Block 6600, lot 020
190 28th St
- City’s use
- Multi-Family Residential
- Built
- 1909
- Stories
- 2
- Units
- 2
- Rooms
- 4 bedrooms, 2 bathrooms
- Building
- 1,840 sq ft
- Lot
- 1,288 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
15 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 28, 2019 | Never finaled issued Feb 2019, no final | 190 28th St | street space onlyDetails
street space only | ||
| Dec 19, 2018 | Completed final sign-off Jul 2019 | 188 28th St | revision to pa #201804237115. bathroom location and kitchen layout.Details
revision to pa #201804237115. bathroom location and kitchen layout. | ||
| Dec 18, 2018 | Completed final sign-off Jul 2019 | 188 28th St | revision to "repair" (e) stair to upper unit beyond 50% per dbi inspector "replace in-kind" ref pa 2018-1204-7445Details
revision to "repair" (e) stair to upper unit beyond 50% per dbi inspector "replace in-kind" ref pa 2018-1204-7445 | $6,000 | |
| Dec 12, 2018 | Completed final sign-off May 2019 | 190 28th St | repair/replace front siding with wood rustic.Details
repair/replace front siding with wood rustic. | $3,500 | |
| Dec 4, 2018 | Never finaled issued Dec 2018, no final | 188 28th St | street spaceDetails
street space | ||
| Dec 4, 2018 | Never finaled issued Dec 2018, no final | 190 28th St | repair/replace side stairs in-kind less than 50%. in frontDetails
repair/replace side stairs in-kind less than 50%. in front | $7,200 | |
| Oct 12, 2018 | Completed final sign-off May 2019 | 190 28th St | repair rear sidingDetails
repair rear siding | $4,500 | |
| Oct 9, 2018 | Completed final sign-off May 2019 | 188 28th St | remove and replace front windows with double hung aluminum wood clad.Details
remove and replace front windows with double hung aluminum wood clad. | $3,000 | |
| Sep 19, 2018 | Completed final sign-off May 2019 | 190 28th St | replace existing windows in kind. (like for like) side and rear windows only.Details
replace existing windows in kind. (like for like) side and rear windows only. | $2,800 | |
| Sep 19, 2018 | Never finaled issued Sep 2018, no final | 188 28th St | street spaceDetails
street space | ||
| Jul 23, 2018 | Never finaled issued Jul 2018, no final | 188 28th St | street spaceDetails
street space | ||
| Apr 23, 2018 | Completed final sign-off Jul 2019 | 188 28th St | lower level: voluntary foundation replacement, seismic upgrade to lower space. replace (e) kitchen & bathDetails
lower level: voluntary foundation replacement, seismic upgrade to lower space. replace (e) kitchen & bath | $60,000 | |
| Mar 25, 2010 | Completed final sign-off Aug 2010 | 190 28th St | Kevin Cooper Construction | replace 3 windows with milgard white vinyl two on side, 1 in the back not visible from street.Details
replace 3 windows with milgard white vinyl two on side, 1 in the back not visible from street. | $1,200 |
| Mar 15, 2010 | Completed final sign-off Jul 2010 | 188 28th St | repair staircase (front, exterior). replace & repair as needed front shingles.Details
repair staircase (front, exterior). replace & repair as needed front shingles. | $500 | |
| Mar 28, 2006 | Never finaled issued Mar 2006, no final | 188 28th St | P M Construction | break up concrete in walkway. install new 40' long sewer lateral to sidewalk. backfill trench w soil. scope of work inside property onlyDetails
break up concrete in walkway. install new 40' long sewer lateral to sidewalk. backfill trench w soil. scope of work inside property only | $4,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Kevin Cooper Construction, P M Construction
- Architects
- Luis Robles
- Engineers
- Timothy M. O'sullivan
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.