Block 6549, lot 007
112 Clipper St
- City’s use
- Single Family Residential
- Built
- 1900
- Stories
- 3
- Units
- 1
- Rooms
- 4 bedrooms, 4 bathrooms
- Building
- 2,673 sq ft
- Lot
- 2,848 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 18, 2025 | Completed final sign-off Sep 2025 | 112 Clipper St | replace (e) illegally installed man-door with a wood garage door to match previously approved. legalize street facing windows & entry door (w00d; removal of udu per planning code sec 317 (c) (10) and planning violation 2022010618enf; document previously non-permitted changes to the ground floor.Details
replace (e) illegally installed man-door with a wood garage door to match previously approved. legalize street facing windows & entry door (w00d; removal of udu per planning code sec 317 (c) (10) and planning violation 2022010618enf; document previously non-permitted changes to the ground floor. | $3,000 | |
| May 6, 2022 | Completed final sign-off Jul 2022 | 112 Clipper St | Handy Construction Team Inc | to comply with nov 202173118. revision "1" to (e) pa 202009023324. rebuild exterior side walls in the sunroom due to dry-rot damage. remove ceiling joists for extra ceiling height, and add new windows in the sunroom area. remove 2 ft overhang above existing deck.Details
to comply with nov 202173118. revision "1" to (e) pa 202009023324. rebuild exterior side walls in the sunroom due to dry-rot damage. remove ceiling joists for extra ceiling height, and add new windows in the sunroom area. remove 2 ft overhang above existing deck. | $20,000 |
| Mar 8, 2021 | Completed final sign-off Jul 2022 | 112 Clipper St | Handy Construction Team Inc | convert 3rd floor storage space to a bathroom. all work on 3rd floor interior only. no horizontal or vertical addition.Details
convert 3rd floor storage space to a bathroom. all work on 3rd floor interior only. no horizontal or vertical addition. | $18,000 |
| Sep 2, 2020 | Completed final sign-off Jul 2022 | 112 Clipper St | remodel (e) kitchen & bathroom @ 2nd story, replace french door w/sliding door, remove load bearing wall.Details
remodel (e) kitchen & bathroom @ 2nd story, replace french door w/sliding door, remove load bearing wall. | $80,000 | |
| Jul 7, 2020 | Completed final sign-off Aug 2020 | 112 Clipper St | Cal State Roofing Co Inc | reroofing.Details
reroofing. | $14,000 |
| Oct 22, 2007 | Expired or cancelled expired Jun 2009 | 112 Clipper St | remove water damaged drywall & carpeting & replace with new. replace rear patio door with new hinged french door. replace rear exterior wood solid door with new steel 1/2 glass ext. door. replace 2 rear windows with new insulated windows. replace (e) bath fixtures & tile with new. cannot be seenDetails
remove water damaged drywall & carpeting & replace with new. replace rear patio door with new hinged french door. replace rear exterior wood solid door with new steel 1/2 glass ext. door. replace 2 rear windows with new insulated windows. replace (e) bath fixtures & tile with new. cannot be seen | $9,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Handy Construction Team Inc (2), Cal State Roofing Co Inc
- Engineers
- Engin Yagmur (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.