Three Brothers Construction
- Based in
- Pacifica
- On San Francisco permits
- Oct 2015 to Nov 2024
- Last 24 months
- 1 permit filed
24 permits since 2000: 21 completed, 1 in progress, 2 never finaled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 in progress. Typically 171 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 18, 2024 | In progress issued May 2025 | 1830 45th Av | interior remodel reconfigure 1st floor with (n) bathroom. adding (n) bathroom to create master bedroom upgrade (e) kitchen and bathroom. propse (n) deck to access the back yard with appx 6'x 9' deck and about 5 ' above groundDetails
interior remodel reconfigure 1st floor with (n) bathroom. adding (n) bathroom to create master bedroom upgrade (e) kitchen and bathroom. propse (n) deck to access the back yard with appx 6'x 9' deck and about 5 ' above ground | $110,000 |