Matthew Hum
- Listed as
- architect
- On San Francisco permits
- Dec 2022 to Dec 2022
1 permit since 2000 (architect on 1 permit): 1 completed.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 29, 2022 | Completed final sign-off Oct 2025 | 285 Mullen Av | Handy Construction Team Inc | add 95 sq ft bedroom to the rear of the home with the replacement of the (e)adjacent membrane roof.home is 925 sq ft,2 bed/1bath.no changes are proposed to the(e) basement or detached garage.addition will not be visible from the public right of way,no changes to front or overall bldg height.Details
add 95 sq ft bedroom to the rear of the home with the replacement of the (e)adjacent membrane roof.home is 925 sq ft,2 bed/1bath.no changes are proposed to the(e) basement or detached garage.addition will not be visible from the public right of way,no changes to front or overall bldg height. | $40,000 |