lake Merced Hill St North St | Handy Construction Team Inc | partion wall that will divide a laundry room and storage room. non plumbing, electrical fixture. non structural work.Details
partion wall that will divide a laundry room and storage room. non plumbing, electrical fixture. non structural work. | $8,000 |
| Nov 21, 2025 | In progress issued Dec 2025 | 79 Scotia Av | Handy Construction Team Inc | abate nov 202432066. demo e illegal bathroom structure in rear yard.Details
abate nov 202432066. demo e illegal bathroom structure in rear yard. | $500 |
| Nov 14, 2024 | Completed final sign-off Jul 2025 | 453 Broderick St | Handy Construction Team Inc | replace existing plaster in ceiling in area of work next to new psl beam, living & dining room. ref pa# 202409170983.Details
replace existing plaster in ceiling in area of work next to new psl beam, living & dining room. ref pa# 202409170983. | $7,000 |
| Oct 1, 2024 | Completed final sign-off Nov 2024 | 508 Clayton St | Handy Construction Team Inc | add a rear roof deck to top unit. add new deck framing w/ cable gaurdrails. roof deck on 3rd floorDetails
add a rear roof deck to top unit. add new deck framing w/ cable gaurdrails. roof deck on 3rd floor | $20,000 |
| Sep 17, 2024 | Completed final sign-off Jul 2025 | 453 Broderick St | Handy Construction Team Inc | remove existing bearing wall at 453 broderick street at the top floor. w/new beam and post.Details
remove existing bearing wall at 453 broderick street at the top floor. w/new beam and post. | $8,000 |
| Sep 9, 2024 | Completed final sign-off Oct 2024 | 302 26th Av | Handy Construction Team Inc | non-structural replacement of damaged (not dryrot) siding (~110lf) with new rustic 1x8 ext grade. work to be perfomed only in the back of building, non-street facing.Details
non-structural replacement of damaged (not dryrot) siding (~110lf) with new rustic 1x8 ext grade. work to be perfomed only in the back of building, non-street facing. | $3,000 |
| Dec 13, 2023 | Completed final sign-off Aug 2024 | 1458 Quesada Av | Handy Construction Team Inc | due to water leakage replace (e) footing to new, also create a new ceiling height at groung fl. remove (e) kitchen and alter one bath room at ground floor.Details
due to water leakage replace (e) footing to new, also create a new ceiling height at groung fl. remove (e) kitchen and alter one bath room at ground floor. | $10,000 |
| Dec 12, 2023 | Completed final sign-off Jul 2024 | 1000 Prague St | Handy Construction Team Inc | stucco replacement on all four sides. cornice flare to remain; remove horizontal band.install waterproofing felt paper two layers and 3 coats of stucco. scratch brown and finish/ over new stucco wire.Details
stucco replacement on all four sides. cornice flare to remain; remove horizontal band.install waterproofing felt paper two layers and 3 coats of stucco. scratch brown and finish/ over new stucco wire. | $28,000 |
| Oct 31, 2023 | Completed final sign-off Feb 2024 | 3979 24th St | Maguire Inc Dba Lahue And Associates | install signage for new nutritional supply store "logo" & "atlas health center", on a single faced non-electrical 3/8in brushed aluminium metal mounted sign.Details
install signage for new nutritional supply store "logo" & "atlas health center", on a single faced non-electrical 3/8in brushed aluminium metal mounted sign. | $5,000 |
| Sep 13, 2023 | Completed final sign-off Apr 2024 | 1417 12th Av | Handy Construction Team Inc | top unit 1417: kitchen and bath remodel in kind. non structural work. new finishes in kitchen and bath, new fixtures and appliances. new cabinets, countertop, tile, backsplash, flooring in kitchen,paint etcDetails
top unit 1417: kitchen and bath remodel in kind. non structural work. new finishes in kitchen and bath, new fixtures and appliances. new cabinets, countertop, tile, backsplash, flooring in kitchen,paint etc | $50,000 |
| Jul 18, 2023 | Completed final sign-off Sep 2023 | 306 Fair Oaks St | Handy Construction Team Inc | comply with nov 202308468: item#2 only for this permit. minor stairs repair <50%. upgrade guardrailing height.Details
comply with nov 202308468: item#2 only for this permit. minor stairs repair <50%. upgrade guardrailing height. | $6,000 |
| Jun 16, 2023 | Completed final sign-off Jun 2023 | 914 Diamond St | Handy Construction Team Inc | revision to bpa#202008212343, laundry room removed from original scope of work to gain more space in family room.Details
revision to bpa#202008212343, laundry room removed from original scope of work to gain more space in family room. | |
| Jun 15, 2023 | Completed final sign-off Aug 2023 | 701 Capp St | Handy Construction Team Inc | comply w/ nov# 201876783 and 201938171: 701-a capp st- all repairs to be done in kind. using exterior materials where needed. repair stairs less than 50%, repair broken glass and sashes.Details
comply w/ nov# 201876783 and 201938171: 701-a capp st- all repairs to be done in kind. using exterior materials where needed. repair stairs less than 50%, repair broken glass and sashes. | $18,000 |
| May 25, 2023 | Completed final sign-off Sep 2023 | 670 08th Av | Handy Construction Team Inc | unit 4: remodel kitchen and bathroom in kind. new sink, stove and garbage disposal, new lighting fix and plumbing new bathtub and toilet and new gfi's as need. non structural work. no changes in wall layout.Details
unit 4: remodel kitchen and bathroom in kind. new sink, stove and garbage disposal, new lighting fix and plumbing new bathtub and toilet and new gfi's as need. non structural work. no changes in wall layout. | $40,000 |
| May 22, 2023 | Expired or cancelled cancelled Jan 2026 | 701 Capp St | Handy Construction Team Inc | 701-701a capp st:replace 10 (e) windows in-kind; same size along capp st side only. interior & exterior mouulding to be resused as possible and renailed. exterior siding to be renails ; prepeartion of entire wall/paint and finish color. inteiror touchups in window wall only.Details
701-701a capp st:replace 10 (e) windows in-kind; same size along capp st side only. interior & exterior mouulding to be resused as possible and renailed. exterior siding to be renails ; prepeartion of entire wall/paint and finish color. inteiror touchups in window wall only. | $85,000 |
| May 4, 2023 | Expired or cancelled withdrawn Dec 2024 | 3979 24th St | Handy Construction Team Inc | construction of a new pony wall 16' lf in front of front desk. 46"-50" 58" height and new cap cover. 4 wall framing w/ wall board. no change of use. tenant improvement only.Details
construction of a new pony wall 16' lf in front of front desk. 46"-50" 58" height and new cap cover. 4 wall framing w/ wall board. no change of use. tenant improvement only. | $8,000 |
| Apr 17, 2023 | Completed final sign-off May 2023 | 1919 Broderick St | Handy Construction Team Inc | to comply with nov 202306527 dry rot repair (minor area); siding replacement as needed; rebuild parapet wall @ frontDetails
to comply with nov 202306527 dry rot repair (minor area); siding replacement as needed; rebuild parapet wall @ front | $5,000 |
| Apr 12, 2023 | Completed final sign-off Jul 2023 | 1315 Monterey Bl | Handy Construction Team Inc | replace damaged stucco in entire house. install new waterproofing membrane, install new stucco wire and apply three coating of stucco, scratch brown and finsh texture to match existing one. non structural work.Details
replace damaged stucco in entire house. install new waterproofing membrane, install new stucco wire and apply three coating of stucco, scratch brown and finsh texture to match existing one. non structural work. | $50,000 |
| Mar 22, 2023 | Expired or cancelled cancelled Jan 2026 | 3001 Sacramento St | Handy Construction Team Inc | drywall repair behind sinks. after patching walls, apply paint to match (e). rev.to 202107275178Details
drywall repair behind sinks. after patching walls, apply paint to match (e). rev.to 202107275178 | $2,500 |
| Mar 8, 2023 | Never finaled issued Mar 2023, no final | 1919 Broderick St | Handy Construction Team Inc | remove deck temporary for reroofing works, reinstall deck back in-kind after roof works complete, 3) repair deck as needed.Details
remove deck temporary for reroofing works, reinstall deck back in-kind after roof works complete, 3) repair deck as needed. | $30,000 |
| Jan 30, 2023 | Completed final sign-off Feb 2023 | 60 Landers St | Handy Construction Team Inc | comply with nov: 202299930. minor repair in exisitng stairs exterior (not visible from street) less than % 50. replace 3 steps and 2 riser. repair in kind. elevate (e) railing to comply with code.Details
comply with nov: 202299930. minor repair in exisitng stairs exterior (not visible from street) less than % 50. replace 3 steps and 2 riser. repair in kind. elevate (e) railing to comply with code. | $3,000 |
| Dec 29, 2022 | Completed final sign-off Oct 2025 | 285 Mullen Av | Handy Construction Team Inc | add 95 sq ft bedroom to the rear of the home with the replacement of the (e)adjacent membrane roof.home is 925 sq ft,2 bed/1bath.no changes are proposed to the(e) basement or detached garage.addition will not be visible from the public right of way,no changes to front or overall bldg height.Details
add 95 sq ft bedroom to the rear of the home with the replacement of the (e)adjacent membrane roof.home is 925 sq ft,2 bed/1bath.no changes are proposed to the(e) basement or detached garage.addition will not be visible from the public right of way,no changes to front or overall bldg height. | $40,000 |
| Sep 27, 2022 | Expired or cancelled cancelled Jan 2026 | 3979 24th St | Handy Construction Team Inc | paint sign "atlas health center". no installation. | $1,800 |
| Jul 1, 2022 | Completed final sign-off Oct 2022 | 1125 Diamond St | Handy Construction Team Inc | revision #202205275194: upgrade project cost in $10,000. as per inspector correction.Details
revision #202205275194: upgrade project cost in $10,000. as per inspector correction. | $10,000 |
| May 27, 2022 | Completed final sign-off Oct 2022 | 1125 Diamond St | Handy Construction Team Inc | replacement partial (e) footing and concrete slab-on-grade in garage at south side.Details
replacement partial (e) footing and concrete slab-on-grade in garage at south side. | $7,500 |
| May 6, 2022 | Completed final sign-off Jul 2022 | 112 Clipper St | Handy Construction Team Inc | to comply with nov 202173118. revision "1" to (e) pa 202009023324. rebuild exterior side walls in the sunroom due to dry-rot damage. remove ceiling joists for extra ceiling height, and add new windows in the sunroom area. remove 2 ft overhang above existing deck.Details
to comply with nov 202173118. revision "1" to (e) pa 202009023324. rebuild exterior side walls in the sunroom due to dry-rot damage. remove ceiling joists for extra ceiling height, and add new windows in the sunroom area. remove 2 ft overhang above existing deck. | $20,000 |
| Dec 16, 2021 | Completed final sign-off Jul 2022 | 4400 25th St | Handy Construction Team Inc | replace existing fixtures in bathroom (toilet, sink). install new hot/cold water lines valves. replace damaged shower pan (remodel in kind).Details
replace existing fixtures in bathroom (toilet, sink). install new hot/cold water lines valves. replace damaged shower pan (remodel in kind). | $15,000 |
| Nov 29, 2021 | Completed final sign-off Jun 2024 | 101 Upper Tr | Handy Construction Team Inc | renew building permit application #'s 201706068526, 201708164970 and 201711093604 for final inspection. all work is completed.Details
renew building permit application #'s 201706068526, 201708164970 and 201711093604 for final inspection. all work is completed. | |
| Oct 18, 2021 | Completed final sign-off Dec 2021 | 225 09th Av | Handy Construction Team Inc | to comply with nov2021082289, 202182135: remodel bathroom in-kind. no layout floor plan changes.Details
to comply with nov2021082289, 202182135: remodel bathroom in-kind. no layout floor plan changes. | $8,000 |
| Aug 5, 2021 | Completed final sign-off Sep 2021 | 3859 21st St | Handy Construction Team Inc | replace damaged moulding at both sides of handrailing wall, remove damage cap pierce 2x12 and 1x4 at all sides of wall/stairs. use cedar wood pipe. small pierce to be redwood. stair frame to remain intact. non structural work.Details
replace damaged moulding at both sides of handrailing wall, remove damage cap pierce 2x12 and 1x4 at all sides of wall/stairs. use cedar wood pipe. small pierce to be redwood. stair frame to remain intact. non structural work. | $10,000 |
| Jun 9, 2021 | Completed final sign-off Jun 2023 | 914 Diamond St | Handy Construction Team Inc | temporary vertical shoringDetails
temporary vertical shoring | $10,000 |
| Apr 21, 2021 | Completed final sign-off Oct 2021 | 15 Dolores St | Handy Construction Team Inc | unit 4: remodel bath like for like toilet, sink tile around walls. replace outlets with new gfci. replace elec plumbing fixtures, kitchen remodel like for like. remove and replace cabinets and countertops no struc workDetails
unit 4: remodel bath like for like toilet, sink tile around walls. replace outlets with new gfci. replace elec plumbing fixtures, kitchen remodel like for like. remove and replace cabinets and countertops no struc work | $25,000 |
| Mar 8, 2021 | Completed final sign-off Jul 2022 | 112 Clipper St | Handy Construction Team Inc | convert 3rd floor storage space to a bathroom. all work on 3rd floor interior only. no horizontal or vertical addition.Details
convert 3rd floor storage space to a bathroom. all work on 3rd floor interior only. no horizontal or vertical addition. | $18,000 |
| Mar 2, 2021 | Never finaled issued Mar 2021, no final | 391 Nevada St | Handy Construction Team Inc | dry rot repair in bathroom. repair in kind. construction of new shower pan and adding two circuits for bathroom.Details
dry rot repair in bathroom. repair in kind. construction of new shower pan and adding two circuits for bathroom. | $25,000 |
| Oct 28, 2020 | Never finaled issued Oct 2020, no final | 427 Orizaba Av | Handy Construction Team Inc | replace damage t1-11 plywood siding in front of the house. siding to be as per king. no changes. realce all moldings.Details
replace damage t1-11 plywood siding in front of the house. siding to be as per king. no changes. realce all moldings. | $10,000 |
| Aug 21, 2020 | Completed final sign-off Jun 2023 | 914 Diamond St | Handy Construction Team Inc | create 1 adu in (e) sfd building footprint and height per ordinance 162-16. excavate 2ft for storage, adu will be 629sf on g/f with 1 bedroom & 1 bathroom.Details
create 1 adu in (e) sfd building footprint and height per ordinance 162-16. excavate 2ft for storage, adu will be 629sf on g/f with 1 bedroom & 1 bathroom. | $200,000 |
| Jun 30, 2020 | Completed final sign-off Jul 2020 | 427 Orizaba Av | Handy Construction Team Inc | siding replacement in kind, exterior of the house, rear wall, west side.Details
siding replacement in kind, exterior of the house, rear wall, west side. | $10,000 |
| Jun 30, 2020 | Never finaled issued Jun 2020, no final | 728 Lawton St | Handy Construction Team Inc | 2 bathroom like to like: 1 guest bath & 1 mastr bath @ second floor.Details
2 bathroom like to like: 1 guest bath & 1 mastr bath @ second floor. | $45,000 |
| Mar 2, 2020 | Completed final sign-off Mar 2020 | 418 Pennsylvania Av | Handy Construction Team Inc | replace tile in bathroom over bathtub only. install tile backer with waterproofing felt asphalt paper and new tiles to match as close possible the existing. replace hot/cold shower valve only. 2nd floor bathroom. non structural workDetails
replace tile in bathroom over bathtub only. install tile backer with waterproofing felt asphalt paper and new tiles to match as close possible the existing. replace hot/cold shower valve only. 2nd floor bathroom. non structural work | $8,000 |
| Jan 6, 2020 | Completed final sign-off Mar 2021 | 48 Keystone Wy | Handy Construction Team Inc | 1) legalized extg bedroom and extg bathroom at 1st floor. 2)remove extg partition walls at 2nd floor. a new wood beam adds at ceiling level and new wood posts to the foundation. 3)remodel extg kitchen and remodel extg bathroom at 2nd floor.Details
1) legalized extg bedroom and extg bathroom at 1st floor. 2)remove extg partition walls at 2nd floor. a new wood beam adds at ceiling level and new wood posts to the foundation. 3)remodel extg kitchen and remodel extg bathroom at 2nd floor. | $40,000 |
| Dec 30, 2019 | Completed final sign-off Feb 2020 | 85 Clairview Ct | Handy Construction Team Inc | repair dry rot behind stucco and area 12 x 12 around garage door. only sheathing plywood frame seems ok. inside the garage. non street facing - non-structural work.Details
repair dry rot behind stucco and area 12 x 12 around garage door. only sheathing plywood frame seems ok. inside the garage. non street facing - non-structural work. | $9,000 |
| Dec 9, 2019 | Completed final sign-off Feb 2020 | 85 Clairview Ct | Handy Construction Team Inc | remodel bath like per like. replace tile, floor, walls, new bath, toilet, sink, med cabinet, drywall and paint. 5'w 7-6" long. no structural workDetails
remodel bath like per like. replace tile, floor, walls, new bath, toilet, sink, med cabinet, drywall and paint. 5'w 7-6" long. no structural work | $10,000 |
| Oct 17, 2019 | Completed final sign-off Nov 2019 | 141 Christopher Dr | Handy Construction Team Inc | bathroom remodel, in kind. non structural work.Details
bathroom remodel, in kind. non structural work. | $20,000 |
| Oct 3, 2019 | Completed final sign-off Dec 2019 | 3848 Sacramento St | Handy Construction Team Inc | unit 2 - remodel 1 kitchen ana 1 bathroom in kind. replace cabinets and fixtures. new appliance in kitchen, replace tiles in bathroom. no structural work. add new shower pan in bath.Details
unit 2 - remodel 1 kitchen ana 1 bathroom in kind. replace cabinets and fixtures. new appliance in kitchen, replace tiles in bathroom. no structural work. add new shower pan in bath. | $20,000 |
| Sep 16, 2019 | Completed final sign-off Oct 2019 | 366 Guttenberg St | Handy Construction Team Inc | repair damage in garage door, right side and replace four broke studs', install new sheathing plywood ¾ cdx and re-stucco broken area plus or minus 40 - 50 square feet reinstall new garage door and apply prime paint.Details
repair damage in garage door, right side and replace four broke studs', install new sheathing plywood ¾ cdx and re-stucco broken area plus or minus 40 - 50 square feet reinstall new garage door and apply prime paint. | $8,000 |
| Sep 10, 2019 | Completed final sign-off Feb 2020 | 542 Rhode Island St | Handy Construction Team Inc | amendment to pa 2019-0408-7384 move 1 window and add 1 new windowDetails
amendment to pa 2019-0408-7384 move 1 window and add 1 new window | $15,000 |
| Sep 9, 2019 | Expired or cancelled cancelled Jan 2026 | 255 Mullen Av | Handy Construction Team Inc | rebuild existing rear roof deck in kind | $20,000 |
| Sep 9, 2019 | Completed final sign-off Nov 2019 | 814 Moultrie St | Handy Construction Team Inc | replace (e) countertops in kitchen only. repaint kitchen cabinets and paint entire main level. replace existing sub panel in handrail in hallway for a new one.Details
replace (e) countertops in kitchen only. repaint kitchen cabinets and paint entire main level. replace existing sub panel in handrail in hallway for a new one. | $15,000 |
| Aug 1, 2019 | Completed final sign-off Nov 2019 | 1519 La Salle Av | Handy Construction Team Inc | expansion of living space to 1st flr to include bedroom, bath and family rm. new sliding door at 1st flr rearDetails
expansion of living space to 1st flr to include bedroom, bath and family rm. new sliding door at 1st flr rear | $60,000 |
| Jul 9, 2019 | Completed final sign-off Sep 2019 | 1519 La Salle Av | Handy Construction Team Inc | partial demolition in ground level/garage. remove existing non-bearing parition wall in garage area.Details
partial demolition in ground level/garage. remove existing non-bearing parition wall in garage area. | $5,000 |
| Jul 2, 2019 | Completed final sign-off Feb 2020 | 39 Prague St | Handy Construction Team Inc | add new bathroom within 1at fl. foot print, relocate laundry equipment, add new rear yard foundation drain & sump pump, install gwb-garage walls and & ceilingDetails
add new bathroom within 1at fl. foot print, relocate laundry equipment, add new rear yard foundation drain & sump pump, install gwb-garage walls and & ceiling | $20,000 |
| May 22, 2019 | Completed final sign-off Jun 2019 | 417 Gough St | Handy Construction Team Inc | remove all losing moulding around 2nd level bay window only. clean exisitng moulding and prime before renailing it. install new moulding if exisitng is too damaged and caulk, seal it, install three tower scaffold to perform work.Details
remove all losing moulding around 2nd level bay window only. clean exisitng moulding and prime before renailing it. install new moulding if exisitng is too damaged and caulk, seal it, install three tower scaffold to perform work. | $3,100 |
| May 3, 2019 | Completed final sign-off Nov 2019 | 521 Utah St | Handy Construction Team Inc | rev to pa# 201712186714; add fire rating notes and detal resulting from pre app meetingDetails
rev to pa# 201712186714; add fire rating notes and detal resulting from pre app meeting | |
| Apr 8, 2019 | Completed final sign-off Feb 2020 | 542 Rhode Island St | Handy Construction Team Inc | new office and bathroom on 1st floor. add two new stairs.Details
new office and bathroom on 1st floor. add two new stairs. | $18,000 |
| Mar 6, 2019 | Completed final sign-off May 2019 | 234 Molimo Dr | Handy Construction Team Inc | remodeling of kitchen and bathroom in upper level as per kind. remodeling of bathroom in lower level as per kind. bathroom #1 - 6x10, bathroom #2 - 8x8. kitchen size 10x12Details
remodeling of kitchen and bathroom in upper level as per kind. remodeling of bathroom in lower level as per kind. bathroom #1 - 6x10, bathroom #2 - 8x8. kitchen size 10x12 | $70,000 |
| Feb 25, 2019 | Completed final sign-off May 2019 | 1163 Munich St | Handy Construction Team Inc | voluntary upgrade at the ground fl. footingDetails
voluntary upgrade at the ground fl. footing | $40,000 |
| Feb 20, 2019 | Completed final sign-off Apr 2019 | 1231 York St | Handy Construction Team Inc | relocate extg laundry area to new closet location at hallway in same level of unit. non-structural work only few penetration for plmg work. to comply with nov #201918151.Details
relocate extg laundry area to new closet location at hallway in same level of unit. non-structural work only few penetration for plmg work. to comply with nov #201918151. | $2,500 |
| Feb 1, 2019 | Completed final sign-off Apr 2019 | 48 Lucy St | Handy Construction Team Inc | renail existing t1-11 siding exterior plywood at both sides of house where is possible. install vapor barrier paper (tyrex or asphalt felt a15). install new 1 x 8 cement board over existing exterior sheathing. prime and paint.Details
renail existing t1-11 siding exterior plywood at both sides of house where is possible. install vapor barrier paper (tyrex or asphalt felt a15). install new 1 x 8 cement board over existing exterior sheathing. prime and paint. | $15,000 |
| Jan 17, 2019 | Never finaled issued Jan 2019, no final | 523 Utah St | Handy Construction Team Inc | street space | |
| Dec 3, 2018 | Completed final sign-off Jun 2019 | 417 Gough St | Handy Construction Team Inc | repair of siding less than 500sf. remove borking siding at very top and replace it i-kind in light well. non-structural work.Details
repair of siding less than 500sf. remove borking siding at very top and replace it i-kind in light well. non-structural work. | $18,000 |
| Oct 24, 2018 | Completed final sign-off Oct 2019 | 523 Utah St | Handy Construction Team Inc | renovate kitchen and bath. widen (e) doorway at living rm. replace (e) windows and door at extension (east & south walls). (n) skylight at removed (e) chimney. (n) 1 hr window for bathroom. maher n/aDetails
renovate kitchen and bath. widen (e) doorway at living rm. replace (e) windows and door at extension (east & south walls). (n) skylight at removed (e) chimney. (n) 1 hr window for bathroom. maher n/a | $40,000 |
| Sep 27, 2018 | Completed final sign-off Mar 2019 | 19 Landers St | Handy Construction Team Inc | replace existing single paned wood and metal sash with new dual pane wood sash (10) some visible from street, same openings. max u-factor 0.32.Details
replace existing single paned wood and metal sash with new dual pane wood sash (10) some visible from street, same openings. max u-factor 0.32. | $15,000 |
| Sep 27, 2018 | Completed final sign-off Mar 2019 | 19 Landers St | Handy Construction Team Inc | kitchen remodel, including enlarging 2 interior openings, replacement of e gravity heat with new heat pump heating/cooling, installation of thermal insulation and attic vents. windows on a separate permitDetails
kitchen remodel, including enlarging 2 interior openings, replacement of e gravity heat with new heat pump heating/cooling, installation of thermal insulation and attic vents. windows on a separate permit | $60,000 |
| Sep 5, 2018 | Completed final sign-off Sep 2018 | 2288 19th Av | Handy Construction Team Inc | to comply with nov 201887811 replace existing siding at front north & south sides visible from street. replace in-kind.Details
to comply with nov 201887811 replace existing siding at front north & south sides visible from street. replace in-kind. | $3,000 |
| Jun 19, 2018 | Completed final sign-off Aug 2018 | 3848 26th St | Handy Construction Team Inc | revision to pa#201803123432. remove & replace in-kind damage siding at west side wall of bldg.Details
revision to pa#201803123432. remove & replace in-kind damage siding at west side wall of bldg. | $10,000 |
| May 29, 2018 | Completed final sign-off Aug 2018 | 3848 26th St | Handy Construction Team Inc | revision to 2018.0312.3432. remove and replace, in kind, trim and sheathing around windows for dryrot repair. replace seven front facing vinyl windows with aluminum-clad wood sashes within same openings.Details
revision to 2018.0312.3432. remove and replace, in kind, trim and sheathing around windows for dryrot repair. replace seven front facing vinyl windows with aluminum-clad wood sashes within same openings. | $10,000 |
| May 2, 2018 | Completed final sign-off Jul 2019 | 75 Webster St | Handy Construction Team Inc | renew for final 201409166408, 201502118108, 201608084408Details
renew for final 201409166408, 201502118108, 201608084408 | |
| May 2, 2018 | Completed final sign-off Sep 2019 | 75 Webster St | Handy Construction Team Inc | comply with physical inspection report cc 8222Details
comply with physical inspection report cc 8222 | $25,000 |
| Mar 12, 2018 | Completed final sign-off Aug 2018 | 3848 26th St | Handy Construction Team Inc | front - repair leak over garage. remove tile terrazzo and damaded waterproofing and replace in kind. remove damaged three lap siding on east facade and replace in kind with new horizontal wood three lap siding on east wall side only. install new insulationDetails
front - repair leak over garage. remove tile terrazzo and damaded waterproofing and replace in kind. remove damaged three lap siding on east facade and replace in kind with new horizontal wood three lap siding on east wall side only. install new insulation | $40,000 |
| Feb 23, 2018 | Never finaled issued Feb 2018, no final | 336 Duncan St | Handy Construction Team Inc | replace tile in (e) shower as per kind, replace hot/cold water, valves & shower pan only non structural work replace fan/new gfi's outlets renail siding at both sides of building where is possible & paint two sides walls only paint west & east side only use 10d;s galvinized to nail (no alteration toDetails
replace tile in (e) shower as per kind, replace hot/cold water, valves & shower pan only non structural work replace fan/new gfi's outlets renail siding at both sides of building where is possible & paint two sides walls only paint west & east side only use 10d;s galvinized to nail (no alteration to | $10,000 |
| Dec 18, 2017 | Completed final sign-off Jun 2018 | 3830 18th St | Handy Construction Team Inc | ext. wood siding repair/replacement in remaining half west wall , north side & 1/2 east wall only. remove (e) siding, install waterproof felt paper & new siding. work not visible from street.Details
ext. wood siding repair/replacement in remaining half west wall , north side & 1/2 east wall only. remove (e) siding, install waterproof felt paper & new siding. work not visible from street. | $20,000 |
| Oct 13, 2017 | Completed final sign-off Jul 2022 | 456 08th Av | Handy Construction Team Inc | rear addition with new 2nd dwelling unit partially within (e) ground floor level. modification as required to (e) dwelling. new unit has 2 bedroom & 2 baths.Details
rear addition with new 2nd dwelling unit partially within (e) ground floor level. modification as required to (e) dwelling. new unit has 2 bedroom & 2 baths. | $100,000 |
| Sep 22, 2017 | Completed final sign-off Jan 2018 | 1970 Fell St | Handy Construction Team Inc | unit # 8 replace kitchen cabinets in kind only, replace (e) bathtub for a new shower in bathroom ,replace sink and toilet in same location. install new led lightrs in living room & dining roomDetails
unit # 8 replace kitchen cabinets in kind only, replace (e) bathtub for a new shower in bathroom ,replace sink and toilet in same location. install new led lightrs in living room & dining room | $10,000 |
| Sep 7, 2017 | Completed final sign-off Sep 2017 | 221 Lake St | Handy Construction Team Inc | repair damage moulding pine around 3 windows & +/- 30 t0o 40 lf of dryrot siding in rear wall at corner in kind. non structural work. new wood to be same sizes and for exterior cedar.Details
repair damage moulding pine around 3 windows & +/- 30 t0o 40 lf of dryrot siding in rear wall at corner in kind. non structural work. new wood to be same sizes and for exterior cedar. | $5,000 |
| Aug 22, 2017 | Completed final sign-off Oct 2017 | 180 Bocana St | Handy Construction Team Inc | repair leaking windows front of house. repair around windows only. replace dry rot wood, in kind.Details
repair leaking windows front of house. repair around windows only. replace dry rot wood, in kind. | $5,500 |
| Aug 1, 2017 | Completed final sign-off May 2019 | 371 Coleridge St | Handy Construction Team Inc | increase value of work: $70,000; refer to (e) permit 201506260030s1, no change to work scope.Details
increase value of work: $70,000; refer to (e) permit 201506260030s1, no change to work scope. | $70,000 |
| May 31, 2017 | Expired or cancelled cancelled Jul 2017 | 389 South Van Ness Av | Handy Construction Team Inc | to comply with nov# 201780971, items 1 through 5Details
to comply with nov# 201780971, items 1 through 5 | $500 |
| May 15, 2017 | Completed final sign-off Oct 2017 | 138 Bronte St | Handy Construction Team Inc | convert (e) 1/f laundry, bathroom & storage room into (n) bedroom and office, (n) 385 sq.ft. habitable space.Details
convert (e) 1/f laundry, bathroom & storage room into (n) bedroom and office, (n) 385 sq.ft. habitable space. | $85,000 |
| Apr 19, 2017 | Completed final sign-off Dec 2017 | 3830 18th St | Handy Construction Team Inc | renovation of 2nd fl unit and 3rd fl unit. exterior wood siding repair/replacement. window replacement like for like on 2nd and 3rd flDetails
renovation of 2nd fl unit and 3rd fl unit. exterior wood siding repair/replacement. window replacement like for like on 2nd and 3rd fl | $125,000 |
| Feb 17, 2017 | Never finaled filed Feb 2017, never issued | 135 Alpha St | Handy Construction Team Inc | comply with nov# 201580601. legalization of dwelling unit per ordinance# 43-14. 2 bedroom & 2 baths.Details
comply with nov# 201580601. legalization of dwelling unit per ordinance# 43-14. 2 bedroom & 2 baths. | $10,000 |
| Feb 9, 2017 | Completed final sign-off Oct 2017 | 249 Mullen Av | Handy Construction Team Inc | revision to 201608266155 additions 28 l.f. foundation front of house and east front side. replace broken, damaged (e) foundation in south/east cornerDetails
revision to 201608266155 additions 28 l.f. foundation front of house and east front side. replace broken, damaged (e) foundation in south/east corner | $13,000 |
| Jan 9, 2017 | Completed final sign-off Mar 2020 | 1167 Munich St | Bjlgc Inc, Handy Construction Team Inc | add (n) vertical 2nd fl w/ (n) bedroom, bath. kitchen: replace (e) cabinets, counter, sink & fixtures. bathroom: replace (e) vanity, sink, lights & fixtures.Details
add (n) vertical 2nd fl w/ (n) bedroom, bath. kitchen: replace (e) cabinets, counter, sink & fixtures. bathroom: replace (e) vanity, sink, lights & fixtures. | $160,000 |
| Jan 4, 2017 | Completed final sign-off Oct 2017 | 249 Mullen Av | Handy Construction Team Inc | revise project cost to upgrade $55.000 from (s45,000 to $100,000 ) permit # 201608266115Details
revise project cost to upgrade $55.000 from (s45,000 to $100,000 ) permit # 201608266115 | $55,000 |
| Dec 28, 2016 | Completed final sign-off Jul 2019 | 1719 Alabama St | Baird Development And Construction Inc, Handy Construction Team Inc | previously review under app#201212035284(withdrawn). remove pitched roof at 3rd floor level (top floor). replace with flat roof addition at 3rd floor level. add roof top deck. remodel extg 1st and 2nd story. reconfigure floor plans, add bedrooms and bathrooms.Details
previously review under app#201212035284(withdrawn). remove pitched roof at 3rd floor level (top floor). replace with flat roof addition at 3rd floor level. add roof top deck. remodel extg 1st and 2nd story. reconfigure floor plans, add bedrooms and bathrooms. | $140,000 |
| Dec 2, 2016 | Completed final sign-off Jan 2017 | 1591 Treat Av | Handy Construction Team Inc | installation of insulation and sheetrock at garage interior walls & ceilings, hallway, walls & ceilings and exposed ceilings of ground floor behind garage. all work is at garage & hallway - 5/8" type x drywall/sheetrock.Details
installation of insulation and sheetrock at garage interior walls & ceilings, hallway, walls & ceilings and exposed ceilings of ground floor behind garage. all work is at garage & hallway - 5/8" type x drywall/sheetrock. | $5,000 |
| Dec 2, 2016 | Completed final sign-off Aug 2017 | 1500 Innes Av | Handy Construction Team Inc | demo work. remove damaged plaster and lath from ceilings and walls in two level of bldg. existing windows to remain. no structural work to be done. bldg is vacant and will remain vacant. no additional work.Details
demo work. remove damaged plaster and lath from ceilings and walls in two level of bldg. existing windows to remain. no structural work to be done. bldg is vacant and will remain vacant. no additional work. | $25,000 |
| Dec 1, 2016 | Completed final sign-off Dec 2017 | 415 Myra Wy | Handy Construction Team Inc | to comply w/complaint #201636771 to legalize deck(n) gravel boxes in rear yard per plan, (n) free standing deck structure in rear per plan. comply with complaint #201636771 by legalizing (e) deck with 20 ft by 20ft, 10-feet above grade, total area 400 sq feet.Details
to comply w/complaint #201636771 to legalize deck(n) gravel boxes in rear yard per plan, (n) free standing deck structure in rear per plan. comply with complaint #201636771 by legalizing (e) deck with 20 ft by 20ft, 10-feet above grade, total area 400 sq feet. | $5,000 |
| Oct 13, 2016 | Completed final sign-off Apr 2017 | 3848 Sacramento St | Handy Construction Team Inc | revision to bpa 2015-1007-9119 revise shearwall locations and ces site condition.Details
revision to bpa 2015-1007-9119 revise shearwall locations and ces site condition. | |
| Oct 11, 2016 | Completed final sign-off Apr 2017 | 3848 Sacramento St | Handy Construction Team Inc | upgrade cost of the job. revision of pa # 201510079119 from 20k to 270kDetails
upgrade cost of the job. revision of pa # 201510079119 from 20k to 270k | $270,000 |
| Jul 13, 2016 | Completed final sign-off Dec 2016 | 263 Mullen Av | Handy Construction Team Inc | renovation of 1st floor unit. remodel bathroom kitchen & living room.Details
renovation of 1st floor unit. remodel bathroom kitchen & living room. | $50,000 |
| Jun 29, 2016 | Completed final sign-off Jul 2016 | 336 Duncan St | Handy Construction Team Inc | provide two skylights @ top unit.u factor 0.55 (16sf skylight )Details
provide two skylights @ top unit.u factor 0.55 (16sf skylight ) | $6,000 |
| Jun 20, 2016 | Completed final sign-off Aug 2016 | 468 Fell St | Handy Construction Team Inc | revision to ref pa 2015 0812 4056 revise as built structural details. also increase the construction cost. maher naDetails
revision to ref pa 2015 0812 4056 revise as built structural details. also increase the construction cost. maher na | |
| May 20, 2016 | Completed final sign-off May 2016 | 387 South Van Ness Av | Handy Construction Team Inc | ref pa# 201509046169. increase valuation only per bid inspector b.c.Details
ref pa# 201509046169. increase valuation only per bid inspector b.c. | $30,000 |
| Apr 13, 2016 | Completed final sign-off Apr 2016 | 608 Ofarrell St | Handy Construction Team Inc | comply with nov # 201610581. remove and replace tile around leaking shower valve. remove backing and install new hardy backer for repair only. work in unit #25 only.Details
comply with nov # 201610581. remove and replace tile around leaking shower valve. remove backing and install new hardy backer for repair only. work in unit #25 only. | $3,000 |
| Mar 29, 2016 | Completed final sign-off Oct 2016 | 73 Webster St | Handy Construction Team Inc | soft story retrofit at garage level - sfbc chapter 34b, 2012 iebc appendix a-4.Details
soft story retrofit at garage level - sfbc chapter 34b, 2012 iebc appendix a-4. | $10,000 |