Luis Robles
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Robles & Assocciates
- Based in
- Pacifica
- On San Francisco permits
- May 2000 to Jun 2026
204 permits since 2000 (architect on 191 permits, authorized agent-others on 9 permits, engineer on 3 permits, designer on 1 permit): 129 completed, 8 in progress, 24 never finaled, 43 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 204.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 4, 2026 | In progress filed Jun 2026, not yet issued | 38 Chenery St | Hong's General Construction Inc | revision to pa# 202101192880, to use state adu program instead of local program, to remove the fire sprinklers as no longer required under adu r3, keep 2ft existing nonconforming rear structure, remove side door into exterior hallway. no change to building envelope.Details
revision to pa# 202101192880, to use state adu program instead of local program, to remove the fire sprinklers as no longer required under adu r3, keep 2ft existing nonconforming rear structure, remove side door into exterior hallway. no change to building envelope. | $1,000 |
| Feb 13, 2026 | In progress filed Feb 2026, not yet issued | 1926 Jefferson St | revision to permit pa #202506068160. to new deck and new 1 hour wall at existing stairs.Details
revision to permit pa #202506068160. to new deck and new 1 hour wall at existing stairs. | ||
| Dec 4, 2025 | Completed final sign-off May 2026 | 1670 Page St | K And M Custom Homes Inc, Dcs Plumbing Llc | revision to 202203311315: change dining area to bedroom #2Details
revision to 202203311315: change dining area to bedroom #2 | |
| Aug 8, 2025 | In progress filed Aug 2025, not yet issued | 3516 Sacramento St | revision to pa# 202108025569: replace ladder with a drop ladder from 2nd fl to ground flDetails
revision to pa# 202108025569: replace ladder with a drop ladder from 2nd fl to ground fl | ||
| Jul 31, 2025 | Completed final sign-off Jul 2026 | 158 Detroit St | basement: convert existing bedroom #4 into 2 new bathrooms and exercise room.Details
basement: convert existing bedroom #4 into 2 new bathrooms and exercise room. | $50,000 | |
| Jun 20, 2025 | In progress filed Jun 2025, not yet issued | 1926 Jefferson St | privacy walls.Details
privacy walls. | $5,000 | |
| Jun 6, 2025 | In progress issued Jun 2025 | 1926 Jefferson St | (n) deck and (n) 1 hr wall at (e) stairsDetails
(n) deck and (n) 1 hr wall at (e) stairs | $35,000 | |
| Mar 21, 2025 | Completed final sign-off Feb 2026 | 378 Vernon St | J B Const & Maint Co | voluntary seismic strengthening to lower level; remodel family room, add new bathroom at 1st floor, remodel kitchen at 2nd floor.Details
voluntary seismic strengthening to lower level; remodel family room, add new bathroom at 1st floor, remodel kitchen at 2nd floor. | $110,000 |
| Mar 20, 2025 | Completed final sign-off Jul 2025 | 5041 Geary Bl | F C Company | propose to stranghten the existing front entrance corner entrance door approved under pa 202312223018Details
propose to stranghten the existing front entrance corner entrance door approved under pa 202312223018 | $1,000 |
| Feb 21, 2025 | In progress issued Mar 2025 | 3516 Sacramento St | this permit is for m.e.p. under pa# 2021-0802-5569Details
this permit is for m.e.p. under pa# 2021-0802-5569 | ||
| Jan 14, 2025 | Expired or cancelled cancelled Jan 2025 | 1926 Jefferson St | roof deck over 4th floorDetails
roof deck over 4th floor | $15,000 | |
| Nov 21, 2024 | Expired or cancelled cancelled Jan 2025 | 137 Chilton Av | demo delapitated unpermitted in-law on the ground floor and rebuild a new adu unit to included 1-bedroom, kitchen, bathroom, dining/living space. remodel existing kitchen and bathroom on the main house. remove existing deck on the 2nd flr and rebuild a sunroom.Details
demo delapitated unpermitted in-law on the ground floor and rebuild a new adu unit to included 1-bedroom, kitchen, bathroom, dining/living space. remodel existing kitchen and bathroom on the main house. remove existing deck on the 2nd flr and rebuild a sunroom. | $250,000 | |
| Jan 25, 2024 | Completed final sign-off Feb 2024 | 1670 Page St | clarified attic as storage only - work under this permit to install 1-hr door at second level at bottom of stairs from attic level. reference permits# 202107013553 and 202102164709.Details
clarified attic as storage only - work under this permit to install 1-hr door at second level at bottom of stairs from attic level. reference permits# 202107013553 and 202102164709. | ||
| Sep 20, 2023 | Never finaled filed Sep 2023, never issued | 38 Chenery St | legalize interior stair (interior front part of building) to connect 1st fl to 2nd fl per nov# 202309946. all other work at 1st fl is under adu pa# 202101192880 (rear of building). no change of (e) building envelope.Details
legalize interior stair (interior front part of building) to connect 1st fl to 2nd fl per nov# 202309946. all other work at 1st fl is under adu pa# 202101192880 (rear of building). no change of (e) building envelope. | $8,600 | |
| Jul 28, 2023 | Expired or cancelled withdrawn Sep 2026 | 1134 Geneva Av | add 1 studio adu on (e) 1/f with 1 full bathroom & 1 kitchen. see related pa 202107295371.Details
add 1 studio adu on (e) 1/f with 1 full bathroom & 1 kitchen. see related pa 202107295371. | $60,000 | |
| Jul 5, 2023 | Completed final sign-off Sep 2023 | 680 Valencia St | proposing a new food prep area, to serve pastries, coffee & ice cream. adding hand sink & liquid disposal sink. no alteration to (e) exits.Details
proposing a new food prep area, to serve pastries, coffee & ice cream. adding hand sink & liquid disposal sink. no alteration to (e) exits. | $2,000 | |
| Apr 14, 2023 | Completed final sign-off Mar 2024 | 4465 Mission St | Ac And Company | tenant improvement new both gender ada bathroom. (abe under separate permit #202212299424, ab3202209304867).Details
tenant improvement new both gender ada bathroom. (abe under separate permit #202212299424, ab3202209304867). | $15,000 |
| Apr 5, 2023 | Completed final sign-off Jun 2025 | 222 Webster St | legalize an existing unwarranted gr floor unit ( soft story already completed and finaled)Details
legalize an existing unwarranted gr floor unit ( soft story already completed and finaled) | $50,000 | |
| Mar 1, 2023 | Completed final sign-off Jun 2024 | 9 Mayfair Dr | Hong's General Construction Inc | interior remodel on 2nd and 3rd floor. remodel extg 2 kitchens and extg 2 bathrooms. adding 2 new bathrooms. no work on 1st floor. no change of front and bldg envelope. remove 2nd fl fireplaceDetails
interior remodel on 2nd and 3rd floor. remodel extg 2 kitchens and extg 2 bathrooms. adding 2 new bathrooms. no work on 1st floor. no change of front and bldg envelope. remove 2nd fl fireplace | $87,000 |
| Jan 27, 2023 | Completed final sign-off Apr 2024 | 1444 Broadway | 4-Mac Construction | rear building: replace in-kind existing dryrotted handrails, guardrails and bring to current building code as required. (not visible from street)Details
rear building: replace in-kind existing dryrotted handrails, guardrails and bring to current building code as required. (not visible from street) | $4,500 |
| Jan 20, 2023 | Completed final sign-off Apr 2024 | 1444 Broadway | 4-Mac Construction | converting unit#3 at 1444 broadway av. becoming unit#3 & unit #4 1444 broadwayDetails
converting unit#3 at 1444 broadway av. becoming unit#3 & unit #4 1444 broadway | $35,000 |
| Sep 28, 2022 | Completed final sign-off Dec 2022 | 2323 Noriega St | Mazzoni Construction Inc | relocate (e) health service/accupuncture from 2000 noriega street to 2323 noriega street, suite 203. (e) facility has ada common area that complies, v.i.f. existing hvac system remain. no massage.Details
relocate (e) health service/accupuncture from 2000 noriega street to 2323 noriega street, suite 203. (e) facility has ada common area that complies, v.i.f. existing hvac system remain. no massage. | $14,000 |
| Jul 18, 2022 | Never finaled issued Aug 2022, no final | 2632 Moraga St | D S Management Inc Dba Metrocon Builders | rev to pa 201808167589 to address a minor change of wall next to the garage door.Details
rev to pa 201808167589 to address a minor change of wall next to the garage door. | $1,000 |
| Mar 25, 2022 | Completed final sign-off Feb 2023 | 7 Mayfair Dr | Sunny Ca International Inc | interior remodel @ 1st floor only. remove wall between kitcehn and sleeping area to create open style write no work at second and third floors. no change to exterior.Details
interior remodel @ 1st floor only. remove wall between kitcehn and sleeping area to create open style write no work at second and third floors. no change to exterior. | $28,000 |
| Nov 16, 2021 | Completed final sign-off Oct 2023 | 511 Lakeview Av | Hong's General Construction Inc | interior change of approaved plan pa 2016-1221-5539. the approved plans changed to 13" smaller. see drawingsDetails
interior change of approaved plan pa 2016-1221-5539. the approved plans changed to 13" smaller. see drawings | $6,000 |
| Oct 28, 2021 | Completed final sign-off Nov 2021 | 1233 Union St | retrofit in kind 8 windows at rear and lightwells at 1235 union st. non visual, no structural. not visible from street. same size same location. u factor <.30Details
retrofit in kind 8 windows at rear and lightwells at 1235 union st. non visual, no structural. not visible from street. same size same location. u factor <.30 | $3,500 | |
| Sep 13, 2021 | Completed final sign-off Oct 2021 | 1926 34th Av | revision to pa# 201708104511. revised approved plans for final. sheet has changed as attached in plans. changed baths location & kitchen area. no change of building envelope.Details
revision to pa# 201708104511. revised approved plans for final. sheet has changed as attached in plans. changed baths location & kitchen area. no change of building envelope. | ||
| Aug 20, 2021 | Completed final sign-off Apr 2022 | 173 Kensington Wy | install fence and gates for parking area at rear yard - must complete bpa 201602018464Details
install fence and gates for parking area at rear yard - must complete bpa 201602018464 | $5,200 | |
| Aug 16, 2021 | Completed final sign-off Dec 2021 | 15 Leland Av | remove and replace in-kind (e) stairs leading to the (e) deck from units (1 & 2).Details
remove and replace in-kind (e) stairs leading to the (e) deck from units (1 & 2). | $5,000 | |
| Aug 2, 2021 | In progress issued Dec 2023 | 3516 Sacramento St | revision to bpa# 200006142628. response to planning enforcement 2020-001795enf. correct proposed building height to comply with required zoning height limit. remove approved ground level garage & expand retail space. mep deferredDetails
revision to bpa# 200006142628. response to planning enforcement 2020-001795enf. correct proposed building height to comply with required zoning height limit. remove approved ground level garage & expand retail space. mep deferred | ||
| Jul 29, 2021 | Never finaled filed Jul 2021, never issued | 1134 Geneva Av | revised scope: add one dwelling unit at front of ground floor. adu at rear of ground floor not part of this permit. see related pa 202307283290Details
revised scope: add one dwelling unit at front of ground floor. adu at rear of ground floor not part of this permit. see related pa 202307283290 | $120,000 | |
| Jun 7, 2021 | Completed final sign-off Oct 2021 | 1371 44th Av | Hong's General Construction Inc | priovide/to install plywood around the interior house perimeter at 1st & 2nd fl. all drawings are reference from ap #202012070381.Details
priovide/to install plywood around the interior house perimeter at 1st & 2nd fl. all drawings are reference from ap #202012070381. | $100,000 |
| Apr 21, 2021 | Never finaled issued Aug 2023, no final | 615 Sargent St | interrior remodel: add new bathroom at 1st fl. 2nd fl: remove wall to create open kitchen bewteen dinning and living rm, upgrade (e) kitchen. no change of the (e) evelope.Details
interrior remodel: add new bathroom at 1st fl. 2nd fl: remove wall to create open kitchen bewteen dinning and living rm, upgrade (e) kitchen. no change of the (e) evelope. | $32,000 | |
| Apr 20, 2021 | Never finaled issued Jun 2021, no final | 10 Encline Ct | Three Brothers Construction | revise approved plan #202009244929 sheet a-4 3rd floor to keep existing master suite as is.Details
revise approved plan #202009244929 sheet a-4 3rd floor to keep existing master suite as is. | |
| Feb 8, 2021 | Expired or cancelled withdrawn May 2026 | 88 Merlin St | to comply with nov# 202015176. remove bathroom & kitchen area that was built without permits. propose for/back to manufacturing/commercial space. upgrade existing electrical 200 amp to 600 amp.Details
to comply with nov# 202015176. remove bathroom & kitchen area that was built without permits. propose for/back to manufacturing/commercial space. upgrade existing electrical 200 amp to 600 amp. | $4,800 | |
| Jan 19, 2021 | In progress issued Dec 2025 | 38 Chenery St | Hong's General Construction Inc | adu per planning code sec 207.1 to legalize the udu at the ground floor including kitchen, bathrooms, bedrooms, and a 489 sqft rear addition, and reconfiguring the interior stair to separate the units. and per planner request to legalize second floor rear addition not addressed under 202009234802.Details
adu per planning code sec 207.1 to legalize the udu at the ground floor including kitchen, bathrooms, bedrooms, and a 489 sqft rear addition, and reconfiguring the interior stair to separate the units. and per planner request to legalize second floor rear addition not addressed under 202009234802. | $138,000 |
| Dec 7, 2020 | Completed final sign-off Oct 2021 | 1371 44th Av | Hong's General Construction Inc | comply with nov 202064487. interior remodel: upgrade kitchen and bath at (e) location. replace the stairs from 2-f to (e) habitable attic. new interior stairs to 1-f. excavate garage for headroom and bathroom.Details
comply with nov 202064487. interior remodel: upgrade kitchen and bath at (e) location. replace the stairs from 2-f to (e) habitable attic. new interior stairs to 1-f. excavate garage for headroom and bathroom. | $100,000 |
| Nov 30, 2020 | Completed final sign-off May 2026 | 1715 22nd St | Vidal Alfredo Construction | remodel "soft story" voluntary and alteration at first floor.Details
remodel "soft story" voluntary and alteration at first floor. | $25,000 |
| Nov 2, 2020 | Completed final sign-off Nov 2021 | 1235 Union St | (n) bedroom, (n) bathroom, (n) laundry & replace (e) furnaceDetails
(n) bedroom, (n) bathroom, (n) laundry & replace (e) furnace | $15,000 | |
| Sep 23, 2020 | Completed final sign-off May 2023 | 38 Chenery St | Hong's General Construction Inc | for 2nd floor, relocate & update (e) kitchen and bath with new electrical and plumbing, add 1 (n) bath. for 3rd floor, add new unit, reconfiguring interior layout. interior remodel only with no change to exterior facade. 1st floor adu will be submitted separately.Details
for 2nd floor, relocate & update (e) kitchen and bath with new electrical and plumbing, add 1 (n) bath. for 3rd floor, add new unit, reconfiguring interior layout. interior remodel only with no change to exterior facade. 1st floor adu will be submitted separately. | $120,000 |
| Feb 27, 2020 | Completed final sign-off Oct 2022 | 1233 Union St | rooms down at basement, 1/2 bath, laundry, bedroom, family room and sleep alcove. new stairs. basement includes 1 bedroom, family roo, 1/2 bath, sleep alcove. garage area: new entry, stair to basement, exercise rm with full bathDetails
rooms down at basement, 1/2 bath, laundry, bedroom, family room and sleep alcove. new stairs. basement includes 1 bedroom, family roo, 1/2 bath, sleep alcove. garage area: new entry, stair to basement, exercise rm with full bath | $25,000 | |
| Jan 8, 2020 | Never finaled filed Jan 2020, never issued | 1001 Jamestown Av | to clear violations #201986541, 201986491, and 201986491. new retaining wall at back of property. legalize front facade of extg building. legalize all front windows that were enlarged.Details
to clear violations #201986541, 201986491, and 201986491. new retaining wall at back of property. legalize front facade of extg building. legalize all front windows that were enlarged. | $25,000 | |
| Dec 13, 2019 | Never finaled issued Dec 2019, no final | 1233 Union St | voluntary structural upgrade at basement. additional work to pa 201911157445Details
voluntary structural upgrade at basement. additional work to pa 201911157445 | $15,000 | |
| Dec 3, 2019 | Completed final sign-off Jul 2020 | 756 Potrero Av | Taico Builder Inc | propose new stair access from garage floor to 2nd floor. 2nd fl - remove wall to create open kitchen connect to dining area. no change of (e) bldg envelop and facadeDetails
propose new stair access from garage floor to 2nd floor. 2nd fl - remove wall to create open kitchen connect to dining area. no change of (e) bldg envelop and facade | $52,000 |
| Nov 15, 2019 | Completed final sign-off Jul 2020 | 1233 Union St | unit 1233: add spiral stairs & roof deckDetails
unit 1233: add spiral stairs & roof deck | $15,000 | |
| Nov 8, 2019 | Completed final sign-off Jul 2020 | 1233 Union St | remodel unit 1233 union st (e) bath, (e) kitchen, (e) bedrooms redmoel and add (n) bath & (n) laundry & (n) bedroomDetails
remodel unit 1233 union st (e) bath, (e) kitchen, (e) bedrooms redmoel and add (n) bath & (n) laundry & (n) bedroom | $55,000 | |
| Sep 26, 2019 | Never finaled issued Nov 2019, no final | 219 King St | J C General Construction | revise (e) permit application #201312315439. to modify existing approved restaurant floor layout to create new working station for drinks.Details
revise (e) permit application #201312315439. to modify existing approved restaurant floor layout to create new working station for drinks. | $34,000 |
| Sep 13, 2019 | Expired or cancelled cancelled Jan 2026 | 1726 Oakdale Av | remodel 1726 & 1728 oakdale ave: 2 kitchen, 2 full bathrooms, 2 half baths & 6 bedrooms at 1/f and 2/fDetails
remodel 1726 & 1728 oakdale ave: 2 kitchen, 2 full bathrooms, 2 half baths & 6 bedrooms at 1/f and 2/f | $90,000 | |
| Sep 13, 2019 | Expired or cancelled cancelled Jan 2026 | 1726 Oakdale Av | voluntary soft story structural upgrade @ basement. no exterior work proposed.Details
voluntary soft story structural upgrade @ basement. no exterior work proposed. | $19,000 | |
| Jul 25, 2019 | Expired or cancelled withdrawn Jan 2023 | 208 Girard St | horizontal & vertical addition. propose to modify approved plans #201304094098 to create 2 bedrooms and bathroom as per plan.Details
horizontal & vertical addition. propose to modify approved plans #201304094098 to create 2 bedrooms and bathroom as per plan. | $1,000 | |
| May 30, 2019 | Expired or cancelled cancelled Jul 2024 | 1690 Hayes St | site permit for change of use from retail to restaurant.**maher n/a**Details
site permit for change of use from retail to restaurant.**maher n/a** | ||
| Apr 30, 2019 | Never finaled issued Jun 2019, no final | 653 Commercial St | as built basement bar floor for final inspectionsDetails
as built basement bar floor for final inspections | ||
| Mar 1, 2019 | Never finaled issued Mar 2019, no final | 1 Majestic Av | to clear violations:20183687, 201582622,200119172,201538134,201648022,201887742,201261907,201336341,201917878,201147686. remodel all house, bathrooms, laundry room,kitchen, upgrade wiring, upgrade all plbmg, upgrade all windows, new roofing covering.Details
to clear violations:20183687, 201582622,200119172,201538134,201648022,201887742,201261907,201336341,201917878,201147686. remodel all house, bathrooms, laundry room,kitchen, upgrade wiring, upgrade all plbmg, upgrade all windows, new roofing covering. | $38,000 | |
| Dec 19, 2018 | Completed final sign-off Jul 2019 | 188 28th St | revision to pa #201804237115. bathroom location and kitchen layout.Details
revision to pa #201804237115. bathroom location and kitchen layout. | ||
| Nov 16, 2018 | Expired or cancelled cancelled Jan 2026 | 240 16th Av | convert ground floor into 1-bed, 1-bath, second unit. no expansion of envelope of building. sprinkler the first floor.Details
convert ground floor into 1-bed, 1-bath, second unit. no expansion of envelope of building. sprinkler the first floor. | $105,000 | |
| Oct 26, 2018 | Completed final sign-off Jan 2023 | 442 Hearst Av | Rosconn Construction | two stroy rear addition to (e) bldg, to add additional bedrooms.Details
two stroy rear addition to (e) bldg, to add additional bedrooms. | $150,000 |
| Sep 13, 2018 | Never finaled issued Sep 2020, no final | 107 Cypress St | Jerald Construction | new unit at existing garage & existing storage. 2 bedrooms & kitchen, living, dining & bath.Details
new unit at existing garage & existing storage. 2 bedrooms & kitchen, living, dining & bath. | $62,000 |
| Sep 11, 2018 | Completed final sign-off Aug 2023 | 349 Pierce St | Beale Builders & Construction | commercial soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential pa #201809119783.Details
commercial soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential pa #201809119783. | $20,000 |
| Sep 11, 2018 | Completed final sign-off Aug 2023 | 349 Pierce St | Beale Builders & Construction | residential soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial pa #201809119786.Details
residential soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial pa #201809119786. | $45,000 |
| Jun 18, 2018 | Never finaled issued Dec 2022, no final | 1911 20th St | Shamrock Engineering Concrete, Cht Properties Development | 2-story vertical addition; additon of 1 unit and an 1 adu; sprinkler nfpa13 throughoutDetails
2-story vertical addition; additon of 1 unit and an 1 adu; sprinkler nfpa13 throughout | $500,000 |
| May 11, 2018 | Expired or cancelled cancelled Jan 2021 | 1461 Kansas St | structural strengthening voluntary foundation and shearwallDetails
structural strengthening voluntary foundation and shearwall | $6,500 | |
| Mar 21, 2018 | Completed final sign-off Mar 2021 | 1000 Cortland Av | change of use from hair salon to a full service restaurant - not formula retail. interior walls, kitchen equipment, sushi counter and fully complliant ada restroom construction.Details
change of use from hair salon to a full service restaurant - not formula retail. interior walls, kitchen equipment, sushi counter and fully complliant ada restroom construction. | $100,000 | |
| Dec 4, 2017 | Expired or cancelled withdrawn Jan 2018 | 1 Putnam St | 190 sq.ft. new addition @ 2nd floor. complete interior remodeling. to clear all outstanding violation# 201579415, 201497721, 201706233 & 200000069.Details
190 sq.ft. new addition @ 2nd floor. complete interior remodeling. to clear all outstanding violation# 201579415, 201497721, 201706233 & 200000069. | $28,000 | |
| Sep 25, 2017 | Completed final sign-off Oct 2017 | 310 Duncan St | revision to pa#201708296341 & 2016-04-08-4319 to address dcp comments. to verify size (square footage) of dwelling units. [relocated of unit #2 (310a duncan st) to basement level and provided 1-hr walls at stairs and wine/storage area for unit #1 (310 duncan street)].Details
revision to pa#201708296341 & 2016-04-08-4319 to address dcp comments. to verify size (square footage) of dwelling units. [relocated of unit #2 (310a duncan st) to basement level and provided 1-hr walls at stairs and wine/storage area for unit #1 (310 duncan street)]. | $2,000 | |
| Sep 1, 2017 | Completed final sign-off Dec 2018 | 1682 Kirkwood Av | convert (e) basement into living space to include one bedroom, one bath, one kitchen, and living room. new mini split furnace, new 100 amp panel. (680 sq ft)Details
convert (e) basement into living space to include one bedroom, one bath, one kitchen, and living room. new mini split furnace, new 100 amp panel. (680 sq ft) | $40,000 | |
| Aug 29, 2017 | Completed final sign-off Oct 2017 | 310 Duncan St | revision to pa #201604084319; to comply with nov #201563441 & 201787101. add non-structural wall and remove 4' of non structural wall and increasing the sq.ft. of unit #2.Details
revision to pa #201604084319; to comply with nov #201563441 & 201787101. add non-structural wall and remove 4' of non structural wall and increasing the sq.ft. of unit #2. | $5,000 | |
| Jun 1, 2017 | Expired or cancelled withdrawn Mar 2018 | 212 Putnam St | to comply with nov#201636491. new 1,115 sqft additin, 2 new bedroom, new 2 1/2 baths. (2 new floors).Details
to comply with nov#201636491. new 1,115 sqft additin, 2 new bedroom, new 2 1/2 baths. (2 new floors). | $125,000 | |
| Dec 30, 2016 | Never finaled filed Dec 2016, never issued | 3327 Quintara St | (n) single family res'd- 4 bedrooms, 3 baths, living, dining, kitchen, family room, media room, wine cellar & garage.Details
(n) single family res'd- 4 bedrooms, 3 baths, living, dining, kitchen, family room, media room, wine cellar & garage. | $380,000 | |
| Dec 2, 2016 | Completed final sign-off Apr 2018 | 579 39th Av | Cabrillo Construction Co. Inc. | enclose lightwell and reconfigure stairs from 2nd floor to 3rd floor per app#201307151829Details
enclose lightwell and reconfigure stairs from 2nd floor to 3rd floor per app#201307151829 | $575 |
| Nov 4, 2016 | Completed final sign-off Aug 2017 | 1200 Arguello Bl | rebuild existing rear stairs and decks in kindDetails
rebuild existing rear stairs and decks in kind | $12,500 | |
| Oct 11, 2016 | Never finaled filed Oct 2016, never issued | 835 Wisconsin St | remodel entire house. install garage, add 3rd & penthouse floor. raise bldg 3'o" vertically. remodel (e) kitchen & (e) bathroom & add 4 (n) bathroom & 1 (n) 1/2 bath.Details
remodel entire house. install garage, add 3rd & penthouse floor. raise bldg 3'o" vertically. remodel (e) kitchen & (e) bathroom & add 4 (n) bathroom & 1 (n) 1/2 bath. | $525,000 | |
| Sep 1, 2016 | Expired or cancelled cancelled Jul 2018 | 240 16th Av | adding horizational addition for (n) secondary unit on ground floor, including kitchen, bathroom, (2) bedrooms, living and dining spaces. work include emp and (n) wooden roof deck on 2nd floor.Details
adding horizational addition for (n) secondary unit on ground floor, including kitchen, bathroom, (2) bedrooms, living and dining spaces. work include emp and (n) wooden roof deck on 2nd floor. | $56,000 | |
| Aug 5, 2016 | Completed final sign-off Mar 2017 | 147 Stillman St | revision to pa #201606240855 - increase in scope of work to add additional bathrooms to each unit & non load bearing wall modifications. n/a maher ordinanceDetails
revision to pa #201606240855 - increase in scope of work to add additional bathrooms to each unit & non load bearing wall modifications. n/a maher ordinance | $75,000 | |
| Apr 22, 2016 | Completed final sign-off Aug 2017 | 1200 Arguello Bl | remodel (e) kitchens 3 each, (3)baths 3 full & 3- 1/2 baths & existing laundry 3 each. no new walls.Details
remodel (e) kitchens 3 each, (3)baths 3 full & 3- 1/2 baths & existing laundry 3 each. no new walls. | $85,000 | |
| Apr 8, 2016 | Completed final sign-off Jan 2019 | 310 Duncan St | to comply with nov 201563441,to document that the building is a 2-unit residential bldg based on dbi & assessors records pa201410179216 was issued & it reflected the bldg incorrectly as a single family unit.this permit will correct the error.the permit will also show the proposed layout of bothDetails
to comply with nov 201563441,to document that the building is a 2-unit residential bldg based on dbi & assessors records pa201410179216 was issued & it reflected the bldg incorrectly as a single family unit.this permit will correct the error.the permit will also show the proposed layout of both | $10,162 | |
| Jan 29, 2016 | Expired or cancelled expired May 2019 | 1855 Oak St | Beale Builders & Construction | install (n) windows @ (e) laundry window locations.Details
install (n) windows @ (e) laundry window locations. | $4,500 |
| Jan 21, 2016 | Completed final sign-off Apr 2017 | 1399 18th St | change of use (m) to (b). install foodservice equipment for cafe use. remodel restroom to be ada accessible. m.e.p under seperate permit.Details
change of use (m) to (b). install foodservice equipment for cafe use. remodel restroom to be ada accessible. m.e.p under seperate permit. | $45,000 | |
| Dec 7, 2015 | Completed final sign-off Feb 2016 | 650 02nd St | Grove Construction | remodel bath at unit # 603.Details
remodel bath at unit # 603. | $8,500 |
| Nov 25, 2015 | Completed final sign-off Jan 2018 | 1258 20th Av | Koneya Construction | change of use from retail to childcare. extend childcare use into unit #1260.Details
change of use from retail to childcare. extend childcare use into unit #1260. | $1,500 |
| Nov 5, 2015 | Completed final sign-off Nov 2015 | 46 Sanchez St | revision to pa #201508214950 - living room to bedroom & bedroom to living room & change bathrooms layout.Details
revision to pa #201508214950 - living room to bedroom & bedroom to living room & change bathrooms layout. | ||
| Oct 20, 2015 | Expired or cancelled withdrawn Apr 2017 | 310 Duncan St | revision to ref pa 2014 1017 9216" change to entry doors & window at front designDetails
revision to ref pa 2014 1017 9216" change to entry doors & window at front design | ||
| Aug 21, 2015 | Completed final sign-off Nov 2015 | 46 Sanchez St | remodel (e) kitchen & (e) bath convert (e) bedroom into (n) dining & (e) dining into (n) family rm.Details
remodel (e) kitchen & (e) bath convert (e) bedroom into (n) dining & (e) dining into (n) family rm. | $32,000 | |
| Aug 21, 2015 | Expired or cancelled withdrawn Nov 2015 | 46 Sanchez St | (n) windows @ property line @ living room & dining room. to be fire-rated per ab-009Details
(n) windows @ property line @ living room & dining room. to be fire-rated per ab-009 | $1,800 | |
| Aug 5, 2015 | Never finaled issued Jan 2016, no final | 808 Geary St | Loi Electric Company | administrative permit: only for sffd inspector alfred hom to establish occupancy count for (e) restaurant. construct one-hour rated exit passage way.Details
administrative permit: only for sffd inspector alfred hom to establish occupancy count for (e) restaurant. construct one-hour rated exit passage way. | |
| Jul 3, 2015 | Completed final sign-off May 2019 | 1855 Oak St | Beale Builders & Construction | add (n) 1-bedroom apartment under ord 30-15.Details
add (n) 1-bedroom apartment under ord 30-15. | $55,000 |
| Jan 23, 2015 | Completed final sign-off Mar 2015 | 3985 17th St | add to pa 201401136090 for title 24 lighting calculations as requested by electrical inspector for final sign off.Details
add to pa 201401136090 for title 24 lighting calculations as requested by electrical inspector for final sign off. | $2,500 | |
| Nov 26, 2014 | Never finaled issued Feb 2020, no final | 1322 Wawona St | add (n) garage enlarge (e) kitchen (e) living room (e) bedrooms & (n) bath, (n) deck & (n) dormer.Details
add (n) garage enlarge (e) kitchen (e) living room (e) bedrooms & (n) bath, (n) deck & (n) dormer. | $65,000 | |
| Nov 10, 2014 | Completed final sign-off Feb 2021 | 571 Noe St | Spiers Construction Co. | vertical addition: 2-bedroom, 2-baths, 2-decks & (n) 2nd floor.Details
vertical addition: 2-bedroom, 2-baths, 2-decks & (n) 2nd floor. | $85,000 |
| Oct 28, 2014 | Never finaled issued Mar 2015, no final | 3242 Scott St | relocate wall at wc #1 to obtain proper ada clearances and work under food inspection report dated 6/3/14. location i.d. 78940 n/a for maherDetails
relocate wall at wc #1 to obtain proper ada clearances and work under food inspection report dated 6/3/14. location i.d. 78940 n/a for maher | $3,000 | |
| Oct 17, 2014 | Completed final sign-off Oct 2017 | 310 Duncan St | remodel entire interior (n) foundation work and seismic upgrade; repair (e) stairs @ rear "in-kind" replace windows & add dormers. fire sprinkler nfpa 13r under separate permit.Details
remodel entire interior (n) foundation work and seismic upgrade; repair (e) stairs @ rear "in-kind" replace windows & add dormers. fire sprinkler nfpa 13r under separate permit. | $250,000 | |
| Sep 5, 2014 | Completed final sign-off Oct 2014 | 2369 Mission St | San Diego Painting And Home Work | g/f - t.i. - install retail store, install hand railing at entrance & install ada compliant restroom.Details
g/f - t.i. - install retail store, install hand railing at entrance & install ada compliant restroom. | $18,000 |
| Jun 30, 2014 | Completed final sign-off Aug 2014 | 29 Lapidge St | unit 1: interior remodel - revert closets, widen kitchen opening.Details
unit 1: interior remodel - revert closets, widen kitchen opening. | $2,500 | |
| Jun 24, 2014 | Expired or cancelled withdrawn Apr 2016 | 2639 44th Av | add new master bedroom, bathroom & laundry at rear of building. add deck & stair to yard.Details
add new master bedroom, bathroom & laundry at rear of building. add deck & stair to yard. | $30,000 | |
| Mar 19, 2014 | Never finaled issued Nov 2014, no final | 2527 16th Av | remodel 1st fl existing bath, e solarium, e laundry, new bedroom, family room, replace e foundation. remodel 2nd fl: e kitchen, e bath, e bedrooms, new bathsDetails
remodel 1st fl existing bath, e solarium, e laundry, new bedroom, family room, replace e foundation. remodel 2nd fl: e kitchen, e bath, e bedrooms, new baths | $125,000 | |
| Mar 18, 2014 | Completed final sign-off Aug 2014 | 268 Church St | Ac And Company | remodel existing picture framing store by replacing work tables.Details
remodel existing picture framing store by replacing work tables. | $7,000 |
| Jan 10, 2014 | Expired or cancelled expired Apr 2017 | 4316 25th St | remodel & rebuild entire house: kitchen, dining, living, family room, bedrooms, bathrooms, laundry & garage, seismic upgrade entire house, new bath& family @ basement, replace (e) stairs @ rear with new spiral stair.Details
remodel & rebuild entire house: kitchen, dining, living, family room, bedrooms, bathrooms, laundry & garage, seismic upgrade entire house, new bath& family @ basement, replace (e) stairs @ rear with new spiral stair. | $290,000 | |
| Nov 25, 2013 | Completed final sign-off May 2014 | 780 Brannan St | revision to appl #2013.0731.3195: create additional product/show rooms by additional partition walls.Details
revision to appl #2013.0731.3195: create additional product/show rooms by additional partition walls. | $16,000 | |
| Nov 18, 2013 | Completed final sign-off Dec 2013 | 21 Butte Pl | revision to appl #2013.10.18.9727 - omit packaging room & reconfigure entrance (interior) at 21 butte place. single door at entranceDetails
revision to appl #2013.10.18.9727 - omit packaging room & reconfigure entrance (interior) at 21 butte place. single door at entrance | $3,000 | |
| Nov 18, 2013 | Completed final sign-off May 2014 | 567 07th St | interior remodle - remodel 4 existing restrooms to comply w/ada requirements. reconfigure office and closet space.Details
interior remodle - remodel 4 existing restrooms to comply w/ada requirements. reconfigure office and closet space. | $47,000 | |
| Nov 18, 2013 | Completed final sign-off Aug 2015 | 2048 Taraval St | change of use from general grocery/delicatessen to limited use restaurant. abate n.o.v#201329021.Details
change of use from general grocery/delicatessen to limited use restaurant. abate n.o.v#201329021. | $500 |