Lok C. Kwan
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Kwan & Associates
- Based in
- Burlingame
- On San Francisco permits
- Nov 2000 to Dec 2024
179 permits since 2000 (engineer on 137 permits, architect on 34 permits, authorized agent-others on 4 permits, designer on 4 permits): 116 completed, 1 in progress, 31 never finaled, 31 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 179.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 10, 2024 | In progress issued Dec 2024 | 200 04th Av | P Jordan Builders Llc | voluntary adding plywood at existing walls at partial basement, entire first, second and third floor and simpson strong walls at front on 4th avenue, finished with 5/8" type x gyp board at each side of walls.Details
voluntary adding plywood at existing walls at partial basement, entire first, second and third floor and simpson strong walls at front on 4th avenue, finished with 5/8" type x gyp board at each side of walls. | $30,000 |
| May 29, 2024 | Completed final sign-off Aug 2024 | 631 08th Av | Modern Builder Construction Inc | replace existing deteriorated 2nd exit stairway at light court in kindDetails
replace existing deteriorated 2nd exit stairway at light court in kind | $20,000 |
| May 28, 2024 | Completed final sign-off Sep 2024 | 46 Loyola Tr | P Jordan Builders Llc | replace front entrance deteriorated stairway w/ new. finish to match existing. brick topping and & stucco finish.Details
replace front entrance deteriorated stairway w/ new. finish to match existing. brick topping and & stucco finish. | $50,000 |
| Dec 1, 2023 | Completed final sign-off Jun 2024 | 700 10th Av | Rinaldi Construction | remove (e) metal hatch door (3'8" x 3'6") at sidewalk & fill the space below (approx 5' deep) with compacted soil. clear dpw notice 1240308 to repair sidewalk. add concrere wall below property line openning.Details
remove (e) metal hatch door (3'8" x 3'6") at sidewalk & fill the space below (approx 5' deep) with compacted soil. clear dpw notice 1240308 to repair sidewalk. add concrere wall below property line openning. | $6,800 |
| Nov 1, 2023 | Completed final sign-off Dec 2024 | 479 Broadway | to comply with abe #201902135180. add an automatic door opener @ entrance of bar. replace threshold at doorDetails
to comply with abe #201902135180. add an automatic door opener @ entrance of bar. replace threshold at door | $3,500 | |
| Jul 21, 2023 | Completed final sign-off Nov 2023 | 850 Grant Av | Monolith Construction Inc. | to comply with bid nov#20o2308482 dated 5/23/2023, restore decorative sheet metal piece @ face of wall above 3/f front of building.Details
to comply with bid nov#20o2308482 dated 5/23/2023, restore decorative sheet metal piece @ face of wall above 3/f front of building. | $7,000 |
| Jun 27, 2023 | Completed final sign-off Nov 2023 | 550 Crestlake Dr | Michael Heavey Construction | rear yard retaining wall, remove (e)deteriorated wood retaining wall @ 2nd tier level, replace w/steel solider beam w/drilled piers & concrete wallDetails
rear yard retaining wall, remove (e)deteriorated wood retaining wall @ 2nd tier level, replace w/steel solider beam w/drilled piers & concrete wall | $15,000 |
| Nov 2, 2022 | Never finaled issued Nov 2022, no final | 174 12th Av | commencement of work not started under previously approved bpa#201712186712 (retrofit ground level for wood frame seismic retrofit program per soft story retrofit per sfbc ch 4d, 2016 cebc appendix a4. comply with nov 201720235)Details
commencement of work not started under previously approved bpa#201712186712 (retrofit ground level for wood frame seismic retrofit program per soft story retrofit per sfbc ch 4d, 2016 cebc appendix a4. comply with nov 201720235) | $80,000 | |
| Sep 22, 2022 | Completed final sign-off Feb 2023 | 661 Broadway | Velero Inc | replace (e) parking pavement w/new waterproof membrane @ street level, repair ceiling @ basement.Details
replace (e) parking pavement w/new waterproof membrane @ street level, repair ceiling @ basement. | $180,000 |
| Jul 13, 2022 | Completed final sign-off Sep 2022 | 98 Battery St | City Mechanical Inc | 3/f: air handler replacementDetails
3/f: air handler replacement | $150,000 |
| Jun 3, 2022 | Expired or cancelled cancelled Jan 2026 | 1881 Sutter St | Box Canyon Builders Dba The Englander | unit #307 & #311: replace deck beams per strucural drawings.Details
unit #307 & #311: replace deck beams per strucural drawings. | $5,000 |
| May 9, 2022 | Completed final sign-off Dec 2023 | 16 Sharp Pl | Terence Mcmahon Construction | revision to permit 201909202256. underpinning of existing footing along sharp place property line wall except area as indicated on plan.Details
revision to permit 201909202256. underpinning of existing footing along sharp place property line wall except area as indicated on plan. | |
| Feb 11, 2022 | Never finaled issued Feb 2022, no final | 98 Battery St | City Mechanical Inc | 6/f: hvac improvements.Details
6/f: hvac improvements. | $130,000 |
| Jul 6, 2020 | Completed final sign-off Mar 2024 | 4644 Geary Bl | Marina Construction, Pacific Engineering & Construction Inc. | compliance per items as listed in the mandatory disability access improvement program category checklist compliance form on page 7 for the proposed barrier remediation at store entrance. add a new unisex ada restroom and modify (e) laundry room.Details
compliance per items as listed in the mandatory disability access improvement program category checklist compliance form on page 7 for the proposed barrier remediation at store entrance. add a new unisex ada restroom and modify (e) laundry room. | $15,000 |
| Nov 19, 2019 | Completed final sign-off Jul 2023 | 161 Leavenworth St | Michael Heavey Construction | replace (e) sidewalk on turk street side only portion of sidewalk with basement approx 70sf with new concrete over metal decking and suppport by new steel beams. portion basement area below sidewalk will be abandoned, fill with dirt and shotcrete wall below slab-on-grade sidewalk.Details
replace (e) sidewalk on turk street side only portion of sidewalk with basement approx 70sf with new concrete over metal decking and suppport by new steel beams. portion basement area below sidewalk will be abandoned, fill with dirt and shotcrete wall below slab-on-grade sidewalk. | $60,000 |
| Sep 4, 2019 | Completed final sign-off Feb 2023 | 1145 Union St | Terence Mcmahon Construction | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. ($20,000 of cost not for tenent pass through).Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. ($20,000 of cost not for tenent pass through). | $180,000 |
| Sep 4, 2019 | Completed final sign-off Nov 2019 | 2733 Folsom St | Soundproofing Remodelers | add sound insulation at ceiling of 2nd fl at master bedroom only.Details
add sound insulation at ceiling of 2nd fl at master bedroom only. | $10,000 |
| Aug 15, 2019 | Never finaled issued Aug 2019, no final | 2719 44th Av | Ng's Landmark Bldg & Engineering | railing replacementDetails
railing replacement | $6,000 |
| Apr 12, 2019 | Completed final sign-off Feb 2020 | 339 College Av | Udream Construction | ground fl only legalize bedroom and family roon, replace (e) bathroom fixture with new. remove (e) wood door at rear and replace with new sliding glass door. add plywood shearwall at rear wall only. legalize (e) bedroom & family room.Details
ground fl only legalize bedroom and family roon, replace (e) bathroom fixture with new. remove (e) wood door at rear and replace with new sliding glass door. add plywood shearwall at rear wall only. legalize (e) bedroom & family room. | $10,000 |
| Apr 12, 2019 | Completed final sign-off Feb 2020 | 339 College Av | Wong Construction Inc | ground fl only replace (e) deterorated footing with new at living area & portion of footing at gargar area. remove 1 post at garage area and replace (e) wood beam with a new steel beamDetails
ground fl only replace (e) deterorated footing with new at living area & portion of footing at gargar area. remove 1 post at garage area and replace (e) wood beam with a new steel beam | $30,000 |
| May 23, 2018 | Completed final sign-off Sep 2018 | 1541 Sacramento St | Giovacchini Construction Inc | revision to app#201708306357 and 201802282422. modify shear wall length and hold downs location due to site condition.Details
revision to app#201708306357 and 201802282422. modify shear wall length and hold downs location due to site condition. | |
| Apr 3, 2018 | Never finaled issued Apr 2021, no final | 20 Inverness Dr | Tosick Remodels, Makita Construction Inc. | relocate (e) kitchen from 2nd fl to 1st fl; remove (e) staircase @ front in living space; add 3rd fl w/ (n) great rm & deck (vertical addition).Details
relocate (e) kitchen from 2nd fl to 1st fl; remove (e) staircase @ front in living space; add 3rd fl w/ (n) great rm & deck (vertical addition). | $400,000 |
| Mar 26, 2018 | Completed final sign-off Feb 2019 | 3810 Divisadero St | C K Construction | revision to permit app #201505146298 to remove ada requirements. ada upgrades not required. maher naDetails
revision to permit app #201505146298 to remove ada requirements. ada upgrades not required. maher na | |
| Feb 23, 2018 | Never finaled issued Sep 2018, no final | 100 Laguna St | Quality Home Builders Construction Inc | add one adu(387 sf) @ ground fl per ord# 162-16. renovate 2 (e) ground fl units and storage area due to seismic retrofit pa#201608316430; renovate (e) rear stairs from 2nd fl to 1st fl. renovate (e) corridor. lower 8" fl to obtain 7ft.Details
add one adu(387 sf) @ ground fl per ord# 162-16. renovate 2 (e) ground fl units and storage area due to seismic retrofit pa#201608316430; renovate (e) rear stairs from 2nd fl to 1st fl. renovate (e) corridor. lower 8" fl to obtain 7ft. | $150,000 |
| Oct 25, 2017 | Completed final sign-off Aug 2019 | 456 Green St | Tri-C Designs Incorporated | mandatory seismic retrofit basement level per sfebc chapter 4d, 2016 cebc, appendix a-4 criteria.Details
mandatory seismic retrofit basement level per sfebc chapter 4d, 2016 cebc, appendix a-4 criteria. | $35,000 |
| Oct 2, 2017 | Never finaled filed Oct 2017, never issued | 115 Clifford Tr | Philip Going Inc. | remodel basement level including bath. install elevator. enclose (e) porch, remodel (e) living room & bath. remodel 2nd lkevel bedrooms & bath.Details
remodel basement level including bath. install elevator. enclose (e) porch, remodel (e) living room & bath. remodel 2nd lkevel bedrooms & bath. | $650,000 |
| Aug 30, 2017 | Completed final sign-off Jun 2018 | 477 25th Av | Wong Construction Inc | soft story retrofit per sfebc chapter 4d per engineering creteria 2016 cebc appendix a-4. n/a for maher.Details
soft story retrofit per sfebc chapter 4d per engineering creteria 2016 cebc appendix a-4. n/a for maher. | $80,000 |
| Aug 30, 2017 | Completed final sign-off Sep 2018 | 1541 Sacramento St | Giovacchini Construction Inc | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $70,000 |
| Aug 30, 2017 | Completed final sign-off Oct 2018 | 1322 04th Av | Bailey General Contracting Co Inc | soft story retrofit per sfebc chapter 4d per engineering creteria 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d per engineering creteria 2016 cebc appendix a-4. | $45,000 |
| Aug 22, 2017 | Completed final sign-off Sep 2019 | 2719 44th Av | Ng's Landmark Bldg & Engineering | retrofit ground level for wood frame seismic retrofit program per soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. original permit w 3/8" plywood installed under pa# 286184, moment frame @ rear under pa# 20007297699Details
retrofit ground level for wood frame seismic retrofit program per soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. original permit w 3/8" plywood installed under pa# 286184, moment frame @ rear under pa# 20007297699 | $28,000 |
| Aug 9, 2017 | Completed final sign-off Nov 2018 | 105 Cypress St | Wong Construction Inc | retrofit gr level for wood frame seismic retrofit per sfebc ch 4d, 2016 cebcDetails
retrofit gr level for wood frame seismic retrofit per sfebc ch 4d, 2016 cebc | $80,000 |
| Jul 19, 2017 | Completed final sign-off Dec 2019 | 349 Fillmore St | soft story retrofit per sfebc chapter 4d, engineering criteria 2016 cebc appendix a-4. ** maher: n/a **Details
soft story retrofit per sfebc chapter 4d, engineering criteria 2016 cebc appendix a-4. ** maher: n/a ** | $25,000 | |
| Jun 30, 2017 | Completed final sign-off Apr 2018 | 1026 Pine St | Ortizlaw Construction | retrofit ground level for wood frame seismic soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
retrofit ground level for wood frame seismic soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $50,000 |
| May 16, 2017 | Completed final sign-off Dec 2017 | 72 Middlefield Dr | Shing Hing Construction Co | work at ground floor only: remove & replace portion of deterorated footing with new at living area. remove one post at garage area & reinforce (e) wood beam with steel channels. add plywood shear walls @ ground floor.Details
work at ground floor only: remove & replace portion of deterorated footing with new at living area. remove one post at garage area & reinforce (e) wood beam with steel channels. add plywood shear walls @ ground floor. | $35,000 |
| Apr 26, 2017 | Completed final sign-off Jan 2018 | 1815 Powell St | John O'donovan | soft story retrofit ground floor & basement level for wood frame seismic retrofit program per soft story retrofit per sfebc chapter 4d, 2016 cebc appendix 4. commercial. 1811-1815 residential; 700-704 filbert/700 columbus-commercial; n/a maher ordinanceDetails
soft story retrofit ground floor & basement level for wood frame seismic retrofit program per soft story retrofit per sfebc chapter 4d, 2016 cebc appendix 4. commercial. 1811-1815 residential; 700-704 filbert/700 columbus-commercial; n/a maher ordinance | $190,000 |
| Mar 29, 2017 | Completed final sign-off Apr 2021 | 811 Burnett Av | add unit per ordinance no. 162-16. add a dwelling unit at sub basement level per ordinance no.162-16 soft story mandatory permit appln #201703292661Details
add unit per ordinance no. 162-16. add a dwelling unit at sub basement level per ordinance no.162-16 soft story mandatory permit appln #201703292661 | $50,000 | |
| Mar 29, 2017 | Completed final sign-off May 2017 | 339 Filbert St | Soundproofing Remodelers | add sound proofing insulation at ceiling of 339 filbert street at foyer, kitchen, dining ,and master bedroomDetails
add sound proofing insulation at ceiling of 339 filbert street at foyer, kitchen, dining ,and master bedroom | $40,000 |
| Mar 29, 2017 | Completed final sign-off Aug 2019 | 811 Burnett Av | retrofit gr fl lower garage lavel and subbasement level for wood frame seismic retrofit program per 2012 int existing bldg code iebc appendix a4Details
retrofit gr fl lower garage lavel and subbasement level for wood frame seismic retrofit program per 2012 int existing bldg code iebc appendix a4 | $70,000 | |
| Mar 15, 2017 | Completed final sign-off Oct 2017 | 679 Green St | Tri-C Designs Incorporated | soft story retrofit: retrofil ground & basement level for wood frame seismic retrofit program per 2012 iebc appendix a-4.Details
soft story retrofit: retrofil ground & basement level for wood frame seismic retrofit program per 2012 iebc appendix a-4. | $55,000 |
| Mar 15, 2017 | Expired or cancelled expired Feb 2019 | 56 Mason St | Michael Heavey Construction | remove and replace portion detiorated sidewalk on mason st approx 52' x 14'Details
remove and replace portion detiorated sidewalk on mason st approx 52' x 14' | $60,000 |
| Dec 20, 2016 | Completed final sign-off Apr 2017 | 1755 Chestnut St | retrofit ground level for wood frame seismic retrofit program per sfbc chapter 34b, 2012 iebc appendix a-4Details
retrofit ground level for wood frame seismic retrofit program per sfbc chapter 34b, 2012 iebc appendix a-4 | $65,000 | |
| Dec 20, 2016 | Expired or cancelled expired Aug 2023 | 3006 26th St | American Precision Bldrs | replace partial existing footing with new and underpinning partial existing foundation where footing adjacent to neighbor's bldg., lower (e) floor slab to creat sufficient 8' clear ceiling height. add plywood strenthening wall at ground level onlyDetails
replace partial existing footing with new and underpinning partial existing foundation where footing adjacent to neighbor's bldg., lower (e) floor slab to creat sufficient 8' clear ceiling height. add plywood strenthening wall at ground level only | $65,000 |
| Nov 14, 2016 | Completed final sign-off May 2018 | 877 Darien Wy | Hon's Construction Inc. | add a new elevator with 3 stops from 1st to 3rd floorDetails
add a new elevator with 3 stops from 1st to 3rd floor | $97,000 |
| Nov 14, 2016 | Completed final sign-off Jun 2017 | 37 Maynard St | Atlantic Construction Co Inc | revision to pa 2015-0930-8434, ground floor - change 1/2 bath to full bath, restore guestroom from pa 2015-0919-6642. add a new interior stairway from ground to 2nd floor. move washer & dryer to 2nd floor. 2nd floor - remove fireplace in living room & repair stair landing @ entrance.Details
revision to pa 2015-0930-8434, ground floor - change 1/2 bath to full bath, restore guestroom from pa 2015-0919-6642. add a new interior stairway from ground to 2nd floor. move washer & dryer to 2nd floor. 2nd floor - remove fireplace in living room & repair stair landing @ entrance. | $20,000 |
| Oct 26, 2016 | Never finaled issued Jan 2017, no final | 750 Vallejo St | 20 % ada improvement due to retrofit gr fl commercial and basement level for wood frame retrofit program. renovate existing restroom @ 752 vallejo and 2 restrooms at 750 vallejo to meet ada standard. add automatic door opener at 750 vallejoDetails
20 % ada improvement due to retrofit gr fl commercial and basement level for wood frame retrofit program. renovate existing restroom @ 752 vallejo and 2 restrooms at 750 vallejo to meet ada standard. add automatic door opener at 750 vallejo | $41,000 | |
| Oct 26, 2016 | Never finaled issued Jan 2017, no final | 750 Vallejo St | retrofit gr fl and basement for wood frame seismic retrofit residential program per 2012 int existing bldg code iebc appendix a4Details
retrofit gr fl and basement for wood frame seismic retrofit residential program per 2012 int existing bldg code iebc appendix a4 | $58,000 | |
| Oct 26, 2016 | Completed final sign-off Apr 2017 | 2357 Bush St | Wong Construction Inc | retrofit gr fl for wood frame seismic retrofit program per 2012 int ex bldg code appendix a4. maher not reqDetails
retrofit gr fl for wood frame seismic retrofit program per 2012 int ex bldg code appendix a4. maher not req | $50,000 |
| Oct 26, 2016 | Never finaled filed Oct 2016, never issued | 750 Vallejo St | 20 % ada improvement due to retrofit gr fl commercial and basement level for wood frame program. renovate existing 1 restroom at 752 vallejo and 2 at 750 vallejo to meet ada standard maher not reqDetails
20 % ada improvement due to retrofit gr fl commercial and basement level for wood frame program. renovate existing 1 restroom at 752 vallejo and 2 at 750 vallejo to meet ada standard maher not req | $58,000 | |
| Sep 14, 2016 | Completed final sign-off Apr 2018 | 1501 Lombard St | A J O Group Inc | retrofit gr flevel for wood frame seismic retrofit program per 2012 int'l existing bldge code iebc appendix a4Details
retrofit gr flevel for wood frame seismic retrofit program per 2012 int'l existing bldge code iebc appendix a4 | $90,000 |
| Aug 31, 2016 | Expired or cancelled expired Apr 2025 | 100 Laguna St | retrofit ground floor and crawl space for wood frame seismic retrofit program per 2012 international existing bldg code iebc appendix a4Details
retrofit ground floor and crawl space for wood frame seismic retrofit program per 2012 international existing bldg code iebc appendix a4 | $80,000 | |
| Aug 31, 2016 | Completed final sign-off Apr 2017 | 1720 Pacific Av | Wong Construction Inc | retrofit sub-basement and basement and crawl space level for wood frame seismic retrofit program per 2012 international existing bldg code iebc appendix a-4Details
retrofit sub-basement and basement and crawl space level for wood frame seismic retrofit program per 2012 international existing bldg code iebc appendix a-4 | $120,000 |
| Aug 1, 2016 | Completed final sign-off Aug 2017 | 3420 Pierce St | Raymond Villasenor Building Contractor | retrofit ground level for wood frame seismic retrofit program per 2012 iebc appx a4 maher naDetails
retrofit ground level for wood frame seismic retrofit program per 2012 iebc appx a4 maher na | $30,000 |
| Aug 1, 2016 | Completed final sign-off Nov 2016 | 78 Sanchez St | retrofit ground level for wood frame seismic retrofit program per 2012 iebc appx a4Details
retrofit ground level for wood frame seismic retrofit program per 2012 iebc appx a4 | $100,000 | |
| Jun 20, 2016 | Completed final sign-off Apr 2017 | 1561 Clay St | Baires Construction Inc | common area- retrofit ground level for wood frame seismic retrofit program per 2012 international existing building code (iebc) appendix a-4. n/a maher ordinance.Details
common area- retrofit ground level for wood frame seismic retrofit program per 2012 international existing building code (iebc) appendix a-4. n/a maher ordinance. | $30,000 |
| Jun 15, 2016 | Expired or cancelled withdrawn Mar 2017 | 1881 Sutter St | stair enclosure: add a roof top and walls on top of existing 2nd exit stairway.Details
stair enclosure: add a roof top and walls on top of existing 2nd exit stairway. | $10,000 | |
| May 6, 2016 | Completed final sign-off Jan 2026 | 871 Sanchez St | Beyond The Horizon Construction | enclose patio area below 2nd fl @ rear @ garage level to become a master bedrm w/ full bath. add (n) interior stair @ rear from ground to 2nd fl. add (n) laundry room in garage. remove exterior metal stair from ground to 2nd fl. enclose part of side deck & add (n) skylite. add 1-hr rated @ side deckDetails
enclose patio area below 2nd fl @ rear @ garage level to become a master bedrm w/ full bath. add (n) interior stair @ rear from ground to 2nd fl. add (n) laundry room in garage. remove exterior metal stair from ground to 2nd fl. enclose part of side deck & add (n) skylite. add 1-hr rated @ side deck | $40,000 |
| Mar 3, 2016 | Completed final sign-off May 2016 | 1414 Kansas St | Wong Construction Inc | revision to pa 2015-1119-3044, delete strong walls and replace with plywood shear walls. maher naDetails
revision to pa 2015-1119-3044, delete strong walls and replace with plywood shear walls. maher na | |
| Mar 2, 2016 | Completed final sign-off Mar 2017 | 1360 Kearny St | retrofit ground/garage level for wood frame seismic retrofit program per 2012 international extg bldg. code 2012 iebc appendix a-4Details
retrofit ground/garage level for wood frame seismic retrofit program per 2012 international extg bldg. code 2012 iebc appendix a-4 | $23,000 | |
| Jan 12, 2016 | Completed final sign-off Apr 2016 | 1530 Mcallister St | P Jordan Builders Inc | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a4. retrofit ground level for wood frame.Details
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a4. retrofit ground level for wood frame. | $50,000 |
| Dec 17, 2015 | Never finaled issued Dec 2015, no final | 118 Taylor St | Michael Heavey Construction | barrier removal at 118 taylor street entrance. add an automatic door opener & a conc. ramp at entrance of 118 taylor st.Details
barrier removal at 118 taylor street entrance. add an automatic door opener & a conc. ramp at entrance of 118 taylor st. | $5,000 |
| Nov 10, 2015 | Completed final sign-off May 2016 | 41 Drumm St | A R C Dba/ Architectural Coatings | revision to permit app. #201510089275; replace existing sidewalk slab with new concrete over metal decking; maher n/aDetails
revision to permit app. #201510089275; replace existing sidewalk slab with new concrete over metal decking; maher n/a | $25,000 |
| Sep 30, 2015 | Completed final sign-off Jun 2017 | 37 Maynard St | Atlantic Construction Co Inc, D S Management Inc Dba Metrocon Builders | revision to pa#201505196642: relocate 1/2 bath & delete bedroom at g/f, remove 3'6" wall at 2nd level between dining & kitchen and add a new beam at the location and post to ground level, relocate bathroom fixture at 3/f bathroom.Details
revision to pa#201505196642: relocate 1/2 bath & delete bedroom at g/f, remove 3'6" wall at 2nd level between dining & kitchen and add a new beam at the location and post to ground level, relocate bathroom fixture at 3/f bathroom. | $2,500 |
| Aug 24, 2015 | Completed final sign-off Jul 2016 | 1424 Jones St | Tri-C Designs Incorporated | retrofit ground level for wood frame seismic retrofit program per 2012 iebc appendix a-4. n/a maher ordinanceDetails
retrofit ground level for wood frame seismic retrofit program per 2012 iebc appendix a-4. n/a maher ordinance | $90,000 |
| Aug 24, 2015 | Completed final sign-off Aug 2016 | 1750 18th Av | Tri-C Designs Incorporated | add a full bathroom at rear of ground level & relocate washer & dryer & laundry sink.Details
add a full bathroom at rear of ground level & relocate washer & dryer & laundry sink. | $5,000 |
| May 14, 2015 | Completed final sign-off Feb 2019 | 3810 Divisadero St | C K Construction | legalized as built unit @ ground level. the building had combined 2 units to 1 unit at 4th fl under permit appl #8810605, from 6 units become 5 units building. legalized as built unit is just restore the bldg back to 6 unit bldg. add unit per ordinance no 43-14.Details
legalized as built unit @ ground level. the building had combined 2 units to 1 unit at 4th fl under permit appl #8810605, from 6 units become 5 units building. legalized as built unit is just restore the bldg back to 6 unit bldg. add unit per ordinance no 43-14. | $30,000 |
| May 1, 2015 | Completed final sign-off May 2017 | 435 15th Av | L & G Construction | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4 | $30,000 |
| Apr 28, 2015 | Completed final sign-off Aug 2015 | 1410 Taylor St | P Jordan Builders Inc | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4 for residential portion. commercial soft story under pa#201504224261Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4 for residential portion. commercial soft story under pa#201504224261 | $40,000 |
| Apr 22, 2015 | Completed final sign-off Aug 2015 | 1410 Taylor St | P Jordan Builders Inc | for commercial soft story retrofit & ada improvement per 2012 iebc appendix a-4, install automatic door opener at dry cleaning store and cafe isabella. residential soft story under pa# 201504284760Details
for commercial soft story retrofit & ada improvement per 2012 iebc appendix a-4, install automatic door opener at dry cleaning store and cafe isabella. residential soft story under pa# 201504284760 | $12,000 |
| Mar 30, 2015 | Completed final sign-off Sep 2017 | 722 South Van Ness Av | Bill Wong Construction | alteration of (e) 2 story residential sfd to new child care center. property owned by adjacent church. renovation of interior spaces. accessible path of travel including lula, restrooms. conditional use approved change# 2013.1656c. dated june 12, 2014.Details
alteration of (e) 2 story residential sfd to new child care center. property owned by adjacent church. renovation of interior spaces. accessible path of travel including lula, restrooms. conditional use approved change# 2013.1656c. dated june 12, 2014. | $80,000 |
| Mar 13, 2015 | Completed final sign-off May 2015 | 2012 Pine St | Amone Corp | remove e platform in e 3rd fl exercise room to be replaced with enclosed stoarage and mezzanine aboveDetails
remove e platform in e 3rd fl exercise room to be replaced with enclosed stoarage and mezzanine above | $36,000 |
| Mar 11, 2015 | Completed final sign-off Oct 2015 | 1500 Grant Av | Michael Heavey Construction | replace existing sidewalk with new.Details
replace existing sidewalk with new. | $40,000 |
| Oct 17, 2014 | Never finaled issued Nov 2014, no final | 85 Henry St | #5- revise pa#201409116071 relocate bathroom.Details
#5- revise pa#201409116071 relocate bathroom. | ||
| Sep 16, 2014 | Completed final sign-off Mar 2015 | 2550 Golden Gate Av | Baires Construction Inc | seismic retrofit ground level only for wood frame seismic retrofit program per 2012 international existing bldg. code (iebc), appendix a-4.Details
seismic retrofit ground level only for wood frame seismic retrofit program per 2012 international existing bldg. code (iebc), appendix a-4. | $15,000 |
| Jan 22, 2014 | Never finaled issued Mar 2014, no final | 146 Mcallister St | Hon's Construction Inc. | replace elevator cab. & motor, enclose machine control room, install smoke doors & elevator doors. fire alarm permit separateDetails
replace elevator cab. & motor, enclose machine control room, install smoke doors & elevator doors. fire alarm permit separate | $120,000 |
| Dec 16, 2013 | Completed final sign-off Apr 2014 | 2940 22nd Av | Jimmy Wong | add one new glass skylights (2'x4') above extg nook area.Details
add one new glass skylights (2'x4') above extg nook area. | $4,000 |
| Sep 26, 2013 | Completed final sign-off May 2014 | 211 Clement St | Makita Construction Inc. | renovate existing restaurant dining & kitchen area. renovate (e) store front with new and restroom with new and install automatic door opener to meet ada standard. replace exterior dryrotted wood platform (+/- 2' above grade) with new @ rear of building.Details
renovate existing restaurant dining & kitchen area. renovate (e) store front with new and restroom with new and install automatic door opener to meet ada standard. replace exterior dryrotted wood platform (+/- 2' above grade) with new @ rear of building. | $80,000 |
| Jul 25, 2013 | Expired or cancelled cancelled Oct 2013 | 345 West Portal Av | Bloch Construction Inc | comply with nov 201388114. replace all exterior decorative metal fence and gates with new landscaping area in front of building. portion of fence and gate damaged by car accident. add handrails at each side of front entrance steps.Details
comply with nov 201388114. replace all exterior decorative metal fence and gates with new landscaping area in front of building. portion of fence and gate damaged by car accident. add handrails at each side of front entrance steps. | $10,000 |
| Aug 17, 2012 | Never finaled issued Feb 2013, no final | 400 Grant Av | re-install (1) ada restroom at 2nd floor that has been removed by tenant. relocate path of travel from bush st entrance to grant ave entrance. install smoke guard at 2nd floor elevator lobby.Details
re-install (1) ada restroom at 2nd floor that has been removed by tenant. relocate path of travel from bush st entrance to grant ave entrance. install smoke guard at 2nd floor elevator lobby. | $5,000 | |
| Aug 17, 2012 | Completed final sign-off Jan 2013 | 2109 Taraval St | revision to pa# 201207023933 - delete mezz floor from plan. delete welding & plywood for special inspection.Details
revision to pa# 201207023933 - delete mezz floor from plan. delete welding & plywood for special inspection. | ||
| Jul 18, 2012 | Completed final sign-off Aug 2012 | 223 Leavenworth St | Michael Heavey Construction | to comply with nov #201239661 for work at rear exterior wall: repair deteriorated concrete wall & replace damaged flue pipes in kind. fix all windows in apt #2, at rear only.Details
to comply with nov #201239661 for work at rear exterior wall: repair deteriorated concrete wall & replace damaged flue pipes in kind. fix all windows in apt #2, at rear only. | $5,000 |
| Jul 2, 2012 | Completed final sign-off Jan 2013 | 2109 Taraval St | to compy with nov #201203461. remove 18'-7" of existing bldg from rear. remove as built restroom & replace with one ada unisex restroom. replace entrance door to meet ada standard. relocate existing stairay to mezz. remove & replace mezz floor framing with new.Details
to compy with nov #201203461. remove 18'-7" of existing bldg from rear. remove as built restroom & replace with one ada unisex restroom. replace entrance door to meet ada standard. relocate existing stairay to mezz. remove & replace mezz floor framing with new. | $50,000 | |
| Jun 25, 2012 | Completed final sign-off Feb 2013 | 1499 California St | Hon's Construction Inc. | add metal service ship ladder from 4/f to (e) exterior metal platform in lightwell to roof level for elevator maintenance purposes only. #114- comply with nov 201238102 for window repair in kitchen,and door & lock repair/replacement.Details
add metal service ship ladder from 4/f to (e) exterior metal platform in lightwell to roof level for elevator maintenance purposes only. #114- comply with nov 201238102 for window repair in kitchen,and door & lock repair/replacement. | $15,000 |
| Jun 12, 2012 | Never finaled issued Jun 2012, no final | 25 Kearny St | Associated Builders | replace existing curb ramp at corner of kearny and maiden lane with new ada curb ramp and provide structural support below curb rampDetails
replace existing curb ramp at corner of kearny and maiden lane with new ada curb ramp and provide structural support below curb ramp | $15,000 |
| May 31, 2012 | Completed final sign-off Aug 2012 | 325 Kearny St | Michael Heavey Construction | remove and replace existing sidewalk with new. remove existing sidewalk with new, remove existing rusted steel beams below sidewalk and replace with new steel beams and steel channels and support with steel pipes with conc. footingDetails
remove and replace existing sidewalk with new. remove existing sidewalk with new, remove existing rusted steel beams below sidewalk and replace with new steel beams and steel channels and support with steel pipes with conc. footing | $35,000 |
| Feb 22, 2012 | Completed final sign-off Mar 2012 | 670 Commercial St | Hon's Construction Inc. | #a- violation correction per sf dept of public health routine inspection dd 1/4/12. legalize as built conditioin. relocate exam room #2 @ rear by adding a room in front portion of recetion area. change (e) exam room #2 area to be a break room & exit to rear deck. raise wall height from 7'to 9'Details
#a- violation correction per sf dept of public health routine inspection dd 1/4/12. legalize as built conditioin. relocate exam room #2 @ rear by adding a room in front portion of recetion area. change (e) exam room #2 area to be a break room & exit to rear deck. raise wall height from 7'to 9' | $3,000 |
| Jan 17, 2012 | Completed final sign-off Jan 2013 | 437 Liberty St | Wei Ming Construction | remove dirt at unexcavated area at rear of garage to create a new home office with a wet bar & powder room (half bath). replace existing concrete slab, level garage floor & add conc. footing at one existing post. replace existing conc. driveway ramp with new.Details
remove dirt at unexcavated area at rear of garage to create a new home office with a wet bar & powder room (half bath). replace existing concrete slab, level garage floor & add conc. footing at one existing post. replace existing conc. driveway ramp with new. | $40,000 |
| Apr 25, 2011 | Expired or cancelled cancelled Mar 2020 | 901 Kearny St | replace existing sidewalk with new. comply with the notice of violation #200560305/electrical inspection division for 600 jackson/901 kearny.Details
replace existing sidewalk with new. comply with the notice of violation #200560305/electrical inspection division for 600 jackson/901 kearny. | $300,000 | |
| Feb 17, 2011 | Completed final sign-off Nov 2012 | 3339 20th St | comply w/his nov 200848112 dated 3-14-08: renovate existing storage @ gnd level to a new 2 car garage w/new garage door, new driveway & curb cut @ sidewalk. remove & relocate or replant new street tree. add conc steps @garage door. add concrete steps next to garage door. ab-020 used thru garageDetails
comply w/his nov 200848112 dated 3-14-08: renovate existing storage @ gnd level to a new 2 car garage w/new garage door, new driveway & curb cut @ sidewalk. remove & relocate or replant new street tree. add conc steps @garage door. add concrete steps next to garage door. ab-020 used thru garage | $5,000 | |
| Oct 5, 2010 | Completed final sign-off Jan 2011 | 716 Columbus Av | Michael Heavey Construction | enclose extg wall opening approx. 4'x4'. total 4 openings at basement level. provide level landing for barrier removal at sidewalk at 718 columbus store entrance.Details
enclose extg wall opening approx. 4'x4'. total 4 openings at basement level. provide level landing for barrier removal at sidewalk at 718 columbus store entrance. | $2,000 |
| Sep 28, 2010 | Completed final sign-off Sep 2013 | 933 Union St | Ace Drilling & Excavation | enlarge existing garage by removing soil behind existing retaining wall.Details
enlarge existing garage by removing soil behind existing retaining wall. | $120,000 |
| Jul 29, 2010 | Completed final sign-off Jul 2012 | 3339 20th St | lower existing ground level approx 2'-4" to create enough headroom. replace existing brick footing with new concrete fooitng & remove (e) wood posts & reinforced with new steel beams & posts & seismic upgrade @ ground level only. underground plumbing will be performed & elect work will be performed.Details
lower existing ground level approx 2'-4" to create enough headroom. replace existing brick footing with new concrete fooitng & remove (e) wood posts & reinforced with new steel beams & posts & seismic upgrade @ ground level only. underground plumbing will be performed & elect work will be performed. | $100,000 | |
| Jul 29, 2010 | Completed final sign-off Dec 2010 | 611 Bay St | Tri-C Designs Incorporated | remove and replace dry rotted joists at 1st fl side and rear deck area. voluntary structural strengthening at basement/garage level only.Details
remove and replace dry rotted joists at 1st fl side and rear deck area. voluntary structural strengthening at basement/garage level only. | $50,000 |
| Jul 29, 2010 | Completed final sign-off Jan 2011 | 418 Dellbrook Av | comply w/n.o.v. #201055829 & legalized as-built conc. retaining wall. remove soil from unexcavated area & add a new conc. retaining wall adjacent to existing footing inside garage level. increase floor area of garage level approx 240 sf due to removal of unexcavated area inside garage.Details
comply w/n.o.v. #201055829 & legalized as-built conc. retaining wall. remove soil from unexcavated area & add a new conc. retaining wall adjacent to existing footing inside garage level. increase floor area of garage level approx 240 sf due to removal of unexcavated area inside garage. | $20,000 | |
| Jun 10, 2010 | Completed final sign-off Jan 2011 | 98 25th Av | Steven Lau Construction | 3rd floor sunroom only: raise existing ceiling height approx 2'-0" @ existing master bedroom's sunroom @ 3rd floor.Details
3rd floor sunroom only: raise existing ceiling height approx 2'-0" @ existing master bedroom's sunroom @ 3rd floor. | $8,000 |
| Jun 3, 2010 | Completed final sign-off Jun 2011 | 3416 26th St | Mullins General Construction & Fine Pain | fire damage repair: replace all fire damaged wood joists,decks @ litewell,(1) stairway from grd to roof lvl & (2) stair cover @ roof level in kind. replace kitchen & bathroom's counters, fixtures, plaster walls & ceiling finishes to gyp bd, elec meter,replace windows, enclosed window @ exit stair.Details
fire damage repair: replace all fire damaged wood joists,decks @ litewell,(1) stairway from grd to roof lvl & (2) stair cover @ roof level in kind. replace kitchen & bathroom's counters, fixtures, plaster walls & ceiling finishes to gyp bd, elec meter,replace windows, enclosed window @ exit stair. | $500,000 |
| May 28, 2010 | Completed final sign-off Jan 2011 | 98 25th Av | renovate (e) master bedroom walk-in-closet to create a new bathroom inside the closet @ (e) 3rd. flr. only.Details
renovate (e) master bedroom walk-in-closet to create a new bathroom inside the closet @ (e) 3rd. flr. only. | $15,000 | |
| Dec 8, 2009 | Completed final sign-off Sep 2010 | 675 Pennsylvania Av | to comply w/n.o.v. #200924613 - to remove as-built surfacing concret wall along side yard property line (south side). add concrete block wall planter box @ side yard (south side).Details
to comply w/n.o.v. #200924613 - to remove as-built surfacing concret wall along side yard property line (south side). add concrete block wall planter box @ side yard (south side). | $15,000 | |
| Dec 8, 2009 | Completed final sign-off Sep 2010 | 681 Pennsylvania Av | to comply w/n.o.v. #200926110 - add slurry mix below existing foundation to fill existing void along northern property line.Details
to comply w/n.o.v. #200926110 - add slurry mix below existing foundation to fill existing void along northern property line. | $5,000 | |
| Dec 3, 2009 | Completed final sign-off Sep 2010 | 839 Grant Av | Sincere Construction Company Inc | add new partition walls between 839 and 843 retail stores at ground floor, meazzanine and 2nd floor, and enclose wall and door opening at basement level. add an autromatic door opener @ 839 grant ave entrance door. cut portion of existing floot joist @ mezz level to restore existing catwalk.Details
add new partition walls between 839 and 843 retail stores at ground floor, meazzanine and 2nd floor, and enclose wall and door opening at basement level. add an autromatic door opener @ 839 grant ave entrance door. cut portion of existing floot joist @ mezz level to restore existing catwalk. | $15,000 |
| Oct 15, 2009 | Completed final sign-off Dec 2012 | 1269 03rd Av | Builder Max Inc. | add a glass solarium @ rear of 4th floor roof deck, remove & relocate vertical fire escape ladder to upper roof level from rear of 4th floor to front of 4th floor ( lower roof).Details
add a glass solarium @ rear of 4th floor roof deck, remove & relocate vertical fire escape ladder to upper roof level from rear of 4th floor to front of 4th floor ( lower roof). | $25,000 |