Block 4266, lot 024
1231 York St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 2
- Units
- 2
- Rooms
- 2 bathrooms
- Building
- 1,434 sq ft
- Lot
- 2,299 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
17 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 9, 2025 | Completed final sign-off Nov 2025 | 1231 York St | G M Building And Construction Inc | replace (2) damage front doors and (3) back exterior doors on back of house. in kind replacementDetails
replace (2) damage front doors and (3) back exterior doors on back of house. in kind replacement | $5,000 |
| Jan 26, 2023 | Completed final sign-off Mar 2023 | 1231 York St | Handyman Heroes Inc. | demo tile and subfloor in bathroom. remove existing toilet and vanity. repair any dry rot. replace subfloor and install new tile. reinstall existing vanity. install new toilet.Details
demo tile and subfloor in bathroom. remove existing toilet and vanity. repair any dry rot. replace subfloor and install new tile. reinstall existing vanity. install new toilet. | $13,000 |
| Feb 20, 2019 | Completed final sign-off Apr 2019 | 1231 York St | Handy Construction Team Inc | relocate extg laundry area to new closet location at hallway in same level of unit. non-structural work only few penetration for plmg work. to comply with nov #201918151.Details
relocate extg laundry area to new closet location at hallway in same level of unit. non-structural work only few penetration for plmg work. to comply with nov #201918151. | $2,500 |
| Dec 13, 2018 | Never finaled issued Dec 2018, no final | 1231 York St | street spaceDetails
street space | ||
| Mar 10, 2015 | Completed final sign-off Mar 2015 | 1231 York St | for administrative puropes to document the legal use and occupancy of this building as a 2 story building with 2 residential dwelling units. this is based on a site visit and review of city records including sandborn map, water dep, asseors building card and building permits. no work for this permitDetails
for administrative puropes to document the legal use and occupancy of this building as a 2 story building with 2 residential dwelling units. this is based on a site visit and review of city records including sandborn map, water dep, asseors building card and building permits. no work for this permit | ||
| May 15, 2012 | Completed final sign-off Oct 2012 | 1231 York St | Ming Fa Construction Inc | stair replace at back yard in rear, less than 50%.Details
stair replace at back yard in rear, less than 50%. | $750 |
| May 4, 2012 | Completed final sign-off Oct 2012 | 1231 York St | Ming Fa Construction Inc | siding at from all wal replace in kindDetails
siding at from all wal replace in kind | $2,500 |
| May 23, 2011 | Completed final sign-off Sep 2011 | 1231 York St | repair for stairs in backyard less than 50%; to comply with nov 201136401, doing work at rear stairs without a permit, repair in kindDetails
repair for stairs in backyard less than 50%; to comply with nov 201136401, doing work at rear stairs without a permit, repair in kind | $500 | |
| Apr 21, 2009 | Completed final sign-off May 2009 | 1231 York St | Voong's Roofing Company | reroofing.Details
reroofing. | $7,000 |
| Nov 27, 2007 | Never finaled issued Nov 2007, no final | 1231 York St | street space & sidewalk permit only.Details
street space & sidewalk permit only. | ||
| Mar 1, 2007 | Completed final sign-off Mar 2007 | 1231 York St | replace extg pr0perty line wdw, 4 total. one on south side 3x4. 3 on north side 2x5 each with in extg openings. no structural work or change in sizeDetails
replace extg pr0perty line wdw, 4 total. one on south side 3x4. 3 on north side 2x5 each with in extg openings. no structural work or change in size | $1,000 | |
| Oct 5, 2005 | Completed final sign-off Oct 2005 | 1231 York St | change 1 window at frontDetails
change 1 window at front | $1,000 | |
| Sep 6, 2005 | Completed final sign-off Oct 2005 | 1231 York St | comply with nov remove hazardous chimney and patch roof. fire place not in useDetails
comply with nov remove hazardous chimney and patch roof. fire place not in use | $500 | |
| Jul 29, 2005 | Completed final sign-off Aug 2005 | 1231 York St | replace 5 windows at rear. comply with nov# 200561547.Details
replace 5 windows at rear. comply with nov# 200561547. | $1,500 | |
| Jul 6, 2005 | Completed final sign-off Oct 2005 | 1231 York St | revised approved appl#200506225754 for 2 water heater.Details
revised approved appl#200506225754 for 2 water heater. | $500 | |
| Jun 22, 2005 | Completed final sign-off Oct 2005 | 1231 York St | move water heater from upper back stair landing to ground floor at north west side next to rear doorDetails
move water heater from upper back stair landing to ground floor at north west side next to rear door | $500 | |
| May 7, 2004 | Never finaled issued May 2004, no final | 1231 York St | address assignmentDetails
address assignment |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Ming Fa Construction Inc (2), G M Building And Construction Inc, Handy Construction Team Inc, Handyman Heroes Inc., Voong's Roofing Company
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.