Block 6656, lot 008
38 Chenery St
- City’s use
- Single Family Residential
- Built
- 1900
- Stories
- 1
- Units
- 1
- Rooms
- 1 bathroom
- Building
- 1,012 sq ft
- Lot
- 3,123 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 4, 2026 | In progress filed Jun 2026, not yet issued | 38 Chenery St | Hong's General Construction Inc | revision to pa# 202101192880, to use state adu program instead of local program, to remove the fire sprinklers as no longer required under adu r3, keep 2ft existing nonconforming rear structure, remove side door into exterior hallway. no change to building envelope.Details
revision to pa# 202101192880, to use state adu program instead of local program, to remove the fire sprinklers as no longer required under adu r3, keep 2ft existing nonconforming rear structure, remove side door into exterior hallway. no change to building envelope. | $1,000 |
| Sep 20, 2023 | Never finaled filed Sep 2023, never issued | 38 Chenery St | legalize interior stair (interior front part of building) to connect 1st fl to 2nd fl per nov# 202309946. all other work at 1st fl is under adu pa# 202101192880 (rear of building). no change of (e) building envelope.Details
legalize interior stair (interior front part of building) to connect 1st fl to 2nd fl per nov# 202309946. all other work at 1st fl is under adu pa# 202101192880 (rear of building). no change of (e) building envelope. | $8,600 | |
| Jun 2, 2023 | Never finaled issued Jun 2023, no final | 38 Chenery St | Hong's General Construction Inc | front siding in-kind around 600 sqft, replace in kind . repair front of stairs in kind less than 50%Details
front siding in-kind around 600 sqft, replace in kind . repair front of stairs in kind less than 50% | $10,000 |
| May 13, 2022 | Completed final sign-off Jun 2023 | 38 Chenery St | Machu Picchu Roofing Inc | reroofingDetails
reroofing | $23,000 |
| Jan 19, 2021 | In progress issued Dec 2025 | 38 Chenery St | Hong's General Construction Inc | adu per planning code sec 207.1 to legalize the udu at the ground floor including kitchen, bathrooms, bedrooms, and a 489 sqft rear addition, and reconfiguring the interior stair to separate the units. and per planner request to legalize second floor rear addition not addressed under 202009234802.Details
adu per planning code sec 207.1 to legalize the udu at the ground floor including kitchen, bathrooms, bedrooms, and a 489 sqft rear addition, and reconfiguring the interior stair to separate the units. and per planner request to legalize second floor rear addition not addressed under 202009234802. | $138,000 |
| Sep 23, 2020 | Completed final sign-off May 2023 | 38 Chenery St | Hong's General Construction Inc | for 2nd floor, relocate & update (e) kitchen and bath with new electrical and plumbing, add 1 (n) bath. for 3rd floor, add new unit, reconfiguring interior layout. interior remodel only with no change to exterior facade. 1st floor adu will be submitted separately.Details
for 2nd floor, relocate & update (e) kitchen and bath with new electrical and plumbing, add 1 (n) bath. for 3rd floor, add new unit, reconfiguring interior layout. interior remodel only with no change to exterior facade. 1st floor adu will be submitted separately. | $120,000 |
| Sep 10, 2020 | Expired or cancelled expired May 2023 | 38 Chenery St | Hong's General Construction Inc | remodel interior repair and replace kitchen and 2 bathrooms in kind at 2nd floor.Details
remodel interior repair and replace kitchen and 2 bathrooms in kind at 2nd floor. | $53,000 |
| Aug 14, 2020 | Completed final sign-off May 2023 | 38 Chenery St | Hong's General Construction Inc | explority investi setion for foundationDetails
explority investi setion for foundation | $2,000 |
| May 22, 2000 | Completed final sign-off Sep 2000 | 38 Chenery St | Ed Horan | repair dryrot front stairs, replace dryrot as needed to stringer, steps, risers,decks & support membDetails
repair dryrot front stairs, replace dryrot as needed to stringer, steps, risers,decks & support memb | $1,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Hong's General Construction Inc (6), Ed Horan, Machu Picchu Roofing Inc
- Architects
- Luis Antonio Robles (4), Michael Hom
- Engineers
- Michael Hom (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.