Three Brothers Construction
- Based in
- Pacifica
- On San Francisco permits
- Oct 2015 to Nov 2024
- Last 24 months
- 1 permit filed
24 permits since 2000: 21 completed, 1 in progress, 2 never finaled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 18, 2024 | In progress issued May 2025 | 1830 45th Av | interior remodel reconfigure 1st floor with (n) bathroom. adding (n) bathroom to create master bedroom upgrade (e) kitchen and bathroom. propse (n) deck to access the back yard with appx 6'x 9' deck and about 5 ' above groundDetails
interior remodel reconfigure 1st floor with (n) bathroom. adding (n) bathroom to create master bedroom upgrade (e) kitchen and bathroom. propse (n) deck to access the back yard with appx 6'x 9' deck and about 5 ' above ground | $110,000 |
| Aug 26, 2024 | Completed final sign-off Aug 2026 | 83 Los Palmos Dr | interior remodel: remodel (e) kitchen and bathrooms on 2/f, adding new bathroom to create new master bedroom at 1/f and relocate/ upgrade (e) furnace and water heater in basement. upgrade (e) electrical panel to 200 amps.Details
interior remodel: remodel (e) kitchen and bathrooms on 2/f, adding new bathroom to create new master bedroom at 1/f and relocate/ upgrade (e) furnace and water heater in basement. upgrade (e) electrical panel to 200 amps. | $120,000 |
| Jan 9, 2024 | Completed final sign-off Dec 2024 | 520 Argonaut Av | comply w/ nov# 202302268: 1st fl- change sliding glass door. to remove (e) bathroom wall. close opening in kitchen to family room. remodel kitchen. change water heater to tankless. remove wall heaters and install central heating. 2nd fl-remove (e) wall in master bathroom. remodel (e) bathroom.Details
comply w/ nov# 202302268: 1st fl- change sliding glass door. to remove (e) bathroom wall. close opening in kitchen to family room. remodel kitchen. change water heater to tankless. remove wall heaters and install central heating. 2nd fl-remove (e) wall in master bathroom. remodel (e) bathroom. | $110,000 |
| Oct 17, 2022 | Completed final sign-off May 2025 | 348 Edna St | minor change of approved plan 202207299572. bath at gr fl to extend the new wall and per inspector and engineer upgrade the existing foundation on the leftDetails
minor change of approved plan 202207299572. bath at gr fl to extend the new wall and per inspector and engineer upgrade the existing foundation on the left | $2,600 |
| Jul 29, 2022 | Completed final sign-off May 2025 | 348 Edna St | interior remodel: new master bedroom w/full bath and office on the 1st fl conencted with new itnerior stair. reconfigure the existing layout on 2nd floor with new kitchen countertop & cabinets. no change of the existing bldg front facade.Details
interior remodel: new master bedroom w/full bath and office on the 1st fl conencted with new itnerior stair. reconfigure the existing layout on 2nd floor with new kitchen countertop & cabinets. no change of the existing bldg front facade. | $25,000 |
| Apr 20, 2021 | Never finaled issued Jun 2021, no final | 10 Encline Ct | revise approved plan #202009244929 sheet a-4 3rd floor to keep existing master suite as is.Details
revise approved plan #202009244929 sheet a-4 3rd floor to keep existing master suite as is. | |
| Sep 24, 2020 | Completed final sign-off Jul 2021 | 10 Encline Ct | bath remodel at 2nd fl and 3rd fl per plan. no work at basement and no change of building envelope and facadeDetails
bath remodel at 2nd fl and 3rd fl per plan. no work at basement and no change of building envelope and facade | $45,000 |
| Dec 23, 2019 | Completed final sign-off Mar 2020 | 895 46th Av | reroofing.Details
reroofing. | $14,000 |
| Dec 20, 2019 | Completed final sign-off Jul 2020 | 895 46th Av | revision to 201910316142, constuct new concrete slab 1st fl entry. relocate isolated footing on the garage lvel. resize closet in bedroom 1, loft, bedroom 3 and master bedroom, relcoate shear wallDetails
revision to 201910316142, constuct new concrete slab 1st fl entry. relocate isolated footing on the garage lvel. resize closet in bedroom 1, loft, bedroom 3 and master bedroom, relcoate shear wall | |
| Nov 27, 2019 | Completed final sign-off Jun 2020 | 80 Alpha St | selective dry rot repair at front facade - all trim and details to remain or be replaced exactly in-kind. no other work under this permit. replace main electrical panel to 200amp. (sep electrical permit). ref pa #201908269852Details
selective dry rot repair at front facade - all trim and details to remain or be replaced exactly in-kind. no other work under this permit. replace main electrical panel to 200amp. (sep electrical permit). ref pa #201908269852 | $25,000 |
| Oct 31, 2019 | Completed final sign-off Jul 2020 | 895 46th Av | 1)level 1: relocate steps to garage & modify stairs going up to level2. 2)level 2: change extg living room into master bedroom with master bath & closet, remodel kitchen, dining area and remove extg wall seperating kitchen from bedroom, remodel extg bathroom and bedroom. infill lightwell at 2nd flDetails
1)level 1: relocate steps to garage & modify stairs going up to level2. 2)level 2: change extg living room into master bedroom with master bath & closet, remodel kitchen, dining area and remove extg wall seperating kitchen from bedroom, remodel extg bathroom and bedroom. infill lightwell at 2nd fl | $100,000 |
| Aug 26, 2019 | Completed final sign-off Sep 2019 | 435 Cabrillo St | reinstate automated 2 family dwelling use, remove stairs from ground fl. to 2nd fl. create storage room on 1st fl.Details
reinstate automated 2 family dwelling use, remove stairs from ground fl. to 2nd fl. create storage room on 1st fl. | $500 |
| Aug 26, 2019 | Completed final sign-off Jun 2020 | 80 Alpha St | demolish existing kitchen and bathroom - upgrades plumbing and electric - replace existing front windows with wood interior aluminum cladding within the existing openings.Details
demolish existing kitchen and bathroom - upgrades plumbing and electric - replace existing front windows with wood interior aluminum cladding within the existing openings. | $20,000 |
| Aug 22, 2019 | Completed final sign-off Jan 2020 | 647 34th Av | revision to pa 2019-0418-8402 remove door in garage hallway. remove window in bathroom. change pantry to hall closet. shorten hallway wall @ 2nd fl; remove existing kitchen window; remove (e) pier and construct new concrete pier; add new beam under bathroom wall; add new ceiling beamDetails
revision to pa 2019-0418-8402 remove door in garage hallway. remove window in bathroom. change pantry to hall closet. shorten hallway wall @ 2nd fl; remove existing kitchen window; remove (e) pier and construct new concrete pier; add new beam under bathroom wall; add new ceiling beam | |
| Jul 31, 2019 | Completed final sign-off Feb 2020 | 840 42nd Av | revision to app#201810233901. revised foundation detail.Details
revision to app#201810233901. revised foundation detail. | |
| Jun 17, 2019 | Completed final sign-off Jan 2020 | 647 34th Av | revision to pa 2019-0418-8402. add new foundation and replace existing 3" thick slab with 4" thick slab concreteDetails
revision to pa 2019-0418-8402. add new foundation and replace existing 3" thick slab with 4" thick slab concrete | $20,000 |
| Apr 18, 2019 | Completed final sign-off Jan 2020 | 647 34th Av | level 1: add 1 bedroom, study, laundry room, modify (e) bathroom and relocate stairs going to level 2. level 2: change existing bedroom into master bedroom with master bath & closet, remodel, kitchen, dining area, relocate (e) stairs going down to level 1.Details
level 1: add 1 bedroom, study, laundry room, modify (e) bathroom and relocate stairs going to level 2. level 2: change existing bedroom into master bedroom with master bath & closet, remodel, kitchen, dining area, relocate (e) stairs going down to level 1. | $70,000 |
| Apr 9, 2019 | Completed final sign-off Feb 2020 | 840 42nd Av | revision to 201810233901. relocate closet, laundry, stairs, and bathroom level 1. relocate stairs level 2. delete and modify floor beams, shear walls and holddownsDetails
revision to 201810233901. relocate closet, laundry, stairs, and bathroom level 1. relocate stairs level 2. delete and modify floor beams, shear walls and holddowns | |
| Apr 5, 2019 | Completed final sign-off May 2019 | 2642 Ulloa St | revision to app#201809190831 to document changes. 1)change new foundation to extg. 2)change new skylights to extgDetails
revision to app#201809190831 to document changes. 1)change new foundation to extg. 2)change new skylights to extg | |
| Feb 13, 2019 | Never finaled issued Mar 2019, no final | 2642 Ulloa St | comply with nov 201830064. revision to 201809190831 shear wall deleted, shear wall changed from 9' to 7'. joist connected to ledge instead of top plate, closet wall removed. skyklights repairedDetails
comply with nov 201830064. revision to 201809190831 shear wall deleted, shear wall changed from 9' to 7'. joist connected to ledge instead of top plate, closet wall removed. skyklights repaired | |
| Jan 18, 2019 | Completed final sign-off Jun 2019 | 435 Cabrillo St | level 1- reno (e) kitch, , mod bath, (n) clost at fam rm. level 2-(n) half bath, reno kitch area, remove partl walls at den & dine area. level 3- convert 2 beds to mast bed w/ bath, remove half bath, mod (e) full bath, (n) laundry, (n) stairs to atic. atic- add walls, cent heat, storage, skyltsDetails
level 1- reno (e) kitch, , mod bath, (n) clost at fam rm. level 2-(n) half bath, reno kitch area, remove partl walls at den & dine area. level 3- convert 2 beds to mast bed w/ bath, remove half bath, mod (e) full bath, (n) laundry, (n) stairs to atic. atic- add walls, cent heat, storage, skylts | $75,000 |
| Oct 23, 2018 | Completed final sign-off Feb 2020 | 840 42nd Av | level 1 - add 2 bedrooms, family room, study, laundry room; modify existing bathroom and add stairs going up to level 2; level 2 - change existing bedroom into master bedroom with master bath and closet, remodel kitchen, dining area and add stair going to level 1; replace furnaceDetails
level 1 - add 2 bedrooms, family room, study, laundry room; modify existing bathroom and add stairs going up to level 2; level 2 - change existing bedroom into master bedroom with master bath and closet, remodel kitchen, dining area and add stair going to level 1; replace furnace | $70,000 |
| Sep 19, 2018 | Completed final sign-off May 2019 | 2642 Ulloa St | 1st fl add 2 bedrooms, family rm, study, laundry rm, modify e bath and stairs going up, 2ndf l change e bdrm into master bedrm with master bath and closet, remodel kitchen, dining areaDetails
1st fl add 2 bedrooms, family rm, study, laundry rm, modify e bath and stairs going up, 2ndf l change e bdrm into master bedrm with master bath and closet, remodel kitchen, dining area | $60,000 |
| Oct 21, 2015 | Completed final sign-off Nov 2024 | 234 27th Av | soft storey retrofit: ground lvel only per chapter 34b engineering criteria other rational designDetails
soft storey retrofit: ground lvel only per chapter 34b engineering criteria other rational design | $30,000 |