Block 1211, lot 018
1970 Fell St
- City’s use
- Multi-Family Residential
- Built
- 1924
- Stories
- 3
- Units
- 12
- Rooms
- 12 bathrooms
- Building
- 10,050 sq ft
- Lot
- 6,875 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
22 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 10, 2018 | Completed final sign-off Nov 2018 | 1970 Fell St | J M Construction Llc | revision to app#201709016694. move shear wall from line 2 to line 1.8. move moment frames from line c to line b and line d to line e. 2016 cebc appendix a-4Details
revision to app#201709016694. move shear wall from line 2 to line 1.8. move moment frames from line c to line b and line d to line e. 2016 cebc appendix a-4 | |
| Jun 27, 2018 | Never finaled issued Jun 2018, no final | 1970 Fell St | street spaceDetails
street space | ||
| Sep 22, 2017 | Completed final sign-off Jan 2018 | 1970 Fell St | Handy Construction Team Inc | unit # 8 replace kitchen cabinets in kind only, replace (e) bathtub for a new shower in bathroom ,replace sink and toilet in same location. install new led lightrs in living room & dining roomDetails
unit # 8 replace kitchen cabinets in kind only, replace (e) bathtub for a new shower in bathroom ,replace sink and toilet in same location. install new led lightrs in living room & dining room | $10,000 |
| Sep 6, 2017 | Expired or cancelled cancelled Jan 2026 | 1970 Fell St | turn (e) storage into laundry/mechanical room on 1st floorDetails
turn (e) storage into laundry/mechanical room on 1st floor | $3,000 | |
| Sep 1, 2017 | Completed final sign-off Nov 2018 | 1970 Fell St | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $40,000 | |
| Mar 30, 2016 | Completed final sign-off Jan 2017 | 1970 Fell St | Roberto De Leon | unit 3: (e) light, kitchen hood & bath fan do not change; remodel (1) kitchen (cabinets, tile floor same place; replace drywall bedroom, hallway and living room; exterior wall type x5/8".Details
unit 3: (e) light, kitchen hood & bath fan do not change; remodel (1) kitchen (cabinets, tile floor same place; replace drywall bedroom, hallway and living room; exterior wall type x5/8". | $22,000 |
| Dec 12, 2013 | Never finaled issued Dec 2013, no final | 1970 Fell St | street spaceDetails
street space | ||
| Nov 19, 2013 | Completed final sign-off Dec 2013 | 1970 Fell St | J & L Construction Roofing | comply with complaint# 201336101 laying #3 rebar and forms to pour concrete on back yard of property, 2000 sq.ft., less than 50% of the yard extension and install appropriate drainage.Details
comply with complaint# 201336101 laying #3 rebar and forms to pour concrete on back yard of property, 2000 sq.ft., less than 50% of the yard extension and install appropriate drainage. | $12,000 |
| Jan 16, 2013 | Completed final sign-off Apr 2013 | 1970 Fell St | J & L Construction Roofing | new hvac in unit #8Details
new hvac in unit #8 | $3,500 |
| May 12, 2011 | Never finaled issued May 2011, no final | 1970 Fell St | #3- to obtain final inspection for work approved under pa#200907011797. all work is complete.Details
#3- to obtain final inspection for work approved under pa#200907011797. all work is complete. | ||
| May 12, 2011 | Completed final sign-off Jun 2011 | 1970 Fell St | #6- replace existing same layout with new countertops & cabinets in kitchen, replace appliances, tile enclosure on walls, bathtub, new fixtures. kitchen and bath remodel.Details
#6- replace existing same layout with new countertops & cabinets in kitchen, replace appliances, tile enclosure on walls, bathtub, new fixtures. kitchen and bath remodel. | $5,000 | |
| May 12, 2011 | Completed final sign-off Jun 2011 | 1970 Fell St | to obtain final inspection for work approved under pa#200904166365. all work is complete.Details
to obtain final inspection for work approved under pa#200904166365. all work is complete. | ||
| May 12, 2011 | Completed final sign-off Nov 2012 | 1970 Fell St | to obtain final inspection for work approved under pa#200904297294. all work is complete.Details
to obtain final inspection for work approved under pa#200904297294. all work is complete. | ||
| Oct 23, 2009 | Completed final sign-off Jan 2010 | 1970 Fell St | Handy Construction Team Inc | unit #7: kitchen & bathroom remodeling, remove base cabinets and replace them, install new sink at kitchen, remove 3 surrounding walls aroud bath tub and remove tile, install new cemet boards and re-tile area, relocate sub-panel, install new gfi, 30 amps and 4 circuits, no structural work to be doneDetails
unit #7: kitchen & bathroom remodeling, remove base cabinets and replace them, install new sink at kitchen, remove 3 surrounding walls aroud bath tub and remove tile, install new cemet boards and re-tile area, relocate sub-panel, install new gfi, 30 amps and 4 circuits, no structural work to be done | $9,500 |
| Jul 1, 2009 | Never finaled issued Jul 2009, no final | 1970 Fell St | Handy Construction Team Inc | kitchen & bathrm remodel-remove base cabinet & install new one, install new sink in kitchen, remofe tile from surrounding walls around bath tub area. install new hardibacker & tile, grout & seal it. relocate sub panel 30 amps & 4 curcuits. replace (e) central unit heater for a new one. no structuralDetails
kitchen & bathrm remodel-remove base cabinet & install new one, install new sink in kitchen, remofe tile from surrounding walls around bath tub area. install new hardibacker & tile, grout & seal it. relocate sub panel 30 amps & 4 curcuits. replace (e) central unit heater for a new one. no structural | $6,500 |
| Jun 15, 2009 | Completed final sign-off Jul 2009 | 1970 Fell St | Handy Construction Team Inc | work on unit#5 only. kitchen & bath remodeling. remove base cabinets and replace them. install new sink at kitchen. remove threee surounding walls around bathtub area and remove tile. install new habibacker and retile and grout and seal it. install new gfi and relocate subpanel. 30 amps 4 circuitsDetails
work on unit#5 only. kitchen & bath remodeling. remove base cabinets and replace them. install new sink at kitchen. remove threee surounding walls around bathtub area and remove tile. install new habibacker and retile and grout and seal it. install new gfi and relocate subpanel. 30 amps 4 circuits | $5,800 |
| Apr 29, 2009 | Expired or cancelled expired Nov 2012 | 1970 Fell St | comply with/nov3200900504. 3200900502 and#200998742.. replace kitchen cabinets & countertops in unit#4,#5 . replace drywall, tile & flooring in bathrooms of unit#4 & #12.Details
comply with/nov3200900504. 3200900502 and#200998742.. replace kitchen cabinets & countertops in unit#4,#5 . replace drywall, tile & flooring in bathrooms of unit#4 & #12. | $35,000 | |
| Apr 16, 2009 | Completed final sign-off Jun 2011 | 1970 Fell St | correct nov #200996640 item #2, install 1 handrail for each stairway in the backyard. total of 2. his/20090066.Details
correct nov #200996640 item #2, install 1 handrail for each stairway in the backyard. total of 2. his/20090066. | $100 | |
| Jan 27, 2009 | Completed final sign-off Jun 2009 | 1970 Fell St | Handy Construction Team Inc | work @ apt# 2 only. remove base cabinets & replace with new one. install new sink, at kitchen; bathroom area remove 3 surrounding walls around shower area & install new 4 x 4 tile standard. install new hardibacker & change (e) shower values. no structural work. no lighting work at all.Details
work @ apt# 2 only. remove base cabinets & replace with new one. install new sink, at kitchen; bathroom area remove 3 surrounding walls around shower area & install new 4 x 4 tile standard. install new hardibacker & change (e) shower values. no structural work. no lighting work at all. | $5,800 |
| Aug 18, 2008 | Completed final sign-off Nov 2008 | 1970 Fell St | Handy Construction Team Inc | partial remodel in bathroom and kitchen. remove (3) surronding tile wallsand replace w/ new material. place bathtub in bath. replace 3 base cabinet in kitchen. replace sink and install 2 new icrcuits for dishwasher and garbage disposal, install wall heater between rooms.Details
partial remodel in bathroom and kitchen. remove (3) surronding tile wallsand replace w/ new material. place bathtub in bath. replace 3 base cabinet in kitchen. replace sink and install 2 new icrcuits for dishwasher and garbage disposal, install wall heater between rooms. | $6,000 |
| Mar 4, 2008 | Never finaled issued Mar 2008, no final | 1970 Fell St | street space & sidewalk permit only.Details
street space & sidewalk permit only. | ||
| Dec 7, 2007 | Completed final sign-off Jan 2008 | 1970 Fell St | unit 9: to comply with nov #200700221, change 84" cabinets with new dishwasher. replace damaged tiles in bathroom.Details
unit 9: to comply with nov #200700221, change 84" cabinets with new dishwasher. replace damaged tiles in bathroom. | $4,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Handy Construction Team Inc (6), J & L Construction Roofing (2), J M Construction Llc, Roberto De Leon
- Engineers
- Jeff Tsz Wai Chow
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.