Back to kitchen remodel contractors
Three Brothers Construction
- Based in
- Pacifica
- On San Francisco permits
- Oct 2015 to Nov 2024
- Last 24 months
- 1 permit filed
24 permits since 2000: 21 completed, 1 in progress, 2 never finaled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 9 completed, 1 in progress. Typically 16 days from filing to permit and 304 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 18, 2024 | In progress issued May 2025 | 1830 45th Av | interior remodel reconfigure 1st floor with (n) bathroom. adding (n) bathroom to create master bedroom upgrade (e) kitchen and bathroom. propse (n) deck to access the back yard with appx 6'x 9' deck and about 5 ' above groundDetails
interior remodel reconfigure 1st floor with (n) bathroom. adding (n) bathroom to create master bedroom upgrade (e) kitchen and bathroom. propse (n) deck to access the back yard with appx 6'x 9' deck and about 5 ' above ground | $110,000 |
| Aug 26, 2024 | Completed final sign-off Aug 2026 | 83 Los Palmos Dr | interior remodel: remodel (e) kitchen and bathrooms on 2/f, adding new bathroom to create new master bedroom at 1/f and relocate/ upgrade (e) furnace and water heater in basement. upgrade (e) electrical panel to 200 amps.Details
interior remodel: remodel (e) kitchen and bathrooms on 2/f, adding new bathroom to create new master bedroom at 1/f and relocate/ upgrade (e) furnace and water heater in basement. upgrade (e) electrical panel to 200 amps. | $120,000 |
| Jan 9, 2024 | Completed final sign-off Dec 2024 | 520 Argonaut Av | comply w/ nov# 202302268: 1st fl- change sliding glass door. to remove (e) bathroom wall. close opening in kitchen to family room. remodel kitchen. change water heater to tankless. remove wall heaters and install central heating. 2nd fl-remove (e) wall in master bathroom. remodel (e) bathroom.Details
comply w/ nov# 202302268: 1st fl- change sliding glass door. to remove (e) bathroom wall. close opening in kitchen to family room. remodel kitchen. change water heater to tankless. remove wall heaters and install central heating. 2nd fl-remove (e) wall in master bathroom. remodel (e) bathroom. | $110,000 |
| Jul 29, 2022 | Completed final sign-off May 2025 | 348 Edna St | interior remodel: new master bedroom w/full bath and office on the 1st fl conencted with new itnerior stair. reconfigure the existing layout on 2nd floor with new kitchen countertop & cabinets. no change of the existing bldg front facade.Details
interior remodel: new master bedroom w/full bath and office on the 1st fl conencted with new itnerior stair. reconfigure the existing layout on 2nd floor with new kitchen countertop & cabinets. no change of the existing bldg front facade. | $25,000 |
| Oct 31, 2019 | Completed final sign-off Jul 2020 | 895 46th Av | 1)level 1: relocate steps to garage & modify stairs going up to level2. 2)level 2: change extg living room into master bedroom with master bath & closet, remodel kitchen, dining area and remove extg wall seperating kitchen from bedroom, remodel extg bathroom and bedroom. infill lightwell at 2nd flDetails
1)level 1: relocate steps to garage & modify stairs going up to level2. 2)level 2: change extg living room into master bedroom with master bath & closet, remodel kitchen, dining area and remove extg wall seperating kitchen from bedroom, remodel extg bathroom and bedroom. infill lightwell at 2nd fl | $100,000 |
| Aug 26, 2019 | Completed final sign-off Jun 2020 | 80 Alpha St | demolish existing kitchen and bathroom - upgrades plumbing and electric - replace existing front windows with wood interior aluminum cladding within the existing openings.Details
demolish existing kitchen and bathroom - upgrades plumbing and electric - replace existing front windows with wood interior aluminum cladding within the existing openings. | $20,000 |
| Aug 22, 2019 | Completed final sign-off Jan 2020 | 647 34th Av | revision to pa 2019-0418-8402 remove door in garage hallway. remove window in bathroom. change pantry to hall closet. shorten hallway wall @ 2nd fl; remove existing kitchen window; remove (e) pier and construct new concrete pier; add new beam under bathroom wall; add new ceiling beamDetails
revision to pa 2019-0418-8402 remove door in garage hallway. remove window in bathroom. change pantry to hall closet. shorten hallway wall @ 2nd fl; remove existing kitchen window; remove (e) pier and construct new concrete pier; add new beam under bathroom wall; add new ceiling beam | |
| Apr 18, 2019 | Completed final sign-off Jan 2020 | 647 34th Av | level 1: add 1 bedroom, study, laundry room, modify (e) bathroom and relocate stairs going to level 2. level 2: change existing bedroom into master bedroom with master bath & closet, remodel, kitchen, dining area, relocate (e) stairs going down to level 1.Details
level 1: add 1 bedroom, study, laundry room, modify (e) bathroom and relocate stairs going to level 2. level 2: change existing bedroom into master bedroom with master bath & closet, remodel, kitchen, dining area, relocate (e) stairs going down to level 1. | $70,000 |
| Oct 23, 2018 | Completed final sign-off Feb 2020 | 840 42nd Av | level 1 - add 2 bedrooms, family room, study, laundry room; modify existing bathroom and add stairs going up to level 2; level 2 - change existing bedroom into master bedroom with master bath and closet, remodel kitchen, dining area and add stair going to level 1; replace furnaceDetails
level 1 - add 2 bedrooms, family room, study, laundry room; modify existing bathroom and add stairs going up to level 2; level 2 - change existing bedroom into master bedroom with master bath and closet, remodel kitchen, dining area and add stair going to level 1; replace furnace | $70,000 |
| Sep 19, 2018 | Completed final sign-off May 2019 | 2642 Ulloa St | 1st fl add 2 bedrooms, family rm, study, laundry rm, modify e bath and stairs going up, 2ndf l change e bdrm into master bedrm with master bath and closet, remodel kitchen, dining areaDetails
1st fl add 2 bedrooms, family rm, study, laundry rm, modify e bath and stairs going up, 2ndf l change e bdrm into master bedrm with master bath and closet, remodel kitchen, dining area | $60,000 |